Since January, 2003
            
 (a random before-and-after moment)
April 23, 2004
April 8, 2012
3rd Place at I, Looking West-Southwest (see more)

The Washington Post's Tim Carman is reporting today that the owners of DGS Delicatessen are planning to open Whaley's, a "small raw bar and restaurant" in the final ground-floor space of the Lumber Shed at the Yards, facing the Anacostia River between Osteria Morini and Agua 301.
It will have a 40-seat dining room and a 20-seat bar, and "will offer shellfish towers, crudos and seafood dishes," but won't focus exclusively on Mid-Atlantic seafood--but "will serve only sustainable seafood, wherever it may be found."
The timeline sounds surprisingly fast--"this spring"--and there's already a placeholder web site at whaleysdc.com.
This is not the first seafood raw bar attempted in this space--it was announced in the summer of 2014 that the Navy Yard Oyster Company would be opening there, but by July 2015 that venture fell by the wayside.
In the WaPo article, Whaley's owner Nick Wiseman speaks of Crisfield's in Silver Spring and its "personal neighborhood feel" as a model for Whaley's--but also is "not naive" about the "seasonal nature" of the Capitol Riverfront neighborhood:
"'It's a place that, in the summer, it's booming, and we have to be special enough that people want to come in the winter,' he says. 'We're trying to design a restaurant that can do that.'"
And, just as I hit the button to post this, I received the press release from Forest City confirming the lease. It adds that the name "honors the Revolutionary War hero Zedechiah Whaley, commander of the tiny Maryland Navy. History holds that Commander Whaley was a casualty during a storied Chesapeake Bay battle while single-handedly confronting a small squadron of British ships in an effort to protect the local watermen."
The Forest City press release also has these details on other Yards projects, for those itching to know:
* Arris is to "welcome its first residents in early March";
* Philz Coffee is still planning to open in Arris's northwest corner, on Tingey, "this spring";
* The Yards Park marina is also scheduled to open in spring 2016;
* The Showplace Icon movie theater construction is expected to start "later this year with completion anticipated for 2018."
* District Winery construction is expected to start this year, with opening expected in late 2017.
* The combo 191-unit Forest City apt bldg/138-unit PN Hoffman condo bldg at 4th and Tingey on "Parcel O" to start in 2016 as well, but doesn't say when.
Comments (7)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

MJM says: (2/10/16 12:55 PM)
Too bad "Fudgie the Whale" was already taken as a name.


JD says: (2/10/16 12:57 PM)
When I saw the graphic design of the Whaley's web site, I admit I immediately thought of a different whale:

link




conngs0 says: (2/10/16 1:18 PM)
Awesome news. I was disappointed that the Navy Yard Oyster Company didn't work out. I think there's a niche to be filled by a place like this, and I think it can certainly succeed during the "offseason".


MJM says: (2/10/16 1:57 PM)
Good find, the Twitter Whale Fail looks a little closer to the logo
Maybe still time to change the name to "20,000 Oysters from the Anacostia"


MarkinDC says: (2/10/16 2:27 PM)
Unrelated to this article, but I just have to ask: does anyone know what is going on with the empty space next to Takorean? It seems so odd that such a highly visible location has yet to snag a tenant after all this time.


JD says: (2/10/16 2:37 PM)
@Markin--I know at one point there was talk about it becoming a leasing office for all the nearby Yards apt buildings, but I don't know if that's still the case.



JES says: (2/10/16 4:27 PM)
Isn't there some restriction on that space that it can't have a kitchen because of lack of venting? Or something? If you throw out the whole "food service" category, your types of retail are pretty limited.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

JD on Peet's Grand Opening: Yes, @202, one of those would be a good idea. I should know the answer to thi...
202_cyclist on Peet's Grand Opening: Speaking of CSX, it looks like they made a mess this morning and spilled some su...
JD on Peet's Grand Opening: From the tunnel folks: "Work continues to progress on street restoration and la...
NavyYardGuy on Peet's Grand Opening: Ahhhh yes! "NO Foods" aka TSTSNBN
JD on Peet's Grand Opening: The Store That Should Not Be Named.
NavyYardGuy on Peet's Grand Opening: Okay I must have missed the memo -- TSTSNBN means ?
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 08/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.