Last week DDOT released its Southeast Blvd. Feasibility Study, in which the agency "evaluated the feasibility of transitioning a segment of the former Southeast Freeway from 11th Street to Barney Circle into an urban boulevard more consistent with the expected travel demand and the character of the adjacent neighborhood."
This study was a follow-on to the Office of Planning's Southeast Blvd. Planning Study, which came about after residents expressed displeasure with the initial efforts seen in the Barney Circle-Southeast Blvd. Transportation Planning Study.
And what does the feasibility study say? DDOT's report determines that changing the current Southeast Blvd. from the limited-access quick route between 11th Street SE and Barney Circle to a street with connections to its north and south and development along the footprint is feasible, but the transformation "would be neither inexpensive nor quick."
The study then goes through the issues that make clear this would not be a snap-the-fingers-and-make-it-so proposition:
*Ownership: There are two small parcels within the study area owned by the National Park Service--and we know quickly either arranging for a change in ownership or "coordinating" with NPS can go. The study refers to it as being clear "that there would be significant process requirements and challenges to disposing the NPS and incorporating them into private development." That the process to "surplus" any excess land along the footprint not needed for the road(s) itself is governed by the Federal Highway Administration would also not point to a lightning-quick resolution.
* Transit Garages: The inclusion of some location that would allow for the parking of tour buses, transit buses and streetcars {cough}--a big part of DDOT's wishes for the area but something that residents are not particularly keen on--"could be provided at Southeast Boulevard that takes advantage of the location and topography of the site to minimize visual impacts to surrounding neighborhoods and so that vehicles accessing the facility would not use residential neighborhood streets."
* Cost: The study's "cursory assessment" says that constructing the transportation elements of the project would cost around $120 million, with a transit garage adding about $65-70 million in costs (in 2015 dollars). This includes reconfiguring Barney Circle into an at-grade signalized traffic circle, raising Southeast Boulevard to the same level as L Street, and constructing a four-lane street that includes sidewalks, bike facilities, and traffic signals. Plus some contingency costs built in.
* Schedule: The graphic at right breaks out a not-short ballpark timeline of 10 years for both the "transportation" portion of the project and the land redevelopment project.
With all of that, DDOT says that the first step forward is to restart the Barney Circle and Southeast Blvd. Transportation Planning Study begun in 2013, though even that now has a road block, that this Environmental Assessment now can't be completed "until a financial plan for project implementation is identified and included in the regional Constrained Long-Range Transportation Plan (CLRP)." DDOT advises interested groups "to continue discussions with a broad spectrum of stakeholders during the EA to confirm community support for the project, engage with AWI Signatories, and evaluate project costs and funding options."
This final draft was presented to ANC 6B's Transportation Committee on Jan. 6, and Capitol Hill Corner reports that DDOT's representative told the committee that there were no "fatal flaws" in any of the Office of Planning's three concepts for reimagining the road--but that it will be "up to ANC 6B to push the project forward" by requesting the environmental assessment.
I am skimming it all, so if this project is of interest to you, be sure to read the feasibility report, and perhaps attend ANC 6B's meeting on Jan. 12, at which a draft letter will apparently be considered to support going ahead with the EA.
You can also wander through my posts on the subject from the past few years, especially on the completion of the OP study back in July and the three general concepts advanced for how to remake this stretch of land that currently serves as such a barrier between Capitol Hill/Hill East and the Anacostia River.
Comments (7)
   
 
 More About Traffic Issues

JDLand.com Home

Comments

dude says: (1/11/16 7:42 AM)
Seems like an awful lot of money for what it achieves.


jdc says: (1/11/16 8:32 AM)
To me this is sort of a 'no brainer' in terms of spreading around - and linking to - the massive redevelopment going on in near SE. From the city's perspective, more development = more taxes.


202_cyclist says: (1/11/16 8:56 AM)
@jdc:

Exactly right-- someone posted a comment on the Capitol Hill Corner blog estimating the expected future tax revenue of creating an entirely new neighborhood: link

Additionally, there are other benefits, such as linking neighborhoods and allowing more people to live in a walkable neighborhood and near transit, including the Potomac Ave station.


monkeyrotica says: (1/11/16 10:22 AM)
More roads = more congestion. Why does this "boulevard" even exist? Instead of spending $120 mil (which will eventually bloat to $200+ mil) just sell the land, build residential/retail, and re-open the north/south streets.


conngs0 says: (1/11/16 11:01 AM)
Agree with jdc. Doesn't the status quo risk maintaining a barrier between the planned development in Hill East by Stadium Armory and the 11th Street Bridge Park and the rest of the Navy Yard area? It sure seems like this would help maximize the returns on those other investments.


jdc says: (1/11/16 12:03 PM)
My fantasy - yes, I may need help - is that the explosive growth and interest in SE, then SW, and then 'eco district' they're building around L'Enfant, will lead to financial incentives sometime in my lifetime to tunneling and locating 695/SE-SE Freeway underground. Basically, selling air rights. It's about 5 miles as configured, and I wonder if that figure could be cut down if it took a more direct route. Yes, everyone will think of the "Big Dig" mess - but, a recent piece sort of exonerated the project and I bet in another 10-20 years it will be an accepted piece of US infrastructure. Plus, the lessons learned and the advancement in drilling will make this an easier project in all likelihood.


conngs0 says: (1/11/16 2:05 PM)
Even in the case of the Big Dig, I don't think it's the project itself that needs exoneration - it's the execution of the project. One of the reasons why the people of Boston were so against hosting the Olympics was that, based on the cost overruns and delays, they had zero faith that their local government could properly execute such a huge expenditure. After all, it's not that hosting an Olympics has to cripple the local economy; it's that hosting an Olympics typical cripples the local economy because the host country/city does such a poor job of planning the games.

