Since January, 2003
            
 (a random before-and-after moment)
December 7, 2008
April 16, 2016
4th at Tingey, Looking West-Northwest (see more)

A Look Back, eight years ago today: The southwest corner of 1st and M Streets, SE, with Normandie Liquors long closed and in its final few months.
* SIDE YARDS: Back for a second year is "Side Yards," an "evening of quirky amusement and wonder" showcasing top sideshow performers at the Yards Park on Saturday, Nov. 7 from 6 to 10 pm. Contortionists, magicians, juggling, escape artists and snake handling will all be showcased (sounds like a typical day in Congress!). There will also be burlesque acts, live music, and a beer garden. Tickets are free, but available in advance.
* DC BEER FESTIVAL: Also on Saturday, Nov. 7 is the DC Beer Festival at Nats Park. Admission is $40 and includes unlimited tastings (wheeeee!).
* PERCEPTION SURVEY: It's time for the Capitol Riverfront BID's annual Perception Survey, so take a few moments to tell them your feelings about the neighborhood, whether you are a resident, office worker, or visitor.
* OKAY, HOW ABOUT DECEMBER: Back in September I posted about reservations being accepted for the new Hampton Inn at 1st and N starting November 19. It's now December 9.
* THE NEW VIRGINIA AVE. PARK: ANC 6B commissioner Kirsten Oldenburg looks at the ideas that came out of last month's public meeting to come up with a post-tunnel-construction design for Virginia Avenue Park.
* THE OLD VIRGINIA AVE. (NOT) PARK: And speaking of Virginia Avenue between 9th and 10th streets, SE, this week's Lost Capitol Hill series on The Hill is Home looks at the owner of a lumber yard in that spot during the mid-1800s.
* INSTAGRAM: I'll just mention again that JDLand is now on Instagram, if that's your social media landscape of choice.
* MOBILE: I've been tweaking the mobile version of the JDLand home page to add some of the items that have only been on the desktop page--a random Look Back photo, the Highlighted Projects development map, and even the Latest Tweets box. Visit on your phone to see what I mean.
Comments (11)
   
 
 More Recent News

JDLand.com Home

Comments

JC in DC says: (11/3/15 9:04 AM)
To add another Tuesday tidbit, in the block adjacent to the VA Ave park, I saw that 810 Potomac hits the auction block later today. Get your checkbook out...
link



JD says: (11/3/15 9:14 AM)
Ai-yi-yi, that building. (now without its turret!) In 2011 Madison Marquette partnered with owner ICP Properties on it, perhaps because they were thinking the Marines would end up eminent domain'ing that block for their new BEQ. With that now going to the existing annex site, and with Madison now no longer owning the Blue Castle, I wonder if they just decided to cut losses.

ICP bought them in 2006, and tried to sell in 2008 in as well.


Alan says: (11/3/15 11:35 AM)
Hope no one booked rooms at that Hampton Inn for Thanksgiving.


Ampersand says: (11/3/15 3:18 PM)
Not related to any of this, but does anyone know what the ground-shaking hammering was that woke me up at 7:45 this morning? Went on intermittently for about half an hour if I remember correctly, but I am pretty fuzzy before 8:30.


202_cyclist says: (11/3/15 3:50 PM)
Must be nice to wake up at 7:45 on a weekday....

I am more concerned about the 3 AM Saturday morning concrete pours that there have been at some of the lots recently.


Alan says: (11/3/15 3:56 PM)
@202_cyclist sadly they've had permits for those early AM pours; our building's been pretty good about letting us know a day or two ahead of time.


JD says: (11/4/15 2:06 PM)
My stringer has passed along a photo that shows workers in one of the retail bays along the Riverwalk (in the base of the overlook by the Lumber Shed)--maybe Nicoletta is at last getting going?


JD says: (11/4/15 2:07 PM)
(maybe "workers" isn't the right word--people with piles of paperwork standing around.)


JES says: (11/4/15 3:25 PM)
If they have permits for 3am concrete pours, that's not on them; it's on the city for granting them. Seriously, why do they keep allowing construction companies to do this in an area that's so residential? Can the ANC or the BID or someone start leaning on the city to stop that crap?


202_cyclist says: (11/4/15 4:41 PM)
@JES:

I agree that the fault likely is with the city employee who approved this. More broadly, I would prefer if the construction started an hour later in the mornings but continued to 6 PM instead of 5 PM.


conngs0 says: (11/5/15 9:57 AM)
Exciting news about Nicoletta! I'm always on the lookout for a good takeaway pizza place. The only good one I've found in DC is Vace up in Cleveland Park, which isn't exactly a viable option for folks living down in Navy Yard. Between that and the newly renovated Park Tavern, hopefully one winds up as a winner!

Construction timing is a tough subject with some conflicting priorities. Obviously 3am is ridiculous. However, I imagine that some of the timing has to do with getting construction vehicles and personnel out of the way for rush hour. Regardless, given the inevitable (but temporary) inconvenience associated with new construction, I'm generally in favor of whatever solution brings the projects to completion as quickly as possible.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

