Since January, 2003
            
 (a random before-and-after moment)
April 2, 2006
May 29, 2016
8th at Virginia, Looking Southwest (see more)

They're still putting their makeup on, but after a soft opening over the next few days, Due South is planning to open its doors for real on Monday, Aug. 17 in the northwest corner of the Lumber Shed at 3rd and Water in the Yards.
The southern-themed restaurant is the latest from the Bo Blair empire, he of the Fairgrounds, and Jetties, and the Bayou, which is where Due South executive chef Rusty Holman made his home before moving to the Yards.
It will be just dinner service starting at 5 pm during the first few weeks, with weekday lunch and weekend brunch offerings coming probably in early September.
The official web site isn't up and running right this instant, but once it is, you should be able to see the menu and more details.
When I visited this morning, there was a lot of work still going on, but they were nice enough to let me take a few photos while I dodged the crowd of workers bringing in the cartons of eggs and stocking the bar.
Comments (20)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

JD says: (8/14/15 12:31 PM)
And in other opening news, the Bluejacket Bottle Shop & Tasting Room is opening tomorrow (Aug. 15): link


JD says: (8/14/15 5:28 PM)
Also, though it will be really hard to tell the difference compared to my pitiful output of late, I'm going to be especially out of pocket for the next two weeks. Talk amongst yourselves, and play nicely.


JNB says: (8/17/15 2:13 PM)
JD- link

You are always first to report!! Do you have any details on ground breaking?


202_cyclist says: (8/17/15 6:03 PM)
*We ate at Due South on Friday night. The food and service were both great and the restaurant is very attractive inside.

*It appears that after a long hiatus, work on the Brig has resumed. It should be finished in time for the Nationals post-season appearance this October....

*Also, you said there is nothing planned for the lot behind the McDonalds on South Capitol Street but it looks like the land was recently graded there and this looks distinct from the CSX construction.

*Finally, what is the consensus on the CSX construction? For us it hasn't been even a slight disruption.


JD says: (8/17/15 6:36 PM)
@JNB, as I said above, I am very much out-of-pocket (about 5 time zones out of pocket). I had heard rumors of this, but don't know anything else right now. And there wouldn't be any groundbreaking-type details at this early of a stage anyway, if they are still in the zoning phase.

@202, Nats/October, ha-ha.




JNB says: (8/17/15 8:56 PM)
So you're at the DC zoning office:) seems like 5 time zones away sometimes. Have fun!!!!


Chris says: (8/18/15 12:21 PM)
In closing news - it looks like Sizzling Express is closed. The sign on the door says "SIZZLING EXPRESS CLOSED THANK YOU FOR YOUR PATRONAGE".


conngs0 says: (8/18/15 1:13 PM)
I had lived in the neighborhood for two whole before realizing that Sizzling Express was actually open! I hate to see a business not make it. But despite being in a pretty bland building, that intersection might prove to be a good opportunity for another business, either a restaurant or perhaps some sort of retail.

Also, that Bardo beer garden "planned" for the south side of Nats Park has applied for a liquor license. link


JHUGrad says: (8/18/15 4:26 PM)
I wonder if the Sizzling Express was limited in the hours that it could be open due to the building that it was in. It made absolutely no sense to me that the Sizzling Express was closed on weekends and evenings.


walt says: (8/19/15 6:46 PM)
Sizzling Express was open during the hours that it was likely to get business because of its food selection. It was a breakfast and lunch bar. For anyone that ever went in, I don't think it's a surprise that it closed once the Harris Teeter opened and offered more selection and better food in the same type of hot bars. It also had a health code violation a few months ago. I was betting on it closing by October. It beat me by 1.5 months.


Section314 says: (8/22/15 12:32 PM)
99 M parking lot was closed for Nats game last night. It has been open for games most of the summer. Two excavators were parked on the lot. I construction about to commence?


conngs0 says: (8/23/15 3:02 PM)
No idea, but it'd be cool to get another project underway. The Nats announcers remarked on Friday night (after having returned from a ten-game road trip) how much the current projects have progressed and how it seemed like there were more cranes in the neighborhood than when they left. Would be good to keep the momentum going!


