I happened to wander up and down 3rd Street a couple of times on Thursday, and so got a good look at how the street is now temporarily set up as CSX works to build the temporary decking over the tunnel construction at the intersection with Virginia Avenue.
As mentioned a few days back, it was decided that instead of closing the intersection altogether, traffic would become one way northbound during the deck construction, with any traffic headed south of the freeway needing to turn left at G Street and then right on 4th Street to come under the freeway. But traffic can still come south of G in order to turn left into the Results parking lot or right to take the 3rd Street ramp to the Southeast Freeway.
As you can see in these terribly exciting photos, northbound traffic is currently in a small "chute" of sorts just south of Virginia, just west of where digging has begun. Then the area opens up under the freeway.
Pedestrians heading either north or south of the freeway are on the sidewalk on the east side, then must cross to get to a temporary walkway west of the "chute" on the south side of the intersection.
I went by about four times, at 1:30, 3:00, 5:00, and 8:30 pm. I saw no big backups on either side of the freeway, though did see one person turn into the Results driveway to then backup and head north back to G.
There are flaggers watching the traffic during construction hours (and also were taking a few seconds to glare pointedly at crazy ladies taking photos of the configuration), but when I passed by at 8:30, there were no workers on site, and I watched two vehicles come south under the freeway past the Road Closed signs. There was no northbound traffic, so they were able to do it, but it's something that people using that intersection outside of the hours that the workers are on site might want to be watching for.
I asked CSX representatives about the first few days of work, and whether there might be any tweaks coming now that they've seen it in action. This is their statement:
"We appreciate the community’s patience and cooperation as we work to install the temporary street deck at the intersection of 3rd Street and Virginia Avenue. CSX is working as quickly as safety allows to install the temporary bridge and restore two-way traffic to 3rd Street. In the meantime, in conjunction with DDOT’s traffic experts, we continue to make adjustments to the directional signs and traffic control devices through the 3rd Street and Virginia Avenue intersection, to optimize the flow of traffic through the area. We are placing new signs north of G Street on 3rd Street to help increase awareness of the one-way traffic below the freeway, and are hopeful that more drivers will obey the signs as they become familiar with the temporary changes."
As the deck construction eventually works its away across the entire intersection, watch for the patterns to change. It is expected to be "several weeks" before the deck is completed and two-way traffic is restored.
If you have questions or concerns about this or any other part of the Virginia Avenue Tunnel construction, the next Coffee with Chuck is on Wednesday, March 16, at 8 am.
PS: Thanks to all who came to Scarlet Oak for Happy Hour on Thursday! It was great meeting a lot of readers and commenters "in real life," and I think there maybe ought to be another one before too much longer. Once I get my voice back--I'm not used to actually talking to human beings that much.
Comments (4)
   
 
 More About Traffic Issues

JDLand.com Home

Comments

GM100 says: (3/12/16 7:44 AM)
I was driving northbound on 3rd at about 7pm on Wednesday and a car was coming at me going the wrong way (southbound). He looked panicked and pulled over and I rolled my window down to tell him the traffic pattern had changed and it was one-way now, but I'm thinking the "road closed" signage isn't quite getting the point across. I think they need a "do not enter"?


dude says: (3/12/16 8:22 AM)
People can't (well, don't or won't) read. I'm not surprised at all.

I've already experienced one situation where a car coming south was simply trying to avoid the barrier AND the guy in the orange vest who was waving and yelling at the person that they coudlnt continue south.


E. Masquinongy says: (3/14/16 1:05 PM)
Looking at the pictures, I can understand the confusion.

The sign says "road closed", but yet the left half is open. I does not say "do not enter," nor is there a "one way" pointing north, nor is there a "detoir 3rd street southbound" sign point east, or anything like that. Generally when there is lane closure there is a flagman there to alternate the traffic. If you have been driving south through there for years, reading comprehension is not the issue: signage is.


jg says: (3/14/16 2:06 PM)
The biggest problem is for folks driving westbound on Virginia Avenue. There is a small sign on the right side of the road near the intersection with 4th Street indicating 3rd Street is closed (can't recall the exact text), but it is very small and all the way to the right - not a spot cars intending to make a left turn on to 3rd Street will be looking. While driving NB on 3rd and stopped at the light at 3rd/VA Ave/I-695 Ramp, I've seen a few cars approach 3rd Street from Virginia Ave thinking they are going to turn left, then come to a screeching halt upon realizing that it's not possible - it's an accident waiting to happen.

There should really be large, electronic signage at 4th & Virginia with a clear message that SB 3rd Street traffic needs to detour to 4th Street instead. I know several people have requested that CSX/DDOT improve the signage, but not sure if it will happen. Hopefully it doesn't take an accident to force the improvements.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on I'm Dreaming of: A long time ago, in a neighborhood not so far away, Huey's 24-7 Diner was in the...
bdj on I'm Dreaming of: DC crossing (the place being built on 1st between K and I) has some pretty massi...
CJBabyDaddy on I'm Dreaming of: Two things everybody might agree on: A popular 24-hour diner somewhere in the ‘...
VelocityChris on I'm Dreaming of: Agreed JES, 24 hour diner would be perfect! To add another decent DC diner, Ari'...
CJBabyDaddy on I'm Dreaming of: @RMP: If anyone’s organizing a GoFundMe for more of those awesome crosswalk-blo...
JES on I'm Dreaming of: an "urban style" IHOP or waffle house down here would be awesome, main...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
   
12/12/19 
FC 1346 HOLDCO I L L C / ;
P2002122 / SUPPLEMENTAL
82 I ST SE   
12/13/19 
GDVC EYE STREET LLC / ALYSSA CARRABIS; IRON FISH CONSTRUCTION IRON FISH CONSTRUCTION
B2002764 / CONSTRUCTION
SCOPE OF WORK: CONSTRUCTION OF A NEW 120 SQSF CLOSET SPACE WITHIN AN EXISTING PARKING GARAGE. NO CHANGE IN EGRESS OR PATH OF TRAVEL. MAINTAIN UNOBSTRUCTED PATH OF EGRESS AS REQUIRED BY CODE THROUGH CONSTRUCTION.
408 L ST SE   
12/11/19 
JOSEPH LEBLANC / KYLE YOST
SOL2000412 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
12/13/19 
JOSEPH F LEBLANC / null
E2002722 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
   
12/12/19 
CXS PROPERTIES GROUP / CHARLES C. BAKER; CHARLES C. BAKER
P2002143 / SUPPLEMENTAL
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.