Since January, 2003
            
 (a random before-and-after moment)
September 20, 2009
October 5, 2014
9th at Virginia, Looking South-Southeast (see more)

When the news hit in recent days that Forest City is entertaining offers from developers interested in renovating the massive Building 202 at 5th and M, a long-dormant ember deep in my brain was re-sparked: would someone ever take pity on the JDLand camera and allow some interior "before" photos of the 1941 building also known as the Broadside Mount Shop and the Gun Assembly Building?
It turns out that sometimes the best way to do something you've wanted to do for 12 years is to actually ask.
Last week I was given a tour of the 215,000-square-foot building, often by flashlight since there is no power currently on inside, and here is a gallery of photos for your perusal. There were some areas I was not allowed to depict here: I guess when I finally write a book about all of this in 2030 or so I will get to unveil that particular mystery.
However, you are still able to see a pretty astonishing space, even given its current run-down state, and it's easy to see why developers would be eyeing it as a potential high-risk high-reward rehabilitation of a historic building. The inner atrium runs the complete length of the building and up to the roof, while the sides of the building (where the four narrow strips of windows are in the above photo) offer the sort of industrial/exposed-brick goodness that plenty of architects spend a lot of time trying to emulate.
As mentioned above, Forest City does not have plans for the building anytime soon, and decided to market it to see whether another company might potentially have a vision for it that meshes well with the general direction of the Yards--and one that of course would be willing to pay more than a few pennies to buy the building.
Here are some of the photos, but look at the gallery to see the complete set.
Comments (10)
   
 
 More About Factory 202/Yards

JDLand.com Home

Comments

dude says: (11/1/15 8:27 PM)
Cool! Love those high walkways.


GG says: (11/1/15 8:32 PM)
Were you not allowed to show areas because of redevelopment drafts or storage there, or are there still actually like classified things in there?


JD says: (11/1/15 8:39 PM)
Not classified.


crispy says: (11/2/15 12:37 PM)
This building would have made a great haunted house.


smitty2k1 says: (11/2/15 7:05 PM)
About two weeks ago a construction crew installed a wood floor in this building. They also set up a bunch of tents and portable bathrooms outside. Someone said it was for a very swanky wedding.


JD says: (11/2/15 7:07 PM)
No, you are thinking of the building just behind USDOT at 3rd and Tingey. This is the much, much, MUCH larger building between VIDA Fitness and the gates of the Navy Yard.


conngs0 says: (11/3/15 10:33 AM)
Speaking of that building (behind 3rd and Tingey), I'm pretty surprised that it hasn't been developed to be used beyond the rare special event. Seems like a great opportunity to me.


JD says: (11/3/15 10:45 AM)
It's controlled by JBG as part of the USDOT footprint and PUD.


JES says: (11/3/15 1:01 PM)
Didn't I read somewhere (maybe here) that JBG was finally at least marketing that building?


conngs0 says: (11/3/15 2:04 PM)
I sure hope so. The occasional wedding or (bad/obscure) art exhibit is pretty significant underutilization of that building!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

202_cyclist on Postponing the Happy: So it is referring to the Caps? They’re colluding with Tampa?
JD on Postponing the Happy: Twitter says it's "collusion." And those are Ovechkin and Kuznetsov's numbers.
202_cyclist on Postponing the Happy: There is a sign at the top of the F1rst building, “8 + 92 = CROBOP” (In Cyrillic...
jdc on Postponing the Happy: Speaking of Half Street improvements, within the last few weeks additional light...
202_cyclist on Postponing the Happy: There was a big debate a while ago on this site about whether exterior work for ...
VelocityChris on Postponing the Happy: JD-yes, there are signs in the window and I received a paper in the mail. Closin...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/19/18
400 B/O M ST SE   THEFT
Shoplifting
 05/16/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/16/18
400 B/O M ST SE   THEFT
Shoplifting
 05/15/18
900 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/12/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/11/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/10/18
100 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/09/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/09/18
UNIT B/O M ST SE   BURGLARY
Burglary Two
 05/09/18
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/08/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/08/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/06/18
400 B/O M ST SE   THEFT
Shoplifting
 05/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/30/18
900 B/O 5TH ST SE   HOMICIDE
Murder II
 04/30/18
100 B/O L ST SE   ROBBERY  04/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/27/18
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/26/18
1200 B/O SOUTH CAPITOL ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/26/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/24/18
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/23/18
1100 B/O 2ND PLACE SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
05/01/18 
DC WATER / DAVE LEVINE
AH1800901 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 DC WATER. CORMAN CONSTRUCTION 301-34-5417.
907 4TH ST SE   
05/01/18 
RYAN WILLING / null
E1806431 / SUPPLEMENTAL
   
