Since January, 2003
            
 (a random before-and-after moment)
June 16, 2007
March 17, 2019 
South Capitol at Potomac, Looking South-Southwest (see more)

Conte's Bike Shop, a bicycling retailer with nine Virginia locations, will be opening a full-service operation at Arris at the Yards in early 2017, it's being announced today.
But if you can't wait that long, Conte's will be running a 10-day pop-up version in one of Arri's open retail spaces on Tingey Street starting Thursday, May 19 through May 29th, opening on Thursday through Sunday during each of those two weeks. This means that the store will be open during both Bike to Work Day on Friday, May 20 and Tour de Fat at the Yards on Saturday, May 21.
This pop-up version will have bikes for sale or rent, repair services, clothing, gear, and "expert advice."
The permanent Conte's location will be 2,200 square feet in size, located in the 4th Street portion of Arris's ground floor.
Conte's was founded in 1957 in Newport News, and is apparently still a family-owned operation, with locations in Arlington and Falls Church in addition to elsewhere in Virginia.
The press release from Forest City also says:
"Their shops carry a full line of bikes and accessories including hybrids, mountains, cruisers and road bikes by leading brands including Giant/Liv, Eddy Merckx, BMC, Scott and more, as well as offering gear, accessories clothing and lots of expert advice. They also offer a trade-in policy and used equipment for sale. What’s more, Conte’s Bike Shop prides itself on being a community center and resource for the cycling community, offering events, clinics, structured rides and online resources."
Comments (21)
   
 
 More About Retail

JDLand.com Home

Comments

JD says: (5/17/16 4:34 PM)
Also in the press release:

* The Yards Park Marina is expected to open in June
* District Winery construction expected to start in June, with completion in late 2017
* Site work expected to begin "in coming weeks" on the two Parcel O projects, with a completion date of 2018, but no exact start date announced
* Arris has 115 of its 327 units already leased
* Showplace Icon "expected to begin late this year," but until there's an announced deal with DC Water, treat that news lightly.



JD says: (5/17/16 4:36 PM)
Also, the "interim park area" at 1st and M is almost finished, but they REFUSE to call it by its correct name, Spooky Park.


JES says: (5/17/16 4:37 PM)
Completion date of 2018? And they haven't even started? Having a hearty guffaw at that timeline...


JD says: (5/17/16 4:38 PM)
Nah, not really, generally buildings can take 18-24 months on a "normal" timeline. They could start by the end of this year and still make the end of 2018.


JES says: (5/17/16 4:39 PM)
I guess it just SEEMS like it takes so much longer...


conngs0 says: (5/17/16 4:59 PM)
Awesome news about the bike shop! I was pretty bummed that REI went the NoMa route as opposed to taking over that building south of the DOT (Building 170?). I still think that was a better fit, but I suppose between Conte's and Pacers, the neighborhood will be able to get a large amount of their fitness paraphernalia even without REI.

The lag in progress on the Showplace Icon theater resulting from DC Water's reluctance to move is pretty frustrating. Hopefully that can be worked out sooner rather than later.


CJBabyDaddy says: (5/17/16 4:59 PM)
The PN Hoffman Parcel O sales sign at the corner of 4th & Tingey originally indicated that sales would begin in "Spring 2016." In March 2016, the sign was updated to indicate that sales would commence in "2016." In April, we were informed by PNH to expect sales to begin in the first quarter of 2017.


JD says: (5/17/16 5:05 PM)
As I mentioned in a comment somewhere a few weeks ago, I am shifting 100% back to needing to see shovels in the ground before really believing that any project is getting started. Not saying all new projects are going to grind to a halt, but there is just so much residential inventory newly arrived or already under construction, and I just don't believe that projects are a "given" at this point to be getting underway.



Westnorth says: (5/17/16 5:31 PM)
Yeah, I was surprised to see that Parcel O was not mentioned at all in Forest City's annual report to shareholders. PNH is probably trying to wrap up sales at 525 Water in Southwest before starting sales at the Yards.


JD says: (5/17/16 5:33 PM)
A reader told me within the past few days that the Arris leasing office told him that Parcel O won't begin until 2018. I don't tend to take leasing people at their word on this sort of stuff (having heard way too many stories over the years of out-and-out lies at various leasing offices about starting dates at neighboring sites), but it's something to file away as a potentially interesting data point.



snakegriffin says: (5/17/16 5:35 PM)
Heard from multiple realtors that given the demand and the neighborhood they expect the Parcel O prices to be comparable to the other PNH units in SW. At those price points (and at this timeline), we'll be out. I'd rather renovate a rowhouse for that amount of money.


