Since January, 2003
            
 (a random before-and-after moment)
September 20, 2009
September 6, 2015
9th at Virginia, Looking North-Northwest (see more)

Continuing to catch up....:
* JBG HALF STREET ZONING OK: On Monday night the Zoning Commission gave unanimous final approval to JBG's plans for its 420-unit apartment/condo/retail building on Half Street immediately north of Nats Park. Construction could get underway late this year (after baseball season).
* CRANE RESCUE: A construction worker at F1rst on 1st St. SE had to be rescued by firefighters via "high-angle rescue" on Tuesday. (Fox 5)
* DCBFIT OUT, CHURCH IN: I alas never got it posted here that the little DCBFit gym in the ground floor of the Courtyard Marriott/Capitol Hill Tower closed back in February. But now the space has a new tenant--the Waterfront Church, which has been operating out of the Courtyard since its founding in 2014.
* THE NEW FLAVORS ARE HERE!: Ice Cream Jubilee, fresh off its second-in-a-row Best Ice Cream in DC title in City Paper's Best of DC voting, announced new seasonal flavors on Tuesday: Chocolate Matzo Crack, Cherries Jubilee, Double Stout Caramel, and a Fig, Port, & Goat Cheese combo.
* TUNNEL OPEN HOUSE: Time for another Virginia Avenue Tunnel Quarterly Open House, on Thursday, April 14, from 5:30 to 7:30 pm at the Courtyard Marriott at New Jersey and L. There's no formal presentations, but representatives of the project are on hand to provide updates and answer questions. Lots of lane-shifting going on these days as temporary bridge decks get built on 3rd, 8th, and 11th. And the intersection of 7th and Virginia is expected to close for about two weeks starting in early May to get its deck installed. CSX also expects to return 3rd Street to two-way traffic "near the end of April."
Comments (10)
   
 
 More Recent News

JDLand.com Home

Comments

JES says: (4/13/16 11:38 AM)
I wonder how long the eventual dismantling of the fairgrounds is gonna take. I can't imagine hauling all those shipping containers out of here is going to be a short undertaking.


jdc says: (4/13/16 11:45 AM)
Hum, good point JES. Anyone recall how long it took to assemble that eyesore?


JD says: (4/13/16 11:46 AM)
Didn't take long at all. Won't take long at all to haul them off.


MJM says: (4/13/16 12:53 PM)
Bring in a crane and bunch of flatbed trucks and off they go. Perhaps Chix can recycle one as part of their decor.


dude says: (4/13/16 10:45 PM)
7th and Virginia to be closed for two weeks sounds like a fun pain in the rear. That means I'll need to go to 8th and probably have to wait in a bit of traffic before turning back this way. City life is hard.


MJM says: (4/13/16 10:50 PM)
Dude - or take C ST SW exit from 395 and then go down Washington to D then down NJ Ave. City life is easy if coming from that way.


G Street says: (4/14/16 4:05 PM)
Looks good, except for the architecture rendering that has some kid with a Nationals #34 jersey on -- and it doesn't say HARPER on the back. Nooooooooooooo... (-:


dude says: (4/14/16 10:11 PM)
Oh MJM, sounds like a plan. The ol' go north to go south technique.


JD says: (4/15/16 9:11 AM)
WC Smith sending out a press release saying that the first residents are moving into the Park Chelsea today....


JD says: (4/15/16 9:17 AM)
... And the Dock 79 leasing center is now open.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

JD on Slider-Palooza, March 2019: I went to Poplar Point this morning, and got shots for some sliders-to-be: https...
dude on Slider-Palooza, March 2019: Slide, slide, slippity slide.
JD on Slider-Palooza, March 2019: Enjoy the calm news-free weekend, everybody!
202_cyclist on Signage, and Not-Yet-Signage: @michaelj-- it is actually 818 Potomac Ave. Condos are planned here, where the ...
michaelj on Signage, and Not-Yet-Signage: Hi JD - Any news on what the new project is on the SW corner of L SE and 9th SE?...
JD on Signage, and Not-Yet-Signage: In other news, residents of F1rst have been alerted that there is a deal for JBG...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
4 I ST SE   
03/19/19 
null
E1905494 / SUPPLEMENTAL
150 I ST SE   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.