04/30/18 
RYAN M WILLING / KYLE YOST
SOL1800442 / CONSTRUCTION
4.2kw rooftop solar pv system, less than 4' above roof
1212 4TH ST SE   
04/23/18 
FOREST CITY APARTMENTS / null
PP1803006 / POST CARD
101 H ST SE   
05/14/18 
SQUARE 737 LLC / DFM DEVELOPMENT SERVICES, LLC
B1808785 / CONSTRUCTION
Revision to Permit TL1800054 to revise the Whole Foods Market permit address from 800 New Jersey SE to 101 H Street SE.
100 H ST SE   
05/14/18 
DISTRICT OF COLUMBIA / null
E1806787 / SUPPLEMENTAL
2 I ST SE   
05/08/18 
CRESENT CAPITOL VIEW MF LLC / COMPOSITION SYSTEMS INC
AH1800928 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SUNDAY 5 / 13 / 18 FROM 7 AM UNTIL 7 PM UNDER OCCUPANCY PERMIT PA10636830 TO INSTALL A SIGN BAND.
10 I ST SE   
05/02/18 
CAPITOL HILL RACQUET CLUB / JOHN WYCKOFF
SB1800290 / CONSTRUCTION
Install 4 soil borings to less than 50 feet using dual tube geoprobe DPT tooling. Collect soil samples and install 1-inch diameter sch 40 PVC temp monitoring wells in 2 of 4 borings. Wells and borings will be abandoned with 24 hours of sampling using a bentonite grout mixture with bentonite / water ratio of 2 to 1. All IDW will be contained in drums.
150 I ST SE   
05/17/18 
SQUARE 737 LLC / JAMES WOLF
P1806078 / SUPPLEMENTAL
421 L ST SE   
05/16/18 
DORAN BUTUCHE / DORAN BUTUCHE
F1800255 / CONSTRUCTION
To install a fence and gate to the front yard. The construction, placement, style and color will be similar to fencing already in place at adjoining homes. Entire fence is in public space.
202 M ST SE   
05/18/18 
NURI EROL / PAT SNYDER
B1804587 / CONSTRUCTION
EXISTING PIZZA RESTAURANT - NEW OWNER, NEW EQUIPMENT + NEW GELATO & COFFEE SERVICE. MINOR HVAC, PLUMBING & ELECTRIC
800 NEW JERSEY AVE SE 1ST FL   
05/14/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1806780 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
05/09/18 
WHOLE FOODS MARKET / MELISSA DIAZ
TL1800054 / CONSTRUCTION
THE PROJECT IS A TENANT FIT-OUT OF AN EXISTING SPACE IN A MIXED USE PROJECT BEING DEVELOPED UNDER A SEPARATE PERMIT. THE PROJECT IS A WHOLE FOODS MARKET OCCUPYING THE GROUND FLOOR AND A MEZZANINE WITHIN THE BUILDING. - TPR
   
05/11/18 
SQUARE 737 LLC / null
P1805955 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/24/18 
CSX TRANSPORTATION, INC. / NA CSX TRANSPORTATION, INC.
AH1800871 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
05/11/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1800309 / CONSTRUCTION
Per " Work Plan, Geotechnical Investigation, dated May 2, 2018 (see attached), the work involves drilling 6 soil borings using a hollow stem auger rig and a mud rotary drill rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 75 to 150 ft.
1100 NEW JERSEY AVE SE 2ND FL   
05/10/18 
SQUARE 742 LLC / null
P1805902 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 6TH FL.   
04/24/18 
SQUARE 742 LLC / null
P1805463 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/24/18 
SQUARE 742 LLC / null
P1805476 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
04/23/18 
JBG/FEDERAL CENTER LLC / JOE SPINELLI
B1804445 / CONSTRUCTION
Interior Alteration of existing Starbucks on first floor, CO151951, to include new finishes and furniture, electrical, plumbing, mechanical, 19 seats, 43 occupancy load, 1,781sqft. No exterior work.
   
04/23/18 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1807818 / CONSTRUCTION
INTERIOR RENOVATIONS FOR 1ST FLOOR CONFERENCE ROOM. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. 185 SQUARE FEET. DOT
71 POTOMAC AVE SE   
05/11/18 
MRP REALTY / ELIZABETH DE SMET
SB1800270 / CONSTRUCTION
Installation of 124 wellpoints to assist in the construction of mixed use structure at Potomac Avenue.
   
05/18/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800039 / CONSTRUCTION
Removal of an Underground Storage Tank (UST) 7 feet in diameter and approximately 9 feet long (approximately 2000 gallons). Suspected Fuel Tank. Tank is filled with 8 inches of unknown content. Tank will be removed and disposed off as per the appropriate standards and requirements.
227 TINGEY ST SE   
04/25/18 
JW CAPITAL PARTNERS / MELISSA DIAZ
B1801074 / CONSTRUCTION
Parcel L1- New construction of 11-story full service hotel with restaurant and retail per Zoning Order 17-07. Includes 225 hotel rooms and 4 elevators. SWM and GAR combined with adjacent Parcel L2 to be permitted separately. TPR
221 TINGEY ST SE   
04/30/18 
GONE YARD HOTEL OWNER, LLC / DFM DEVELOPMENT SERVICES, LLC
B1808252 / CONSTRUCTION
Yards Parcel L-1 : Permit Revision for B1801074 to update owner information to Gone Yard Hotel Owner, LLC and permit address to new address: 221 Tingey Street SE.
300 TINGEY ST SE   
05/09/18 
FC BOILERMAKER LLC / FAY A KENNEDY
E1806640 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.