Since January, 2003
            
 Sliding from Before to After

Conte's Bike Shop, a bicycling retailer with nine Virginia locations, will be opening a full-service operation at Arris at the Yards in early 2017, it's being announced today.
But if you can't wait that long, Conte's will be running a 10-day pop-up version in one of Arri's open retail spaces on Tingey Street starting Thursday, May 19 through May 29th, opening on Thursday through Sunday during each of those two weeks. This means that the store will be open during both Bike to Work Day on Friday, May 20 and Tour de Fat at the Yards on Saturday, May 21.
This pop-up version will have bikes for sale or rent, repair services, clothing, gear, and "expert advice."
The permanent Conte's location will be 2,200 square feet in size, located in the 4th Street portion of Arris's ground floor.
Conte's was founded in 1957 in Newport News, and is apparently still a family-owned operation, with locations in Arlington and Falls Church in addition to elsewhere in Virginia.
The press release from Forest City also says:
"Their shops carry a full line of bikes and accessories including hybrids, mountains, cruisers and road bikes by leading brands including Giant/Liv, Eddy Merckx, BMC, Scott and more, as well as offering gear, accessories clothing and lots of expert advice. They also offer a trade-in policy and used equipment for sale. What’s more, Conte’s Bike Shop prides itself on being a community center and resource for the cycling community, offering events, clinics, structured rides and online resources."
Comments (21)
   
 
 More About Retail

JDLand.com Home

Comments

JD says: (5/17/16 4:34 PM)
Also in the press release:

* The Yards Park Marina is expected to open in June
* District Winery construction expected to start in June, with completion in late 2017
* Site work expected to begin "in coming weeks" on the two Parcel O projects, with a completion date of 2018, but no exact start date announced
* Arris has 115 of its 327 units already leased
* Showplace Icon "expected to begin late this year," but until there's an announced deal with DC Water, treat that news lightly.



JD says: (5/17/16 4:36 PM)
Also, the "interim park area" at 1st and M is almost finished, but they REFUSE to call it by its correct name, Spooky Park.


JES says: (5/17/16 4:37 PM)
Completion date of 2018? And they haven't even started? Having a hearty guffaw at that timeline...


JD says: (5/17/16 4:38 PM)
Nah, not really, generally buildings can take 18-24 months on a "normal" timeline. They could start by the end of this year and still make the end of 2018.


JES says: (5/17/16 4:39 PM)
I guess it just SEEMS like it takes so much longer...


conngs0 says: (5/17/16 4:59 PM)
Awesome news about the bike shop! I was pretty bummed that REI went the NoMa route as opposed to taking over that building south of the DOT (Building 170?). I still think that was a better fit, but I suppose between Conte's and Pacers, the neighborhood will be able to get a large amount of their fitness paraphernalia even without REI.

The lag in progress on the Showplace Icon theater resulting from DC Water's reluctance to move is pretty frustrating. Hopefully that can be worked out sooner rather than later.


CJBabyDaddy says: (5/17/16 4:59 PM)
The PN Hoffman Parcel O sales sign at the corner of 4th & Tingey originally indicated that sales would begin in "Spring 2016." In March 2016, the sign was updated to indicate that sales would commence in "2016." In April, we were informed by PNH to expect sales to begin in the first quarter of 2017.


JD says: (5/17/16 5:05 PM)
As I mentioned in a comment somewhere a few weeks ago, I am shifting 100% back to needing to see shovels in the ground before really believing that any project is getting started. Not saying all new projects are going to grind to a halt, but there is just so much residential inventory newly arrived or already under construction, and I just don't believe that projects are a "given" at this point to be getting underway.



Westnorth says: (5/17/16 5:31 PM)
Yeah, I was surprised to see that Parcel O was not mentioned at all in Forest City's annual report to shareholders. PNH is probably trying to wrap up sales at 525 Water in Southwest before starting sales at the Yards.


JD says: (5/17/16 5:33 PM)
A reader told me within the past few days that the Arris leasing office told him that Parcel O won't begin until 2018. I don't tend to take leasing people at their word on this sort of stuff (having heard way too many stories over the years of out-and-out lies at various leasing offices about starting dates at neighboring sites), but it's something to file away as a potentially interesting data point.



snakegriffin says: (5/17/16 5:35 PM)
Heard from multiple realtors that given the demand and the neighborhood they expect the Parcel O prices to be comparable to the other PNH units in SW. At those price points (and at this timeline), we'll be out. I'd rather renovate a rowhouse for that amount of money.


