As someone who has, shall we say, a pretty firm grasp on the plans and locations for new buildings in the neighborhood, I admit to a jolt here or there when skeletons arise and become visible--especially in spots at which I hadn't yet imagined seeing them.
With the residential buildings at Florida Rock and 801 New Jersey now in the showy above-ground portion of construction, I got jolted quite a few times during a four-hour walk around the neighborhood on Sunday to catch up on photos.
Here's a few images that perhaps might jolt you too, starting with the one above, looking directly at Dock 79 from the DC Water bridge along the Riverwalk, which also should be compared to this view from just before the final demolition of the concrete plant. And while there's this one that I've been waiting to see, looking east along Potomac Avenue from South Capitol Street, with work on the top floor now underway, there's also the "surprise" view from the Yards Park (click to enlarge):
Dock 79 is also quite visible now when looking south along 1st Street, and even from New Jersey and M (in person, not with a wideish-angle lens!).
As for 801 New Jersey, it hasn't risen more than a couple floors, but it's still starting to show itself at locations other than the intersection of New Jersey and I--like along K Street, at 1st and at 2nd Place (I've added a small helpful pointer in case you aren't seeing it). It's going up a total of 13 floors, so it's only going to get more noticeable from more locations.
Of course, if a favored view is being eclipsed by this "progress," my sympathies. At least someone thought to take "before" photos.
(PS: The Reader Poll will be closing soon, so hurry up and vote. Tell us your favorite haunts around the 'Hood, and tell me a little about yourself. Pretty please? There may be a coveted JDLand t-shirt in it for you!)
Comments (5)
   
 
 More About Development News

JDLand.com Home

Comments

dude says: (10/12/15 9:55 AM)
Whatever it looks like in the end, both Canal and Yards park will be nice sanctuaries amongst the tall buildings.


conngs0 says: (10/12/15 10:28 AM)
Absolutely. Definitely thankful that those parks were in the plans from the beginning. The NoMa developers didn't think about that and now it looks like that neighborhood will be devoid of any good sanctuary / green space. They still got the REI that I wanted for our neighborhood though!


JES says: (10/12/15 11:08 AM)
Why is there such a large gap on I between 801 NJ and 70I? Will anything ever infill there, or is it destined to just look weird for all eternity?


JD says: (10/12/15 11:44 AM)
That land is owned by CSX, so you be the judge. :-)


Brett M says: (10/13/15 11:19 AM)
Wow, what a difference a few weeks makes. Can't believe Dock79 is rising so fast. Pretty soon they'll be topping off.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

bdj on ANC 6D07 Candidates: Yes!! Jimmy Johns would be great!
JD on ANC 6D07 Candidates: ABC application seems to indicate that the new liquor store at 1015 Half Street ...
CJBabyDaddy on ANC 6D07 Candidates: Last time I went to the TG on 1st Street, just north of the ballpark, I was unse...
GarfieldPark on ANC 6D07 Candidates: It wasn't that bad, although too hipster for me. I'll take a Jimmy John's...you'...
bdj on ANC 6D07 Candidates: I've always thought that Taylor Gourmet was a poor restaurant. Food wasn't great...
JD on ANC 6D07 Candidates: That's my assumption, too. By the time you demolish the upper floors, you don't ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18
1000 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Street / Unknown
 09/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/18
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/13/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/08/18
400 B/O M ST SE   THEFT
Shoplifting
 09/02/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/26/18

Recent Issued Building Permits Archive  
1108 3RD ST SE   
09/04/18 
JULIANA DUFFY / HERVE BILLIET
SOL1800816 / CONSTRUCTION
This is a new rooftop solar installation for 1108 3rd Street SE, Washington, DC, 20003.
   
09/06/18 
JULIANA DUFFY / null
E1810366 / SUPPLEMENTAL
1015 4TH ST SE   
09/17/18 
GASTON CHAN / KYLE YOST
SOL1800945 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
09/19/18 
GASTON CHAN / null
E1810828 / SUPPLEMENTAL
1300 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810371 / SUPPLEMENTAL
1346 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810372 / SUPPLEMENTAL
1310 10TH ST SE   
09/10/18 
NAVFAC / BLAINE LINKOUS
EX1800093 / CONSTRUCTION
Federal property at the Washington Navy Yard. Project is for the installation of outside underground utilities including new potable water valves and stormdrain. All work is cut and cover utility install. Sediment controls will be provided.
2 EYE ST SE   
09/18/18 
null
M1803959 / SUPPLEMENTAL
   