JES says: (5/17/16 6:34 PM)
Are the apartment building and condo building at Parcel O designed to be built at the same time, or could they start one without starting the other? Given that renters and buyers are different markets (and there's a dearth of for sale property in our neighborhood), I don't think the condo building would have any trouble whatsoever selling. With all the new rentals coming online, could be different story for getting the apartments rented though. And if they have to be built together, that could push the entire timeline back I suppose.


JD says: (5/17/16 9:10 PM)
I think they could be built separately, but that's not speaking to financial agreements/construction agreements/etc.


CJBabyDaddy says: (5/17/16 10:55 PM)
The 35% drawings from last year show Parcels O-1 and O-2 sharing an underground parking garage 2 levels below grade. So, I've always assumed that condo building and apartment building construction will be simultaneous.


JD says: (5/17/16 10:58 PM)
That is the plan, but it's not a design that irrevocably requires the two to be built at the same time. Look at Velocity, and how they built the garage for what ended up being the Parc Riverside. With money, and lawyers, all sorts of initial plans can be altered. :)


jdc says: (5/18/16 10:14 AM)
And that's something this area definitely does not have a lot of, money and lawyers ;)


JD says: (5/19/16 2:41 PM)
I haven't gotten a press release on this, so no "real" post on it, but Bisnow says that All-Purpose Pizza has been signed at Dock 79:

Bisnow: link

City Paper on All-Purpose's location on 9th St. downtown: link


JD says: (5/19/16 2:44 PM)

It's from the Red Hen and Boundary Stone folks: link


JES says: (5/19/16 4:05 PM)
...but who's taking the retail bay that has the roof deck thingy?


conngs0 says: (5/19/16 11:08 PM)
I wonder if this will spur Nicoletta to get moving in an effort to gain a foothold in the neighborhood.

I've had a chance to visit Il Parco twice so far. Not bad at all (and the service was significantly better than it was at Park Tavern), but I think the pizza is significantly better when you eat in as opposed to take it home. I suppose you can say the same thing about almost any pizza, but that thin crust really does need to be eaten right out of the oven. So I'm still looking for an upgrade over Papa Johns when it comes to delivery/takeout. Doesn't look like All Purpose will fill that niche, but I'll still look forward to giving it a shot!


JES says: (5/20/16 10:53 AM)
@conngs0

Yeah, I'm not sure what it is about delivery pizza around here, but almost all of it sucks. Pizza Bolis isn't bad though, and We the Pizza also delivers here.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

RMP on Signage, and Not-Yet-Signage: Not sure if this signage is being saved for a future post, but I know it's one t... [image]
JES on Retail News: FYI, we had Morini over to Velocity yesterday for an event and they confirmed th...
JD on Retail News: If you want to help support Van Ness Elementary via their silent auction, up for...
202_cyclist on Retail News: RMP-- not to quibble but I assume Winter 2019 is Dec. 2019. There is still suff...
RMP on Retail News: @202_cyclist by my count they've only got a week left if they're going to do &qu...
202_cyclist on Retail News: @RMP— I give up. What is the mistake on the ad?
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19
1300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/17/19
400 B/O 2ND ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/16/19
70 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/15/19
500 B/O L ST SE   ROBBERY  02/14/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
02/22/19 
FC 1331 LLC / null
P1904018 / SUPPLEMENTAL
   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
2 I ST SE   
02/22/19 
MCDONALDS CORPORATION / null
P1904020 / SUPPLEMENTAL
150 I ST SE   
02/19/19 
SQUARE 737 LLC / DANIEL R. RUDE
P1903909 / SUPPLEMENTAL
(4) Fire pits (1) Water Coolers (4) Rooftop units Sanitary piping, Storm piping
   
02/21/19 
WILLIAM C SMITH CO / null
E1904635 / SUPPLEMENTAL
   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
02/22/19 
BRIAN HUSEMAN / MATTHEW MALASKA
P1904003 / SUPPLEMENTAL
   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
250 M ST SE   
02/21/19 
SQUARE 769 LLC / BRIAN C STROTT
B1813732 / CONSTRUCTION
9 story office building with 3 levels below grade. 188,000 gross sqft
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
880 NEW JERSEY AVE SE   
02/21/19 
880 NEW JERSEY AVENUE LLC / CLYDE HURST; CHRISTOPHER P COWIE
B1901729 / CONSTRUCTION
alterations to an existing 688 SF vacant space to add mechanical, plumbing and electrical fixtures to accommodate a future tenant. Future tenant fit out will be provided under a separate permit. This permit is for the landlord work only. The existing space is recently constructed building shell that has not been occupied by a previous tenant.
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.