Since January, 2003
            
 Sliding from Before to After

Via ANC 6D07 commissioner Meredith Fascett, there is going to be a public meeting on Tuesday, May 10 about the plans for Joy Evans Park, the public space a lot of people may not even know about just to the east of Van Ness Elementary School between L and M Streets, SE.
The park's stewardship is a typical DC mishmash, with the land owned by the National Park Service and management handled by DC's Department of Parks and Recreation, but with a memorandum of understanding now in place to allow DC Public Schools to use a portion of the land for "recreation and educational space" for Van Ness.
An initial notion of how the park space could be laid out is above, but there are many questions and notions still to be determined, as laid out in Meredith's Facebook post. Apparently DCPS has money this year to build a playground, an outdoor classroom and garden, and an "open turf area" for free play. But DPR does not have any funding for Joy Evans, and so the future remains unclear in terms of the renovation of the historic Lincoln Playground Building, the possible demolition of the Lincoln Capper pool and the adjacent "therapeutic recreation building" (what, you didn't know there is a therapeutic recreation building there?), and perhaps future playing fields and splash pads.
The May 10 meeting is at Van Ness at 6:30 pm. You can also contact Meredith with comments, concerns, questions, remarks, observations, opinions, notes, or feedback.
The photo at right was taken in 2007 from the roof of the old Capper Seniors building in its final days. You can see the general footprint of the Joy Evans Park along the lower part of the photo, with the Lincoln Capper pool and therapeutic recreation building cut off and the Lincoln Playground Building visible at lower right, with the grassy areas at left where the DCPS Phase 1 plans are to be built.
(Maybe I can get up on the roof of the Bixby at some point to take a current version, especially given the changes at Van Ness, including the new playground on the footprint of the parking lot that I can't believe I don't have even the most cursory photo of. I think I'm a-skeered of pointing my camera through a fence at an active playground and being promptly hauled off.)
Also, note that at the top of the site plan is "6th Street SE" -- this is the planned new block of 6th between L and M, running between this park area and the Bixby.
And, speaking of changes at Van Ness, I have been remiss in not mentioning the very visible construction along M Street of the new second floor above the gymnasium. But I took a picture!
Comments (10)
   
 
 More About Van Ness Elementary

JDLand.com Home

Comments

conngs0 says: (5/2/16 10:38 AM)
Thanks for the update, JD! I of course had no idea that this space could potentially be turned into a field/park. It seems that an open field for soccer, football, etc. would be very beneficial. Although the neighborhood has a decent amount of "green space" at Yards Park and Canal Park, those aren't quite conducive to playing sports (e.g., one might be a able to throw the football with a friend at either place for a little while, but they'll inevitably have to stop as the park gets crowded on a nice day). Likewise, kids in Capitol Quarter and surrounding apartment buildings like the Bixby (eventually) might not be allowed to avail themselves of the fields at Randall Recreation Center or Garfield Park (I assume parents don't want them traveling alone too far), while an open space here might be a safer distance from home.


202_cyclist says: (5/2/16 11:19 AM)
I hope that historic house is put to good use. I think a neighborhood-serving cafe like Lot 380 would be great there, being close to the Bixby, the new community center, and the Marine barracks.

Also, the new community center looks really nice. Any update on when it will open?


JD says: (5/2/16 11:21 AM)
Re, community center, there are still some DC government i's to dot and t's to cross in terms of agreements being hammered out for the center's operations, etc. Hopefully not too much longer.



NJAve says: (5/2/16 2:11 PM)
@202_cyclist: The historic house is planned to be bathrooms and storage.


NJAve says: (5/2/16 2:13 PM)
Hopefully the community center will be open by the June primary elections as that is our new polling location.


Shogungts says: (5/2/16 5:28 PM)
The word on JD is getting out: link



JD says: (5/2/16 5:48 PM)
An overnight sensation, after 13 years! :)


CJBabyDaddy says: (5/2/16 7:29 PM)
Time to put all my autographed JDLand memorabilia up on eBay!


202_cyclist says: (5/3/16 10:13 AM)
Folks-- it is with a heavy heart that I note that as I am writing this, we are losing a dear friend. The atenna tower for the Display Ship Barry is being removed at this very moment.


CJBabyDaddy says: (5/3/16 10:45 AM)
Surely, Navy Secretary Mabus and Mayor Bowser are going to have JD christen the Barry as it leaves on its ~sniffle~ final voyage.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

bdj on Tidbits: Anyone have any feedback on the new cleaners? I’m looking for a new place. What’...
CJBabyDaddy on Tidbits: @202: I share your skepticism. Even if built, it still seems too isolated from ...
202_cyclist on Tidbits: Is the 11th Street Bridge Park actually going to happen? Although I think it wo...
GarfieldPark on Tidbits: I saw the cleaners is open underneath Park Chelsea on I Street
Capyardsres on Tidbits: So there is a bit of a thing going on in 70 Capitol Yards. There was a sign by ...
jdc on Tidbits: Finally made it to All Purpose - unfortunately, it was too hot for me to be inte...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Shoplifting
 07/19/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/18/19
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/17/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19

Recent Issued Building Permits Archive  
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
   
07/17/19 
BAKER DC LLC / CHRISTINE LONG
AH1901077 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
71 POTOMAC AVE SE   
07/19/19 
DANIELA SOTIROKOS / DANIELA SOTIROKOS; KONE
EN1902058 / SHOP DRAWING
Installation of three (3) new elevators
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
   
07/16/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909416 / SUPPLEMENTAL
   
07/17/19 
FC BOILERMAKER LLC / ;
P1907864 / SUPPLEMENTAL
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
   
07/15/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909370 / SUPPLEMENTAL
   
07/18/19 
FC BOILERMAKER LLC / ;
P1907922 / SUPPLEMENTAL
   
07/19/19 
FC BOILERMAKER LLC / DEVON DWIGHT ROSE; DEVON DWIGHT ROSE
P1907992 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.