Since January, 2003
            
 (a random before-and-after moment)
February 11, 2007
June 16, 2018 
South Capitol at M, Looking East-Southeast (see more)

Not much to report these days, but instead of digging digging digging looking for teeny tiny stuff to pass along, the reaction of someone who's been doing this way too long is "Hey! Extended vacation!" But here's a few items:
* PARC RIVERSIDE PHASE 2: These are "studies", with materials and colors subject to change, but the architects for the second phase of Toll Brothers' Parc Riverside apartments at Half and K passed along to ANC 6D02 commissioner Stacy Cloyd some images of what the building could look like. (And now you see why when I mentioned them in another post recently I said that Phase 2 doesn't look very different from Phase 1.) The middle image, as seen from Half and I, shows the two Parc Riversideseseses as one long facade, albeit with slightly altered treatments. The other two are views from Half and L.
* REHAB CENTER PROPOSED ON LOWER 8TH: Capitol Hill Corner reports on a proposal to the Bureau of Prisons for a 300-bed resident rehabilitation center (aka "halfway house") to be located at 810 Potomac Ave., SE, across the street from both the Blue Castle and the historic Latrobe Gate to the Navy Yard. Council member Charles Allen and ANC 6B both have weighed in with strong opposition, listing all manner of reasons that this building at the corner of 8th and Potomac (and 8th and M, for that matter) "is not the right site," with 6B commissioner Kirsten Oldenburg quoted as saying, "This is an egregious thing to do to lower 8th, which is transitioning from being under-developed into a residential neighborhood." UPDATE: ANC 6D commissioner Meredith Fascett has posted on Facebook that she is opposing this as well, and says that MPD, Barracks Row Main Street, and the Capitol Riverfront BID are also in opposition.
* COFFEE WITH CHUCK SLIDES: If you want the latest update from the Virginia Avenue Tunnel, here's the slides from the May 18th neighborhood session. There's lots of photos of sections the new tunnel, including some that bloggers would probably be shot on sight for trying to get.
And, an addition a few hours later:
* AKRIDGE SELLING: WBJ says that Akridge is putting on the market its holdings along the east side of 1st Street between K and L, across from Velocity and the Parc Riverside and home until 2011 to the Market Deli and a slew of other now-gone buildings.
Comments (17)
   
 
 More Recent News

JDLand.com Home

Comments

jdc says: (5/25/16 2:49 PM)
Fingers crossed the tunnel project continues to go ahead smoothly. This is such an important project and I am very glad it's moving ahead.


JD says: (5/25/16 2:57 PM)
Yup, I am testing here. That is what I am doing.



JD says: (5/25/16 3:13 PM)
Okay, so you should now be able to include one jpg or gif or png with a comment, but be aware that any even remotely icky uses of this option will result in either suspension or a permanent ban from comments, along with my turning off the option for everyone.

So, enjoy! :-)



JD says: (5/25/16 3:40 PM)
Here's another tidbit (added to the post): Akridge is selling the former Market Deli site, on the east side of 1st across from Velocity and the Parc Riverside:

link


MJM says: (5/25/16 4:25 PM)
Shocked that "Mother Hen Sitting on Her Eggs Akridge" is finally selling the land. They swooped in and bought all that land and never developed it. Just wish some other companies bought that land a decade ago because it probably would have been developed by now.


JD says: (5/25/16 6:09 PM)
@MJM, I did think you of as soon as I saw the news.

I also thought of the Market Deli kittens. And the proposed historic landmarking.



jdc says: (5/26/16 8:49 AM)
I am SO thrilled about the news of that sale. I walk past this disgusting piece of land often (along with what will be Parc 2) and development here cannot come fast enough. Now, if only that cab dispatch would relocate.


MJM says: (5/26/16 9:49 AM)
I'm using the bricks from the old buildings in the community garden - making some use of it. Does that make the garden historic?


NavyYardGuy says: (5/26/16 10:49 AM)
@jdc I wouldnt say it was disgusting..but underdeveloped. Glad that parcel is being sold.

@ JD any update on when the community center will be opening? It looks pretty ready to go..

The winds of development continue to blow in Capitol Riverfront/Navy Yard...


JD says: (5/26/16 10:52 AM)
Nope, not letting politics come in here, @NavyYardGuy. I've deleted the pic, and consider it a warning.

(And I thought my admonishment/warning was too harsh yesterday. Guess not!)




NavyYardGuy says: (5/26/16 11:35 AM)
Understood JD.



JD says: (5/26/16 11:35 AM)
As for the community center, it's not a matter of construction at this point, it's the city getting its operational ducks in a row.


JD says: (5/26/16 11:37 AM)
@NYG, success!

And I do apologize for reacting too harshly in tone. A life-long affliction.



JHUGrad says: (5/26/16 11:54 AM)
Does anyone know who will operate the Community Center? Will they offer daycare?


JD says: (5/26/16 12:01 PM)
Those are the things still awaiting the DC government to officially get all ducks in a row over.


JES says: (5/26/16 12:16 PM)
Well, it's gotta be at least partially open by democratic primary day, cuz we got postcards in the mail telling us that the community center is the new polling place.


jdc says: (5/26/16 2:27 PM)
I meant disgusting in the sense that the area, at least to me, smells of dog urine/feces, and rotting straw. So, yes, disgusting (to me).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

JD on June Construction Update: It's on the same lot--it will "close the square" with the current building. Thei...
Joni on June Construction Update: Where is 4 I Street? Right next to 2 I Street is the car wash, and next to that ...
JD on June Construction Update: DC Water needs a "back of the house," I assume. Plus eventually that side will b... [image]
jdc on June Construction Update: Any reason the DC water building does not have windows on the 'back'? Also, I re...
jdc on June Construction Update: You can't tell it from the photos but the Parc Riverside Phase 2 is sort of awkw...
RMP on June Construction Update: Great pics, JD! Does anyone know what is under construction in the space between...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18

Recent Issued Building Permits Archive  
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
800 NEW JERSEY AVE SE   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.