Since January, 2003
            
 (a random before-and-after moment)
November 2004
June 16, 2018
4th at L, Looking Northwest (see more)

I've received word that work is about to get started on 1244 South Capitol, a 290-unit residential building on the northeast corner of South Capitol and N Streets. This is the site where Hill Country operated a game-day pop-up barbecue stand this summer, and many moons ago it was a BP/Amoco station. The land was originally purchased by Monument Realty during the 2005-06 Gold Rush era, then was bought by JBG in 2013.
It's expected to take about two years to complete, and when done it will be the first new building on the east side of South Capitol Street since Nats Park opened more than seven years ago. It will have 26,000 square feet of retail on two stories, giving the corner immediately north of Nats Parking Garage B the sort of "activation" that has been expected ever since it was announced the stadium was coming to South Capitol Street.
For those of you scoring at home, let's go through the lineup of projects currently under construction in the neighborhood east of South Capitol and south of the freeway. Not merely in the pipeline, actually under construction:
* Park Chelsea, 430 rental units, expected delivery early 2016;
* Arris, 326 rental units, expected delivery early 2016;
* Dock 79, 305 rental units, expected delivery summer 2016;
* Lofts at Capitol Quarter, 195 mixed-income rental units, expected delivery 2016;
* Gallery at Capitol Riverfront (1111 New Jersey), 324 rental units, expected delivery 2016;
* 801 New Jersey, 227 rental units, expected delivery late 2016;
* 800 New Jersey/Whole Foods, 336 rental units, expected delivery 2017;
* 909 Half Street, 380 rental units, expected delivery late 2016/early 2017;
* F1rst. 325 rental units, expected delivery 2017;
* Hampton Inn and Suites, 168 rooms, expected delivery Any Minute Now;
* Homewood Suites, 195 rooms, expected delivery late 2016/early 2017;
* Residence Inn, 170 rooms, expected delivery 2017;
* 99 M, 224,000-square-foot office building, expected delivery 2017;
* Capper Community Center, expected delivery early 2016.
If you don't feel like doing the math, that's more than 2,900 rental units being built right now, as well as about 530 hotel rooms.
No wonder I'm so tired.
Comments (7)
   
 
 More About Development News
 All posts: 1221 Van, Development News

JDLand.com Home

Comments

dude says: (11/11/15 8:27 AM)
That's a lot of people who are going to be sad there's no McDonalds...


S.B. says: (11/11/15 3:06 PM)
don't worry, there will be plenty of other chain restaurants to keep them busy like Buffalo Wild wings. When did this area become Arlington by the way?


JHUGrad says: (11/11/15 4:34 PM)
S.B., I disagree. I think the Capitol Riverfront (when finally filled in with everything in 2020), will be a unique destination in the DMV. Baseball Stadium, Soccer Stadium, unique movie theater, and riverfront access. It won't be like anything is in the entire DMV.


willinrm says: (11/12/15 8:35 AM)
Thanks for this piece, it must of taken some time but is much appreciated seeing all of the projects in chronological order!


JES says: (11/12/15 11:25 AM)
S.B., what did you expect? There are a LOT of retail bays coming online in the neighborhood, not everything can be a Bluejacket or a Morini. Chains were always going to move in, especially adjacent to the ballpark itself. It was only a matter of time, but thankfully we still have plenty of good local options, so if you want to avoid patronizing megachains, you're always going to have plenty of options.


Jaybird says: (11/12/15 11:40 AM)
JHUGrad,

You make a good point. Northern Virginia really, really wanted the Expos and at times, were the favorites. But their location candidates seemed to be either too far from the core of the DMV or as in the case of Arlington, NIMBY.

And yet, Cap Riv will have two sports venue and it isn't a shoe-horn job.

As far as chains, I think we sometimes unfairly malign them. Panera, Chipotle and Noodles and Company are great options for eating.










bryan says: (11/16/15 4:11 PM)
1111 New Jersey is moving at a snail's pace. I'd guess that delivers in 2017.

