For posterity's sake, here's a quick survey of the late-summer state of construction at various sites--hope you like the Douglass Bridge-based views of the
Arris and
Dock 79 residential projects, for a bit of variety. Arris is close to having all of its exterior glass installed, while Dock 79 is just about halfway through to its eventual 10-floor height.
Otherwise, the masonry work continues slowly at the
Lofts at Capitol Quarter (lower left), while the windows are in at the new
Community Center (lower middle) and the
Brig beer garden at 8th and L does show evidence of progress.