This is mainly an excuse for me to post photos I got by schlepping up onto the Douglass Bridge on Sunday, but it's worth noting that it was announced last week that vertical construction is now finished on Dock 79, the 305-unit residential building that is the first phase of the never-thought-it-would-finally-happen redevelopment of the Florida Rock site along the Anacostia River. And so let's take a moment to look back to what the site looked like in 2005, and what it looks like now:
One other item of note at the site--as seen below, beams have been placed connecting a portion of the main concrete walkway at Diamond Teague Park to what will be Dock 79's plaza and Anacostia Riverwalk footprint, and without realizing it I did a pretty good job of matching my photo of the beams to the rendering of the same location:
There will be over 15,000 square feet of retail in the building, and in a press release from developer MRP Realty last week, John Begert is quoted as saying the retail space is being "programmed" with "a dynamic mix of local authentic restaurant operators," though no retail tenants have been announced as yet.
Most of this retail space will be facing the "esplanade" and this plaza, which MRP's press release says is "inspired by the concept of the “ecotone,” an ecological term referring to the transitional zone between two ecosystems."
The plaza also is directly south of the "grand staircase" of Nationals Park, ensuring that (some) views of the river from those steps and the viewing platform on the upper concourse are not completely lost.
The building is expected to deliver in the summer of 2016, and will have a ground-floor club/game room, a health club, a rooftop swimming pool, WiFi, air-conditioned storage, bike storage, a business lounge, and a 24-hour front desk.
The subsequent phases of the six-acre project are currently envisioned as a second residential building with 282 units and 5,600 square feet of retail, followed by a 313,000-square-foot office building with 11,500 square feet of retail, and then a fourth building that could be a hotel or another residential or office building, with 260,000 square feet of space and 12,600 square feet of ground-floor retail. (The footprint of the final two phases is, however, right up against the western end of the existing Douglass Bridge, so it might be awhile before those come to pass.)
See my Dock 79/Florida Rock page for lots more photos and renderings.
Comments (3)
   
 
 More About Florida Rock
 All posts: dock79, Florida Rock, riverwalk

JDLand.com Home

Comments

Jaybird says: (11/9/15 11:04 AM)
I'm anticipating arriving at a Nats game via the Alexandria ferry, sipping a pre-game beer at this place, then stepping inside the park, all with a certain ease not possible any other way, which is to say it avoids the crowds on the north side and is all close together.



Chaifetz10 says: (11/9/15 1:57 PM)
We went down to Sideyards this past weekend, and walking down New Jersey Ave from the Metro, we could see active construction equipment at what would be roughly New Jersey Ave and N St, on the south side. So far I haven't tracked anything down for this parcel... can anyone help me figure out what's being worked on here?


JD says: (11/9/15 1:58 PM)
That's DC Water doing infrastructure work as part of its huge Clean Rivers project.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

ColoradoCane on Slider-Palooza 2019: Does anyone know what the work going on at the intersection of NJ & I St. al...
CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.