While move-ins are probably still a good two months away, the folks at the Park Chelsea at 880 New Jersey Ave., SE, have now opened their ground-floor leasing center inside the building.
So of course I had to immediately scurry over to get some photos of both this space and the one-bedroom model units that are currently available.
If you have your heart set on a unit on the 2nd, 3rd, or 4th floors, pre-leasing has already begun, with the "release" of units expanding upwards in coming weeks.
This will actually be the leasing center for all three buildings on this block, officially known as "The Collective." Agora (aka the Whole Foods Building) is already under construction immediately to the north, and then the Garrett will come eventually along 2nd Street. All together there will be close to 1,200 units when build-out is finished.
Alas, despite my best attempts at looking sad, forlorn, depressed, despondent, crestfallen, and miserable, I didn't get to see the amenity spaces throughout the rest of the building, as work is still in progress. And two-bedroom models aren't available just yet, either.
Check out the full gallery, but here's a preview.
The official web site has floor plans, details on the amenities, and contact information.
Comments (15)
   
 
 More About Development News

JDLand.com Home

Comments

dude says: (2/11/16 3:38 PM)
Hate when the sad face doesn't work.


JD says: (2/11/16 3:52 PM)
And I am well-practiced at it, too.


conngs0 says: (2/11/16 3:53 PM)
Thanks for the sneak peak, JD! A lot of Mad Men inspired décor, no? Speaking of which, it's definitely a good idea to include a bar in the leasing center! You definitely want to start any apartment showcase with a cocktail. All in all, it looks ok to me. I'm excited to see how the neighborhood changes as these projects start to wrap up!


CJBabyDaddy says: (2/11/16 5:34 PM)
You tried "sad, forlorn, depressed, despondent, crestfallen, and miserable"? Wow, you must be exhausted. Cut to the chase next time. Hit 'em hard. Go straight to "sullen."


JES says: (2/11/16 8:34 PM)





BLT says: (2/11/16 9:42 PM)
Good lord. Did they purposely make it that hideous?? Meryl Streep wouldn't step foot in that building. Thaaat's all.


BLT says: (2/11/16 10:03 PM)
Do I spy missing squares from the rug in the lobby??


JD says: (2/11/16 10:13 PM)
I believe that is intentional.

(And JES's comment was worthy of my making it a displayed .jpg!)


jdc says: (2/12/16 8:55 AM)
Seems very run of the mill for this type of project. Nothing stands out, except for the outside of the building. Still, apartments are apartments and I have no doubt they will fill promptly.


JD says: (2/12/16 9:04 AM)
I do think that the whole "amenity space" thing is where a lot of new apartment buildings are investing, since you kids seem to be just fine with hanging out in "public" spaces with other people. Those of us who like to squirrel ourselves away into a private cave don't quite understand it. :)



RMP says: (2/12/16 9:10 AM)
Kind of disappointing. They've spent so much time marketing the building as completely over-the-top awesome. Maybe that was only referring to the amenities that you didn't get to see? The model units look pretty plain. Any idea what kind of rent they're asking for a floorplan like the model?


MJM says: (2/12/16 11:48 AM)
Maybe that is where Hilton got their ideas for the Tru brand of hotels link


adamdonovan says: (2/12/16 4:58 PM)
How did they manage to make it look dated already? Yuck.


splashdc@verizon.net says: (2/16/16 1:39 AM)
Jackie, what is the 2/9/16 reference to CSX building 227 units - where, behind 82 "I"? And what do you think will happen to the U-Haul and Public Storage buildings given the apparent high-rise pattern for South Capitol?


JD says: (2/16/16 7:45 AM)
It's just a mistake in the permits database, that's a permit for 82 I.

As for the storage building, I don't doubt that developers are dreaming of getting it, and I think JBG mentioned their desire for it during the approvals process for 1244 South Capitol - Just a matter of when/if the owners decide to sell. I think U-Haul might have more time, more like after the soccer stadium and the new Douglass Bridge are finished.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Catching Up With: @spiritequality: Rhymes with “groovy tea waiter” and “newbie fee hater?”
JNB on Catching Up With: HQ2 to Crystal City. Just announced.
spiritequality on Catching Up With: Any update on the project that rhymes with smoothly bee eater?
JD on Catching Up With: @202, they say they are "nearing the end." But I'm also guessing the sale of you...
VelocityChris on Catching Up With: Anyone heard any updates on the Hatoba ramen place that's going into the 100 Mon...
202_cyclist on Catching Up With: It looks like all of the CSX construction equipment has been cleared from the lo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/09/18
700 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 11/09/18
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/08/18
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/07/18
800 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/30/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/18
50 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
100 B/O O ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
1400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/26/18
100 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 10/23/18
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/23/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/22/18
900 B/O 5TH ST SE   HOMICIDE
Murder I
 10/20/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/19/18
400 B/O M ST SE   THEFT
Shoplifting
 10/17/18
100 B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/17/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/23/18 
null / ANDY MCKELVEY
SP1800044 / CONSTRUCTION
Construct outdoor swimming pool on 10th floor roof of new building
1013 4TH ST SE   
11/05/18 
EVA WALTER / KYLE YOST
SOL1900066 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
11/07/18 
EVA WALTER / null
E1901297 / SUPPLEMENTAL
1346 4TH ST SE   
10/18/18 
FC 1346, LLC / DFM DEVELOPMENT SERVICES, LLC
B1809670 / CONSTRUCTION
Parcel O-2 at the Yards. Revision to Permit B1610576 for installation of flood wall on 5th Street, SE, the reduction of roadway width, and widening of sidewalk to provide adequate pedestrian clear space between flood wall and edge of tree pit. TPR
   