But pretty amazing all of these projects are set to be done before the 2018 all star game at Nats Park.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Catching Up With: @AllIsNotWells -- that is what I thought. Thank you for confirming.
202_cyclist on Catching Up With: @AllIsNotWells -- that is what I thought. Thank you for confirming.
AllIsNotWells on Catching Up With: @202 New member orientation for the 116th congress.
202_cyclist on Catching Up With: Folks— what big event is happening at the Courtyard Marriott this week?
CJBabyDaddy on Catching Up With: @spiritequality: Rhymes with “groovy tea waiter” and “newbie fee hater?”
JNB on Catching Up With: HQ2 to Crystal City. Just announced.
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/13/18
150 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/18
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/09/18
700 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 11/09/18
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/08/18
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/07/18
800 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/30/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/18
50 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
100 B/O O ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
1400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/26/18
100 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 10/23/18
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/23/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/22/18
900 B/O 5TH ST SE   HOMICIDE
Murder I
 10/20/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/19/18
400 B/O M ST SE   THEFT
Shoplifting
 10/17/18
100 B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/17/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/23/18 
null / ANDY MCKELVEY
SP1800044 / CONSTRUCTION
Construct outdoor swimming pool on 10th floor roof of new building
1013 4TH ST SE   
11/05/18 
EVA WALTER / KYLE YOST
SOL1900066 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
11/07/18 
EVA WALTER / null
E1901297 / SUPPLEMENTAL
1346 4TH ST SE   
10/18/18 
FC 1346, LLC / DFM DEVELOPMENT SERVICES, LLC
B1809670 / CONSTRUCTION
Parcel O-2 at the Yards. Revision to Permit B1610576 for installation of flood wall on 5th Street, SE, the reduction of roadway width, and widening of sidewalk to provide adequate pedestrian clear space between flood wall and edge of tree pit. TPR
   
11/01/18 
ALAN OWINGS / ROBERT HENRY
AH1900133 / CONSTRUCTION
After Hours Permit for 11 / 12 / 2018, to perform construction work with the below activities: Interior Operations: 7AM-7PM Exterior Operations: 9AM-7PM
1000 5TH ST SE   
10/31/18 
UNITED STATES OF AMERICA / JOY WILDER
B1901427 / CONSTRUCTION
Non Construction permit to change load for current Child Development Center with 26 children 3 to 6 years old +3 Staff to Child Development Center with 30 Children + 3 Staff.
2 I ST SE   
11/05/18 
CRESCENT CAPITAL VIEW / CASSANDRA MOSLEY
AH1900160 / CONSTRUCTION
Installation of wet utility services to the new building at 4 I Street SE including fire service, domestic service, and storm sewer.
10 I ST SE   
10/24/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900026 / CONSTRUCTION
Relocating existing freestanding sign
110 I ST SE   
11/06/18 
null
E1901238 / SUPPLEMENTAL
200 I ST SE 20009   
10/25/18 
DISTRICT OF COLUMBIA / null
M1900267 / SUPPLEMENTAL
200 I ST SE   
11/05/18 
GOVERNMENT OF THE DISTRICT OF COLUMBIA / null
E1901223 / SUPPLEMENTAL
   
10/25/18 
DISTRICT OF COLUMBIA / CLIFFORD DIXON
B1809410 / CONSTRUCTION
DGS OCTO BUILDING...NEW GENERATOR ON THE ROOF WITH ASSOCIATED MECHANICAL
   
11/07/18 
DISTRICT OF COLUMBIA / DANIEL MCGUIRE
P1901098 / SUPPLEMENTAL
300 M ST SE 8TH FL   
10/24/18 
FEDERAL CENTER LP / ALFRED JORDAN 2024375067
E1900838 / SUPPLEMENTAL
300 M ST SE 8TH FLOOR 20003   
10/22/18 
JBG SMITH - MORGAN JOHNSON-MASSEY / null
E1900736 / SUPPLEMENTAL
130 M ST SE   
11/09/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / RICHARD PLUMLEY
P1901176 / SUPPLEMENTAL
250 M ST SE   
11/07/18 
WCSMITH - BRIAN STROTT / GEORGE ARTHUR KING
SB1900025 / CONSTRUCTION
Drill and construct two 2 inch diameter observation wells 42 feet below existing grade utilizing mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulation.
400 M ST SE   
10/18/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1900650 / SUPPLEMENTAL
   
11/02/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1901156 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
10/31/18 
CONSOLIDATED RAIL CORPORATION / BRANDON KNAPP
AH1900131 / CONSTRUCTION
Work in the public ROW with the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, concrete structure, paving, and site restoration construction activities.
   
11/07/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1900023 / CONSTRUCTION
Per Work Plan, Geotechnical Investigation, dated October 18, 2018 (see attached), the work involves drilling 12 soil borings using a HSA rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 80 to 150 ft. Borings will be properly backfilled after completion.
1111 NEW JERSEY AVE SE   
10/23/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL PISA; PISA
SG1800505 / CONSTRUCTION
Install 2 sets of wall mounted illuminated channel letters
   
10/25/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900860 / SUPPLEMENTAL
   
11/05/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL B. BELL
E1901199 / SUPPLEMENTAL
227 TINGEY ST SE   
11/01/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900141 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 11 / 5 through 12 / 5.
300 TINGEY ST SE   
11/05/18 
FC BOILERMAKER LLC / DREW PEISHEL; JOHN RANOUS
B1813340 / CONSTRUCTION
Minor interior tenant improvment including building one non-load bearing partitiion wall adding millwork fixtures including cash desk, fitting rooms. No Structural work. Some electrical updates. **LEVEL 2 ALTERATION
   
11/08/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1901337 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.