Since January, 2003
            
 (a random before-and-after moment)
July 17, 2008
June 16, 2018 
3rd at River St., Looking West-Southwest (see more)

This week I've looked at the buildings that are far along in their construction, and I've looked at the newest topped-off project, and I've even mentioned the project that is just about to start digging, so what's left? A mere seven projects that are in their vertical construction phase, at various levels of out-of-the-ground.
We'll start with 801 New Jersey/82 I (above/left), now a smidge more than halfway toward its eventual 13-story height. This is the Graystar/RCP 227-unit apartment building that is expected to open in 2016.
Just up the block is 800 New Jersey, aka the Whole Foods building, which looks just barely out of the ground from New Jersey (below left), but if you venture up 2nd Street (below right) you can see evidence of the ramp for the grocery store parking that will be on the second and third floor. (Resident parking will be below ground, shared with its sibling the Park Chelsea and the eventual third residential building along the east side of the block.) This building will have about 336 rental units:

Two projects have at least some hint of their first floors built: the 380-unit building at 909 Half Street will be a lot larger than this small section of construction at Half and I makes it look like at the moment (below left), while the Homewood Suites at Half and M really does also have a portion of its first floor built, though the nasty late fall shadows make it hard to see.
Next up are three projects that are technically out of the ground, although it's just rebar breaking the plane at the moment, but concrete shouldn't be far behind. Behold terribly unexciting pictures of the status of the F1rst residential project and the Residence Inn immediately to its north, plus the Gallery at Capitol Riverfront/1111 New Jersey.
But if you like photos of holes being dug, you're still in luck. There's now clear evidence of the excavation work at Skanska's 99 M office building project, and while nothing will ever really arise from the cut-and-cover work on the new portion of the Virginia Avenue Tunnel (seen here looking west from 5th Street) it's still digging.
In the midst of all of these updates over the past few days, I did some redevelopment of my own, and finally created individual pages for the Square 701/Not-Ballpark-Square trio of projects, so now you can check out the progress on the Hampton Inn, F1rst/Residence Inn, and 99 M in a less jumbled format.
Comments (12)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (11/12/15 1:38 PM)
I am impressed with the progress of 82 I Street. It seems like they are completing at least one floor per week.

In other news, something needs to be done about the gun-play in DC. We had our windows open yesterday afternoon to enjoy the nice weather and there was another shooting just on the other side of South Capitol Street, almost directly next to the police station. If crime continues to increase, it will be interesting to see if as many people will move back cities throughout the US.


dude says: (11/12/15 10:50 PM)
I'll be honest that I'm not terribly excited by pictures of dirt and holes, I thought I should at least post some comment because this post is full of info. So there.

As for crime and guns and shootings and killings, just remember these wise words: you can be killed any day in any fashion.


conngs0 says: (11/13/15 9:13 AM)
You really threw some sunshine down on that one, dude! Indeed, the pictures of dirt and holes aren't all that exciting on their own, but I find the progress that they represent is quite exciting. The time that lapses from conceptualization of a project to visible progress can be pretty significant. Of course, I'm always amazed by how long it takes to dig those holes before a structure starts to come out of them, but the whole experience is just an exercise in patience I suppose.

And yeah, amidst all this development progress and prosperity (for many), we do get reminders that we still live in a big city. Right now seems to be an especially scary time (at least compared to the last few years). There are too many facets to the recent uptick in crime to address in a post. I'd just agree with 202 and dude inasmuch as the trend bears scrutiny, but it's important not to panic or overreact. In the meantime our responsibility to continue to get to know our neighbors, develop relationships with the police and stay on top of any negative trends.


202_cyclist says: (11/13/15 10:12 AM)
dude-- the holes in the ground and LIVE CRANE ACTION 2015!!!!! is one of the best parts of this blog.


JD says: (11/13/15 10:50 AM)
See? I have readers with a very wide range of interests that I try to accommodate!


JHUGrad says: (11/13/15 11:48 AM)
Well said, conngs0. I feel pretty fortunate to own property in the Capitol Riverfront. I think in 5 - 10 years, this will be one of the more dynamic places to live in DC. One way to keep crime down is for people living in the area to get to know one another and voice concerns to their ANC representatives, who can then voice these concerns to the police and councilmembers.


JD says: (11/13/15 5:36 PM)
I can't remember whether this has been mentioned anywhere (here or otherwise), but the city has begun eminent-domain-ing some property along South Capitol Street near Potomac Avenue and the river for the right-of-way for the new Douglass Bridge and the big traffic circle.



dude says: (11/13/15 7:27 PM)
Oh, I just want to make it clear that JDLand is my favorite blog on the Internet. To me the dirt and holes are the least exciting part is all.

As for cranes, how do they get that big weight to the top? Anyone ever seen that in action?


202_cyclist says: (11/13/15 7:34 PM)
Hey dude-- they use another crane, called a crawler, to assemble it.


Alan says: (11/14/15 11:21 AM)
And the crawler is often assembled by a smaller crane. So in order to build a crane you need a small crane to build the crawler crane to build the big crane. It's bananas.


JD says: (11/14/15 3:36 PM)
After hours permit alert for the F1rst site (1277 1st St):

AH1600122 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE FROM 5AM TO 9PM 11 / 13 / 2015 TO 12 / 13 / 2015


JD says: (11/17/15 3:13 PM)
WC Smith @WCSmithDC
Hi @MarkEMalone! Right now we're looking at move-ins starting in February. Head to parkchelseadc.com to sign up for updates.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

jdc on June Construction Update: You can't tell it from the photos but the Parc Riverside Phase 2 is sort of awkw...
RMP on June Construction Update: Great pics, JD! Does anyone know what is under construction in the space between...
walt on June Construction Update: This morning I drove up 8th from L and about 15 CSX workers were standing around...
Ampersand on June Construction Update: Sometime between yesterday morning and this morning the CSX team moved the 4th S...
willinrm on June Construction Update: Man, montaditos is going to be missed, that was a great happy hour Wednesday spo...
nsfw on June Construction Update: @stacycloyd Now I can move to the neighborhood.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18

Recent Issued Building Permits Archive  
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
800 NEW JERSEY AVE SE   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.