09/18/18 
null
P1809280 / SUPPLEMENTAL
4 I ST SE   
08/29/18 
CRESCENT COMMUNITIES / MITCH A. PERMUY 727-210-0492
E1809865 / SUPPLEMENTAL
   
09/18/18 
JOHN MORIARTY / null
M1803958 / SUPPLEMENTAL
2 I ST SE   
08/27/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801251 / CONSTRUCTION
WR #3573836-VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM
   
08/29/18 
CRESCENT CAPITAL VIEW LLC / KIM MITCHELL
TL1800059 / CONSTRUCTION
EXPEDITION / VELOCITY PROGRAM - INTERIOR WORK ONLY FULL-SERVICE RESTAURANT WITH 78 SEATS AND 80 OCCUPANTS INDOORS. WITH BUILDOUT OF AN EXISTING COLD DARK SHELL STRUCTURE AT THE GROUND FLOOR OF THE 2 I STREET BUILDING PERMIT B1713380. THE BUILDOUT IS FOR A RETAIL KITCHEN.
   
09/11/18 
MCDONALDS CORPORATION / null
E1810511 / SUPPLEMENTAL
   
09/19/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801319 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - PEPCO CREWS WILL ALSO BE WORKING WEEKENDS (SATURDAY AND SUNDAYS) FROM 6AM TIL 6PM - WORK IS ONGOING
150 I ST SE   
09/10/18 
WILLIAM CSMITH CO / GLENNWOOD ROGERS
M1803857 / SUPPLEMENTAL
418 L ST SE   
09/14/18 
null / NA NA NA
EHOP18998072 / HOME OCCUPATION
202 M ST SE   
09/05/18 
UNITED STATES OF AMERICA / DANIEL KISER; X
SG1800384 / CONSTRUCTION
Installation of 4 wall mounted signs. 2 @ 26.25 SF and 2 @ 35.5 sf
300 M ST SE   
08/27/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809629 / CONSTRUCTION
INTERIOR RENOVATION TO 3RD FLOOR OFFICE SPACE FOR NEW MEDICAL OFFICE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. LEAD WALLS FOR X-RAY ROOM. NO STRUCTURAL. 3006 SQUARE FEET. THE CENTERS FOR ADVANCED ORTHOPEDICS, LLC SUITE 325 **CHANGE IN USE, LEVEL 2 ALTERATION
   
09/05/18 
FEDERAL CENTER LP / null
P1808927 / SUPPLEMENTAL
   
09/05/18 
FEDERAL CENTER LP / null
P1808926 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE 1ST FL   
09/18/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1809276 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 3RD FLOOR   
09/17/18 
SQUARE 742 LLC / null
P1809222 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
08/30/18 
SQUARE 742 LLC / null
E1810159 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
09/07/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ASHLEY TORRES
TL1800132 / CONSTRUCTION
Tenant Layout to 1st floor for commercial bank use. 3036SF
   
09/10/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M1803863 / SUPPLEMENTAL
   
09/12/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1810553 / SUPPLEMENTAL
125 O ST SE   
08/29/18 
DISTRICT OF COLUMBIA / DAVID T FONTANA
B1803497 / CONSTRUCTION
Revision to issued permit B1700636 for new six story DC WATER HQ office to include: Minor door, ramp and partition changes, corrections to foundation, slab and framing due to field conditions, MEP & FA coordination with other changes, minor changes to landscaping and water utility site work.
71 POTOMAC AVE SE   
08/27/18 
FORIDA ROCK PROPERTIES INC / null
AH1801250 / CONSTRUCTION
afterhours to pour concrete on jobsite from 8 / 27 / 2018 to 9 / 27 / 2018 from 9pm to 7am
   
08/31/18 
FORIDA ROCK PROPERTIES INC / MITCH PERMUY 7272100492
E1810173 / SUPPLEMENTAL
79 POTOMAC AVE SE   
09/13/18 
RIVERFRONT HOLDINGS I LLC / JOHN HOMICK 301-390-4800
E1810571 / SUPPLEMENTAL
221 TINGEY ST SE   
09/10/18 
KELLY THORNBURG / GLENNWOOD ROGERS
M1803850 / SUPPLEMENTAL
227 TINGEY ST SE   
09/07/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1801286 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for precast concrete fa├žade panel installation. Work to take place from 7pm on 9 / 24 / 2018 to 7am on 9 / 25 / 2018.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.