I have a similar opinion of your fantasy regarding putting the SE Freeway underground. Would it benefit the neighborhood and the city (and commuters)? Could it be a worthwhile project? Absolutely. But you have to have faith in the execution.

An even better example of this phenomenon is the Metro 2040 plan. link This would undoubtedly be fantastic for the city. It'll never happen though because the people responsible for implementing such a plan will certainly mess it up!

Let's see how the Capitol Crossing project pans out. If that winds up being a success, perhaps there will be more support for significant infrastructure improvement along the lines you have in mind.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

RDC on Condos Confirmed: Got it, thanks JD
CJBabyDaddy on Condos Confirmed: @RMP: The Twelve12 at 1212 4th Street just tapped me on the shoulder and said, “...
JD on Condos Confirmed: They didn't sell them, at least not outright. Greystar Management is taking over...
RDC on Condos Confirmed: Maybe I missed this earlier, but apparently Bozzuto sold the Capitol Yards build...
RMP on Condos Confirmed: eNvy is certainly bad but I still think F1RST takes the cake for the worst. Why ...
jdc on Condos Confirmed: Our cyber navy will beat Russian's cyber navy.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/22/18
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/20/18
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 12/19/18

Recent Issued Building Permits Archive  
926 4TH ST SE   
01/16/19 
null / NA NA NA
EHOP19950290 / HOME OCCUPATION
1346 4TH ST SE   
01/11/19 
ALAN OWINGS / SEV HENRY
AH1900404 / CONSTRUCTION
After Hours Work on Saturday (1 / 12 / 2019) and Sunday (1 / 13 / 2019) for the Following Operations Saturday, 1 / 12 / 2019 ---Interior Operations after 7PM Sunday, 1 / 13 / 2019 ---Interior Operations: 7AM-7PM ---Exterior Operations: 7AM-7PM ---Sitework Operations: 7AM-7PM
900 5TH ST SE   
01/02/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MATT HUPPMAN
D1900229 / CONSTRUCTION
the Berg Corporation has a project located at 900 5th Street SE that has suffered a major fire and is considered an emergency job. Twenty percent of original structure was immediately demolished following the fire for safety reasons. The Berg Corporation is now pursuing a demolition permit to remove the balance of the stick built portion of the structure. The following improvements are to ...
1000 5TH ST SE 1ST FL   
01/09/19 
UNITED STATES OF AMERICA / WALTER T JONES
E1903161 / SUPPLEMENTAL
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
   
01/02/19 
UNITED STATES OF AMERICA / null
P1902543 / SUPPLEMENTAL
   
01/11/19 
UNITED STATES OF AMERICA / KASMIN HOLT
AH1900407 / CONSTRUCTION
Work under permit E1903161 on starting at 7pm - 7am.
1005 5TH ST SE   
01/04/19 
ALEXANDRA H HARRIS / HOLLIE MASON
F1800763 / CONSTRUCTION
Requesting permit to add an ornamental black iron fence with gate, not to exceed three feet, enclosing / surrounding front yard area. Installation of the fence may require concrete footings. The fence will be the same as others in the neighborhood and one of the approved transparent designs approved by the HOA; "hairpin" front section and "picket" return sections with ball finials on posts. Sol...
150 I ST SE   
12/24/18 
MILLSTONE CORPORATION / CHRISTINE LONG
B1903052 / CONSTRUCTION
To temp attached material hoist to side of building
328 I ST SE   
01/11/19 
BRIAN HUSEMAN / MELVIN CRENSHAW
B1904212 / CONSTRUCTION
Remove and replace kitchen on 2nd floor and update electrical. Remove and replace bathroom on 3rd floor and update electrical. Total SQFT 248
401 L ST SE   
01/15/19 
MICHAEL R BRICKMAN / SHELBY FIGAROORE
P1902908 / SUPPLEMENTAL
250 M ST SE   
01/07/19 
SQUARE 769 LLC / BRIAN STROTT
SH1900002 / CONSTRUCTION
Support of excavation system for a nine story 188,000 GSF office building with three levels below grade located at 250 M St. SE.
   
01/08/19 
SQUARE 769 LLC / ROBERT HART
AH1900389 / CONSTRUCTION
After hours work permit for installation of DDOT approved TCP jersey barriers.
1200 NEW JERSEY AVE SE 20590   
01/03/19 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1900891 / CONSTRUCTION
INTERIOR RENOVATION TO 7TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND NEW STRUCTURAL HANGING PARTITION. 7581 SQUARE FEET. US DOT **LEVEL 2 ALTERATION
71 POTOMAC AVE SE   
01/08/19 
RIVERFRONT HOLDINGS II, LLC / MITCH A. PERMUY
E1902865 / SUPPLEMENTAL
   
01/10/19 
FORIDA ROCK PROPERTIES INC / DANIEL M. NARH
P1902751 / SUPPLEMENTAL
227 TINGEY ST SE   
12/26/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900354 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday 1 / 18 – 7pm-10pm, Saturday 1 / 19 – 7pm-10pm, and Sunday 1 / 20 – 10am-7pm.
355 WATER ST SE   
12/24/18 
UNITED STATES OF AMERICA / KAYLIE ROLIN
TN1900028 / CONSTRUCTION
(1) 30 x 70 ft tent (1) 7k watt gas generator
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.