Alan says: (8/24/15 9:36 AM)
2nd crane added to the 909 Half St site. 2nd crane added to the F1rst site. 1st crane built at the Homewood Suites site. Hampton Inn banner hung on West Side of building. Construction nearly reaching ground level at 801 NJ Site. Sidewalks being built on I between NJ and 2nd! Due South is really good. Lots happening.


202_cyclist says: (8/24/15 12:19 PM)
Is there anything planned for the lot next to Parc Riverside? There is a fence there with blue siding around the perimeter of the lot.


JD says: (8/24/15 3:19 PM)
Toll owns it, and is planning another apartment building, but there's been no announcement as yet to any sort of timeline.


JES says: (8/25/15 3:02 PM)
No building permits filed for any kind of work there? I was wondering why they covered it with that blue crap.


willinrm says: (8/26/15 10:37 AM)
This comment section has become my new source of news!! lol


JD says: (8/26/15 1:34 PM)
Me too! :-)

I'll be back in the saddle next week, and well refreshed too, with plans to shake off the listlessness of the summer....


Section314 says: (8/27/15 11:35 PM)
First thing back, you can go take pictures of the construction starting at 99 M. It's definitely underway now.


willinrm says: (8/28/15 4:15 PM)
does anyone have a navy yard/eastern market/capitol hill happy hour website? database? spreadsheet? I can find a few very incomplete ones online but that's about it.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

JD on Weekly Open Thread: Post article on the Virginia Avenue Tunnel and reports by frontline residents of...
202_cyclist on Weekly Open Thread: Also, that photo in the WBJ article explains what the helicopters are doing flyi...
202_cyclist on Weekly Open Thread: JD-- regarding the link that you Tweeted about, more housing is always welcome b...
JES on Weekly Open Thread: Looks like Circa is still coming, but Open Road is no more. From reading this, i...
UpEarly on Weekly Open Thread: The CSX land behind ORE 82 is under contract to Greystar (national apartment dev...
JD on Weekly Open Thread: Greystar is under contract to buy the huge CSX parcel that runs west from New Je...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/19/18
400 B/O M ST SE   THEFT
Shoplifting
 05/16/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/16/18
400 B/O M ST SE   THEFT
Shoplifting
 05/15/18
900 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/12/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/11/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/10/18
100 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/09/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/09/18
UNIT B/O M ST SE   BURGLARY
Burglary Two
 05/09/18
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/08/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/08/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/06/18
400 B/O M ST SE   THEFT
Shoplifting
 05/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/30/18
900 B/O 5TH ST SE   HOMICIDE
Murder II
 04/30/18
100 B/O L ST SE   ROBBERY  04/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/27/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
05/01/18 
DC WATER / DAVE LEVINE
AH1800901 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 DC WATER. CORMAN CONSTRUCTION 301-34-5417.
907 4TH ST SE   
05/01/18 
RYAN WILLING / null
E1806431 / SUPPLEMENTAL
   
04/30/18 
RYAN M WILLING / KYLE YOST
SOL1800442 / CONSTRUCTION
4.2kw rooftop solar pv system, less than 4' above roof
101 H ST SE   
05/14/18 
SQUARE 737 LLC / DFM DEVELOPMENT SERVICES, LLC
B1808785 / CONSTRUCTION
Revision to Permit TL1800054 to revise the Whole Foods Market permit address from 800 New Jersey SE to 101 H Street SE.
100 H ST SE   
05/14/18 
DISTRICT OF COLUMBIA / null
E1806787 / SUPPLEMENTAL
101 H ST SE   
05/22/18 
SQUARE 737 LLC / null
M1802469 / SUPPLEMENTAL
   
05/23/18 
SQUARE 737 LLC / null
P1806213 / SUPPLEMENTAL
2 I ST SE   
05/22/18 
CRESCENT CAPITOL VIEW / null
E1807051 / SUPPLEMENTAL
   
05/08/18 
CRESENT CAPITOL VIEW MF LLC / COMPOSITION SYSTEMS INC
AH1800928 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SUNDAY 5 / 13 / 18 FROM 7 AM UNTIL 7 PM UNDER OCCUPANCY PERMIT PA10636830 TO INSTALL A SIGN BAND.
   
