Since January, 2003
            
 Page Through from Before to After

While the appearance of a canopy over a front entrance does not signal that an under-construction apartment building is ready to start welcoming residents next week, it's still an interesting progress point to see at both the Park Chelsea and Arris residential projects. There's also landscaping starting to go in along the Park Chelsea's sidewalks on both New Jersey and would-you-just-open-already I Street--plus the leasing countdown clock has remained set for January 2016 for a few months now. As for Arris, the latest word remains "early 2016" for when it will open--and 2016 just isn't as far away as it used to be.
To the east, the not-minor project to do the masonry work and the siding at the 195-unit mixed-income Lofts at Capitol Quarter at 7th Street continues--apologies for only showing the rear of the building when I take a wide shot, but with the trees and the narrowness of L Street it's basically impossible for me to get a good photograph of the front. (Plus the low sun angle from late October through early March makes southern-facing photos a pretty miserable experience with a pretty miserable outcome, anyway.)
At 5th and K, the Capper Community Center's exterior isn't changing too much at this stage, but I'd get the shakes if I tried to not photograph it.
At New Jersey and Tingey, the new trapeze school building's blue-and-white exterior is mostly finished, though I'm such a bad blogger that it didn't occur to me to walk up to the big opening and peek in--but TSNYDC has posted a photo of the inside.
As for the Brig, the beer garden-to-be at 8th and L, the building itself looks pretty well finished now, though the "garden" portion of the venture does not appear to have gotten underway yet. And with two pit bulls on guard (!), I wasn't about to poke my camera through the fence for a better view.
And while I had designs on pressing my camera up against the glass at Buffalo Wild Wings on Half Street, they were having a staff training session when I arrived, and so I chickened out (Bad Blogger Data Point #2). But the gentleman I spoke with there confirmed again the Nov. 16 opening date, saying that the doors will open that day at 10 am--and that they generally have people camping out over Sunday nights to be among the first 100 customers through the door, who are then winners of the free-wings-once-a-week-for-a-year prize. Hope y'all have warm sleeping bags!
Still to come, the skeletons-and-holes report.
Comments (10)
   
 
 More About Development News

JDLand.com Home

Comments

conngs0 says: (11/10/15 10:20 AM)
"chickened out". Nice.


crispy says: (11/10/15 10:22 AM)
It looks like Arris and Park Chelsea are going to open about the same time, which is going to bring a huge flux of people down to the Navy Yard area. I hope Metro is planning to add more trains to the morning rush hour!


JHUGrad says: (11/10/15 10:42 AM)
My prediction is that in 5 years, the Capitol Riverfront will be a mini downtown DC.


NavyYardGuy says: (11/10/15 11:02 AM)
@JHU Grad: Do we really want it to be a miniature version of dtwn DC? At times I feel the downtown area to be very generic--and Navy Yard starting to feel like V I R G I N I A..


JD says: (11/10/15 11:17 AM)
In other news, a first rendering for Lerner's 1000 South Capitol proposed residential building:

link

(It's a U-shaped building, with the courtyard facing east toward 1015 Half St.)



Daedam says: (11/10/15 11:20 AM)
Maybe residents in Park Chelsea will feel the crunch on the Green line and walk to Capitol South. Either way, the Green line is going to start feeling pretty cramped by 2018, especially on baseball and/or soccer days.


JD says: (11/10/15 11:33 AM)
The Park Chelsea (and then its sibling the Whole Foods building) will be by far the largest apartment buildings anywhere close to Capitol South. I wouldn't be surprised that a lot of people who decide to live there will already be Orange/Blue line commuters. (Or Hill rats.)


RMP says: (11/10/15 11:45 AM)
I contacted the Forest City leasing office to ask about Arris and all they said was that they added me to an "interest list" but gave zero information about when leasing actually begins.


JES says: (11/10/15 12:01 PM)
LOL. Metro adding trains. Now THAT is a good joke.


BethD says: (11/10/15 12:24 PM)
I live in Capitol Hill Tower and already prefer to walk up to Capitol South. More walking but removes an AM rush transfer at Gallery Place which is not a great way to start the day.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
conngs0 on Catching Up on: Brett M, I echo your disappointment on the structure of the new Capper Senior Ce...
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
100 M ST SE   
10/21/19 
SQUARE 743 INC / JOHN C. BLOCK; JOHN C. BLOCK
E2000895 / SUPPLEMENTAL
   
10/21/19 
SQUARE 743 INC / null
E2000932 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 420   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000949 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 4TH FL   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000951 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
10/21/19 
SQUARE 742 LLC / STEPHEN TAYLOR; NA TBD
B2000682 / CONSTRUCTION
Revision to existing issued permit #B1913851: Furniture layout revision, mailboxes changed location. Electrical outlets relocated per furniture changes.
   
10/22/19 
SQUARE 742 LLC / ;
P2000628 / SUPPLEMENTAL
   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.