I ended 2015 with a quick look back at the major development news of the neighborhood over the previous twelve months, so it would be fitting to not get too far into 2016 without a look ahead. But it is to be remembered of course that crystal ball gazing is inherently dicier, which is why I like writing posts that look back a whole lot more than I do ones that look forward. First Out of the Gate Let's start with the easy ones, the 436-unit Park Chelsea at 880 New Jersey and the 325-unit Arris at 4th and Tingey, both of which are showing signs of opening their doors in coming weeks. In fact, let's look at photographic evidence from this weekend to support this theory, starting with the Park Chelsea's still-fenced-but-prepped front entrance and New Jersey Avenue frontage, plus the new section of I Street that at this point I believe is being kept closed merely for the fun of driving me insane. At Arris, the sidewalks on Tingey and Water, on the building's north and south sides, are now open, and landscaping and lighting has arrived in the courtyards on the building's west side--along with most interesting sculptures/screens/whatever you want to call them that serve to give the courtyards and the units that face them a little bit of privacy. Other Expected 2016 Deliveries The JDLand crystal ball feels confident that the DC Housing Authority's two current projects, the Community Center at 5th and K and the 195-unit mixed-income Bixby/Lofts at Capitol Quarter at 7th and L will be the next developments to make it across the finish line, though the specific time frames are still a bit cloudy.  And work is now underway on the Yards Park Marina, which is supposed to be finished in spring/summer 2016. Beyond that? The 305-unit Dock 79 at Florida Rock topped out in early November, and the exterior masonry and glass work are well underway. MRP Realty has said that it expects the building to deliver in July, but at the very least Signs Point to Yes on a delivery before the end of the year. While 82 I/801 New Jersey looks about finished with vertical construction, and its red brick exterior is already up to its third floor, and a 2016 delivery had been announced last year, this one should probably be filed under We Shall See. Otherwise, the rest of the current lineup of skeletons and holes in the ground are probably coming to you in 2017. But there's at least 30,000 combined square feet of additional retail space in both Arris and Dock 79 that I imagine we'll be hearing about as the year goes on. Projects That May Get Underway in 2016 (This category always gives me the shakes.) Also looking likely to join the 2016 lineup is the new National Association of Broadcasters headquarters at the corner of South Capitol and M, presumably along with the 163-unit residential building that development Monument Realty is also planning for the site. Movement on a new Douglass Bridge might also be on the boards for 2016, but whether actual start of construction can happen within the next 12 months, well, hope springs eternal. As always, if this slew of words has you overwhelmed, check out the full development map and the guide down below it (yes, scroll down!) to give more clarity.
JDLand.com Home
202_cyclist says: (1/5/16 12:33 PM)
While we're at it, any predictions on the Nats for 2016?
Sally M says: (1/5/16 3:21 PM)
Really wish the Park Chelsea sidewalks would open, especially on NJ Ave, where the covered walkway that's currently the only option is cramped and often in the thick of the building construction.
MarkinDC says: (1/5/16 3:42 PM)
Can anyone explain why 801 NJ seems to be sitting so far into the street? There's almost no offset and it looks incredibly odd jutting out into NJ Ave when compared to the footprint of everything around it. It's almost as annoying to look at as the perfectly finished Eye St that still isn't open for use.
JD says: (1/5/16 3:44 PM)
Why do you people insist on asking questions for posts I already have written but haven't put up yet? :-)
IOW, coming soon.
JES says: (1/5/16 4:35 PM)
It's total crap that the people on the side of the street that have the most room (i.e., Park Chelsea and Agora) don't have to have their sidewalks accessible. If they did, we wouldn't have to be shoehorned into that 5-foot wide cattle chute.
keith18 says: (1/5/16 6:44 PM)
I will echo the posts above. The covered walkway in insufficiently wide and dangerous in at least two ways: One, construction trucks go in and out of the site constantly in a break in the walkway and two, the street is barely wide enough for two cars to pass in opposite directions (especially with large construction vehicles going in and out). It boggles my mind the ample space on the other side of the street has not been utilized.
dude says: (1/5/16 10:48 PM)
202_cyclist: Always Injured Nats will end up about the same as 2015. Stay Healthy Nats can get back to their 2014 form and maybe more. We'll see which we get.
Blue says: (1/6/16 12:13 AM)
Will someone please set the record straight and tell me how to pronounce Tingey? I always just mumble when I have to say it.
JD says: (1/6/16 8:30 AM)
With absolutely no authority, I say TinJey.
I also say Jif for .gif.
It might be my preference for the J sound. :-)
JD says: (1/6/16 8:33 AM)
And, believe it or not, there is actually a ruling:
link
It comes from a big project to determine the correct pronunciation of all Supreme Court cases, which included Tingey v. Baas.
link
And they brought in heavy-hitter Bryan Garner, so I'm taking their ruling as law.
It's tin-jee.
NewGuy says: (1/6/16 11:13 AM)
1244 South Capitol also going up in 2016. Not to nit-pick. :)
NewGuy says: (1/6/16 11:15 AM)
Unless of course you're including that in projects already underway that won't deliver until 2017. Which you probably are. So just ignore me. :)
JD says: (1/6/16 11:18 AM)
I won't ignore you, but you were right the second time. :-)
JD says: (1/6/16 3:57 PM)
Hey, look, someone's trying to get historic status for a smokestack!
link
(a chuckle for very longtime JDLand readers)
FromTheTurret says: (1/7/16 9:46 AM)
I street is paved, lines are painted and Park Chelsea appears to be done doing work that would interfere with the use of the road. Any predictions on the opening of I street?
JD says: (1/7/16 9:51 AM)
As I've said elsewhere (I think), my sense is at this point they are either waiting on a final signoff from DDOT, or just delaying a bit more until the building itself opens.
Or, as I said above, just keeping it closed because they know it's making me crazy.
JHUGrad says: (1/7/16 10:21 AM)
Any word on when the Showplace Icon project gets underway?
JD says: (1/7/16 10:23 AM)
Chances are if I knew, I would have said so in the post. :-)
nairobs says: (1/7/16 11:22 AM)
Is the winery still on tap for a start in 2016?
JD says: (1/7/16 11:25 AM)
There's not enough information to be sure. They say so, but they still have to go through zoning approvals, building permits, etc. etc. It's certainly possible, but I didn't feel confident enough to mention it.
JHUGrad says: (1/8/16 9:21 AM)
Looks like new development is coming up for Buzzard Point... link
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|