CJBabyDaddy on Catching Up With: @spiritequality: Rhymes with “groovy tea waiter” and “newbie fee hater?”
JNB on Catching Up With: HQ2 to Crystal City. Just announced.
spiritequality on Catching Up With: Any update on the project that rhymes with smoothly bee eater?
JD on Catching Up With: @202, they say they are "nearing the end." But I'm also guessing the sale of you...
VelocityChris on Catching Up With: Anyone heard any updates on the Hatoba ramen place that's going into the 100 Mon...
202_cyclist on Catching Up With: It looks like all of the CSX construction equipment has been cleared from the lo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/09/18
700 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 11/09/18
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/08/18
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/07/18
800 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/30/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/18
50 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
100 B/O O ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
1400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/26/18
100 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 10/23/18
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/23/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/22/18
900 B/O 5TH ST SE   HOMICIDE
Murder I
 10/20/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/19/18
400 B/O M ST SE   THEFT
Shoplifting
 10/17/18
100 B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/17/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/23/18 
null / ANDY MCKELVEY
SP1800044 / CONSTRUCTION
Construct outdoor swimming pool on 10th floor roof of new building
1013 4TH ST SE   
11/05/18 
EVA WALTER / KYLE YOST
SOL1900066 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
11/07/18 
EVA WALTER / null
E1901297 / SUPPLEMENTAL
1346 4TH ST SE   
10/18/18 
FC 1346, LLC / DFM DEVELOPMENT SERVICES, LLC
B1809670 / CONSTRUCTION
Parcel O-2 at the Yards. Revision to Permit B1610576 for installation of flood wall on 5th Street, SE, the reduction of roadway width, and widening of sidewalk to provide adequate pedestrian clear space between flood wall and edge of tree pit. TPR
   
11/01/18 
ALAN OWINGS / ROBERT HENRY
AH1900133 / CONSTRUCTION
After Hours Permit for 11 / 12 / 2018, to perform construction work with the below activities: Interior Operations: 7AM-7PM Exterior Operations: 9AM-7PM
1000 5TH ST SE   
10/31/18 
UNITED STATES OF AMERICA / JOY WILDER
B1901427 / CONSTRUCTION
Non Construction permit to change load for current Child Development Center with 26 children 3 to 6 years old +3 Staff to Child Development Center with 30 Children + 3 Staff.
2 I ST SE   
10/17/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1900080 / CONSTRUCTION
WR #3573836 - M.ALLEN / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" STREET ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL AND SPLICE CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY-FRIDAYS) FROM 9PM TIL 7AM - PEPCO CREWS WILL ALSO BE WORKING SATURDAY AND SUNDAYS FROM 6AM TIL 6PM - WORK IS ONGOING
   
11/05/18 
CRESCENT CAPITAL VIEW / CASSANDRA MOSLEY
AH1900160 / CONSTRUCTION
Installation of wet utility services to the new building at 4 I Street SE including fire service, domestic service, and storm sewer.
10 I ST SE   
10/24/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900026 / CONSTRUCTION
Relocating existing freestanding sign
110 I ST SE   
11/06/18 
null
E1901238 / SUPPLEMENTAL
200 I ST SE 20009   
10/25/18 
DISTRICT OF COLUMBIA / null
M1900267 / SUPPLEMENTAL
200 I ST SE   
11/05/18 
GOVERNMENT OF THE DISTRICT OF COLUMBIA / null
E1901223 / SUPPLEMENTAL
   
10/25/18 
DISTRICT OF COLUMBIA / CLIFFORD DIXON
B1809410 / CONSTRUCTION
DGS OCTO BUILDING...NEW GENERATOR ON THE ROOF WITH ASSOCIATED MECHANICAL
   
11/07/18 
DISTRICT OF COLUMBIA / DANIEL MCGUIRE
P1901098 / SUPPLEMENTAL
300 M ST SE 8TH FL   
10/24/18 
FEDERAL CENTER LP / ALFRED JORDAN 2024375067
E1900838 / SUPPLEMENTAL
300 M ST SE 8TH FLOOR 20003   
10/22/18 
JBG SMITH - MORGAN JOHNSON-MASSEY / null
E1900736 / SUPPLEMENTAL
130 M ST SE   
11/09/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / RICHARD PLUMLEY
P1901176 / SUPPLEMENTAL
250 M ST SE   
11/07/18 
WCSMITH - BRIAN STROTT / GEORGE ARTHUR KING
SB1900025 / CONSTRUCTION
Drill and construct two 2 inch diameter observation wells 42 feet below existing grade utilizing mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulation.
400 M ST SE   
10/18/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1900650 / SUPPLEMENTAL
   
11/02/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1901156 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
10/31/18 
CONSOLIDATED RAIL CORPORATION / BRANDON KNAPP
AH1900131 / CONSTRUCTION
Work in the public ROW with the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, concrete structure, paving, and site restoration construction activities.
   
11/07/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1900023 / CONSTRUCTION
Per Work Plan, Geotechnical Investigation, dated October 18, 2018 (see attached), the work involves drilling 12 soil borings using a HSA rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 80 to 150 ft. Borings will be properly backfilled after completion.
1111 NEW JERSEY AVE SE   
10/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900581 / SUPPLEMENTAL
   
10/23/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL PISA; PISA
SG1800505 / CONSTRUCTION
Install 2 sets of wall mounted illuminated channel letters
   
10/25/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900860 / SUPPLEMENTAL
   
11/05/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL B. BELL
E1901199 / SUPPLEMENTAL
227 TINGEY ST SE   
10/17/18 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
AH1900079 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 10 / 22 through 11 / 3.
   
11/01/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900141 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 11 / 5 through 12 / 5.
300 TINGEY ST SE   
11/05/18 
FC BOILERMAKER LLC / DREW PEISHEL; JOHN RANOUS
B1813340 / CONSTRUCTION
Minor interior tenant improvment including building one non-load bearing partitiion wall adding millwork fixtures including cash desk, fitting rooms. No Structural work. Some electrical updates. **LEVEL 2 ALTERATION
   
11/08/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1901337 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.