11/01/18 
ALAN OWINGS / ROBERT HENRY
AH1900133 / CONSTRUCTION
After Hours Permit for 11 / 12 / 2018, to perform construction work with the below activities: Interior Operations: 7AM-7PM Exterior Operations: 9AM-7PM
1000 5TH ST SE   
10/31/18 
UNITED STATES OF AMERICA / JOY WILDER
B1901427 / CONSTRUCTION
Non Construction permit to change load for current Child Development Center with 26 children 3 to 6 years old +3 Staff to Child Development Center with 30 Children + 3 Staff.
2 I ST SE   
10/17/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1900080 / CONSTRUCTION
WR #3573836 - M.ALLEN / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" STREET ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL AND SPLICE CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY-FRIDAYS) FROM 9PM TIL 7AM - PEPCO CREWS WILL ALSO BE WORKING SATURDAY AND SUNDAYS FROM 6AM TIL 6PM - WORK IS ONGOING
   
11/05/18 
CRESCENT CAPITAL VIEW / CASSANDRA MOSLEY
AH1900160 / CONSTRUCTION
Installation of wet utility services to the new building at 4 I Street SE including fire service, domestic service, and storm sewer.
10 I ST SE   
10/24/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900026 / CONSTRUCTION
Relocating existing freestanding sign
110 I ST SE   
11/06/18 
null
E1901238 / SUPPLEMENTAL
200 I ST SE 20009   
10/25/18 
DISTRICT OF COLUMBIA / null
M1900267 / SUPPLEMENTAL
200 I ST SE   
11/05/18 
GOVERNMENT OF THE DISTRICT OF COLUMBIA / null
E1901223 / SUPPLEMENTAL
   
10/25/18 
DISTRICT OF COLUMBIA / CLIFFORD DIXON
B1809410 / CONSTRUCTION
DGS OCTO BUILDING...NEW GENERATOR ON THE ROOF WITH ASSOCIATED MECHANICAL
   
11/07/18 
DISTRICT OF COLUMBIA / DANIEL MCGUIRE
P1901098 / SUPPLEMENTAL
300 M ST SE 8TH FL   
10/24/18 
FEDERAL CENTER LP / ALFRED JORDAN 2024375067
E1900838 / SUPPLEMENTAL
300 M ST SE 8TH FLOOR 20003   
10/22/18 
JBG SMITH - MORGAN JOHNSON-MASSEY / null
E1900736 / SUPPLEMENTAL
130 M ST SE   
11/09/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / RICHARD PLUMLEY
P1901176 / SUPPLEMENTAL
250 M ST SE   
11/07/18 
WCSMITH - BRIAN STROTT / GEORGE ARTHUR KING
SB1900025 / CONSTRUCTION
Drill and construct two 2 inch diameter observation wells 42 feet below existing grade utilizing mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulation.
400 M ST SE   
10/18/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1900650 / SUPPLEMENTAL
   
11/02/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1901156 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
10/31/18 
CONSOLIDATED RAIL CORPORATION / BRANDON KNAPP
AH1900131 / CONSTRUCTION
Work in the public ROW with the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, concrete structure, paving, and site restoration construction activities.
   
11/07/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1900023 / CONSTRUCTION
Per Work Plan, Geotechnical Investigation, dated October 18, 2018 (see attached), the work involves drilling 12 soil borings using a HSA rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 80 to 150 ft. Borings will be properly backfilled after completion.
1111 NEW JERSEY AVE SE   
10/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900581 / SUPPLEMENTAL
   
10/23/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL PISA; PISA
SG1800505 / CONSTRUCTION
Install 2 sets of wall mounted illuminated channel letters
   
10/25/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900860 / SUPPLEMENTAL
   
11/05/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL B. BELL
E1901199 / SUPPLEMENTAL
227 TINGEY ST SE   
10/17/18 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
AH1900079 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 10 / 22 through 11 / 3.
   
11/01/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900141 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 11 / 5 through 12 / 5.
300 TINGEY ST SE   
11/05/18 
FC BOILERMAKER LLC / DREW PEISHEL; JOHN RANOUS
B1813340 / CONSTRUCTION
Minor interior tenant improvment including building one non-load bearing partitiion wall adding millwork fixtures including cash desk, fitting rooms. No Structural work. Some electrical updates. **LEVEL 2 ALTERATION
   
11/08/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1901337 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.