JES says: (5/17/16 6:34 PM)
Are the apartment building and condo building at Parcel O designed to be built at the same time, or could they start one without starting the other? Given that renters and buyers are different markets (and there's a dearth of for sale property in our neighborhood), I don't think the condo building would have any trouble whatsoever selling. With all the new rentals coming online, could be different story for getting the apartments rented though. And if they have to be built together, that could push the entire timeline back I suppose.


JD says: (5/17/16 9:10 PM)
I think they could be built separately, but that's not speaking to financial agreements/construction agreements/etc.


CJBabyDaddy says: (5/17/16 10:55 PM)
The 35% drawings from last year show Parcels O-1 and O-2 sharing an underground parking garage 2 levels below grade. So, I've always assumed that condo building and apartment building construction will be simultaneous.


JD says: (5/17/16 10:58 PM)
That is the plan, but it's not a design that irrevocably requires the two to be built at the same time. Look at Velocity, and how they built the garage for what ended up being the Parc Riverside. With money, and lawyers, all sorts of initial plans can be altered. :)


jdc says: (5/18/16 10:14 AM)
And that's something this area definitely does not have a lot of, money and lawyers ;)


JD says: (5/19/16 2:41 PM)
I haven't gotten a press release on this, so no "real" post on it, but Bisnow says that All-Purpose Pizza has been signed at Dock 79:

Bisnow: link

City Paper on All-Purpose's location on 9th St. downtown: link


JD says: (5/19/16 2:44 PM)

It's from the Red Hen and Boundary Stone folks: link


JES says: (5/19/16 4:05 PM)
...but who's taking the retail bay that has the roof deck thingy?


conngs0 says: (5/19/16 11:08 PM)
I wonder if this will spur Nicoletta to get moving in an effort to gain a foothold in the neighborhood.

I've had a chance to visit Il Parco twice so far. Not bad at all (and the service was significantly better than it was at Park Tavern), but I think the pizza is significantly better when you eat in as opposed to take it home. I suppose you can say the same thing about almost any pizza, but that thin crust really does need to be eaten right out of the oven. So I'm still looking for an upgrade over Papa Johns when it comes to delivery/takeout. Doesn't look like All Purpose will fill that niche, but I'll still look forward to giving it a shot!


JES says: (5/20/16 10:53 AM)
@conngs0

Yeah, I'm not sure what it is about delivery pizza around here, but almost all of it sucks. Pizza Bolis isn't bad though, and We the Pizza also delivers here.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

walt on West Half Now: I love the West Half logo. But there should probably be a $$ in there somewher...
CJBabyDaddy on Entertainment Venue Addition: @conngs0: And let the church say “Amen.” You and I need to storm Lerner HQ and...
conngs0 on Entertainment Venue Addition: CJ, I am willing to go to Nats Park in October even after an inevitable playoff ...
CJBabyDaddy on Entertainment Venue Addition: @conngs0: I thought the Nats’ recurring playoff collapses were the worst things...
GarfieldPark on Entertainment Venue Addition: ORE residents received a notice that the sidewalk will be closing on NJ avenue (...
202_cyclist on Entertainment Venue Addition: @conngs0— I agree, I couldn’t care less about sports betting but I am glad there...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
08/20/19 
YAAN REAL ESTATE LP / MITCH A. PERMUY; MITCH A. PERMUY
E1910356 / SUPPLEMENTAL
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
150 I ST SE   
08/20/19 
null
E1910665 / SUPPLEMENTAL
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
419 K ST SE   
08/19/19 
FAROOQ MITHA / KYLE YOST; KYLE YOST
SOL1901385 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
08/21/19 
FAROOQ A MITHA / null
E1910733 / SUPPLEMENTAL
100 M ST SE 20003   
08/21/19 
PARSONS / null
E1910735 / SUPPLEMENTAL
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1275 NEW JERSEY AVE SE   
08/20/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW; JUSTIN BELLOW; TBD
BCIV1900130 / CONSTRUCTION
Civil permit for grading, site demo, and installation of sediment erosion control measures Site utilities, provide property. Stormwater management will be under subsequent permits.
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
08/19/19 
DC WATER / null
E1910631 / SUPPLEMENTAL
79 POTOMAC AVE SE   
08/19/19 
RIVERFRONT HOLDINGS I LLC / null
E1910633 / SUPPLEMENTAL
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.