05/23/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
TC1800034 / CONSTRUCTION
Renewal of tower crane permit #TC1700022 EXTENSION WILL EXPIRE ON 11 / 23 / 2018
10 I ST SE   
05/02/18 
CAPITOL HILL RACQUET CLUB / JOHN WYCKOFF
SB1800290 / CONSTRUCTION
Install 4 soil borings to less than 50 feet using dual tube geoprobe DPT tooling. Collect soil samples and install 1-inch diameter sch 40 PVC temp monitoring wells in 2 of 4 borings. Wells and borings will be abandoned with 24 hours of sampling using a bentonite grout mixture with bentonite / water ratio of 2 to 1. All IDW will be contained in drums.
150 I ST SE   
05/17/18 
SQUARE 737 LLC / JAMES WOLF
P1806078 / SUPPLEMENTAL
421 L ST SE   
05/16/18 
DORAN BUTUCHE / DORAN BUTUCHE
F1800255 / CONSTRUCTION
To install a fence and gate to the front yard. The construction, placement, style and color will be similar to fencing already in place at adjoining homes. Entire fence is in public space.
202 M ST SE   
05/18/18 
NURI EROL / PAT SNYDER
B1804587 / CONSTRUCTION
EXISTING PIZZA RESTAURANT - NEW OWNER, NEW EQUIPMENT + NEW GELATO & COFFEE SERVICE. MINOR HVAC, PLUMBING & ELECTRIC
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
800 NEW JERSEY AVE SE 1ST FL   
05/14/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1806780 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
05/09/18 
WHOLE FOODS MARKET / MELISSA DIAZ
TL1800054 / CONSTRUCTION
THE PROJECT IS A TENANT FIT-OUT OF AN EXISTING SPACE IN A MIXED USE PROJECT BEING DEVELOPED UNDER A SEPARATE PERMIT. THE PROJECT IS A WHOLE FOODS MARKET OCCUPYING THE GROUND FLOOR AND A MEZZANINE WITHIN THE BUILDING. - TPR
   
05/11/18 
SQUARE 737 LLC / null
P1805955 / SUPPLEMENTAL
   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
05/11/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1800309 / CONSTRUCTION
Per " Work Plan, Geotechnical Investigation, dated May 2, 2018 (see attached), the work involves drilling 6 soil borings using a hollow stem auger rig and a mud rotary drill rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 75 to 150 ft.
   
05/23/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION INC.
AH1800974 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities. **TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
05/10/18 
SQUARE 742 LLC / null
P1805902 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
05/22/18 
DONOHOE REAL ESTATE SERVICES / null
M1802478 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/11/18 
MRP REALTY / ELIZABETH DE SMET
SB1800270 / CONSTRUCTION
Installation of 124 wellpoints to assist in the construction of mixed use structure at Potomac Avenue.
   
05/18/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800039 / CONSTRUCTION
Removal of an Underground Storage Tank (UST) 7 feet in diameter and approximately 9 feet long (approximately 2000 gallons). Suspected Fuel Tank. Tank is filled with 8 inches of unknown content. Tank will be removed and disposed off as per the appropriate standards and requirements.
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
221 TINGEY ST SE   
04/30/18 
GONE YARD HOTEL OWNER, LLC / DFM DEVELOPMENT SERVICES, LLC
B1808252 / CONSTRUCTION
Yards Parcel L-1 : Permit Revision for B1801074 to update owner information to Gone Yard Hotel Owner, LLC and permit address to new address: 221 Tingey Street SE.
300 TINGEY ST SE   
05/09/18 
FC BOILERMAKER LLC / FAY A KENNEDY
E1806640 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.