Since January, 2003
            
 (a random before-and-after moment)
August 3, 2008
June 16, 2018 
2nd (Mid) at I, Looking South-Southwest (see more)

It's time to add another dining option to the neighborhood lineup, as Scarlet Oak has put out the word that it is opening at 4 pm tomorrow, Saturday, Aug. 1, on the northwest corner of New Jersey Avenue and K Streets, SE, in the ground floor of the 909 New Jersey apartment building.
The fare is "casual American," and the menu is available for your perusing, showing a range of small plates and "nibbles," pizza, and entrees, plus some intriguing cocktails.
If and when you venture in, take to the comments to let us know your impressions.
Comments (2)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

conngs0 says: (7/31/15 4:18 PM)
Fantastic! Looking forward to reading some reviews and trying it out myself. Great weekend (at night at least) that patio!


neighborlove says: (8/4/15 9:47 AM)
My husband and I had dinner there Sunday night. The food was actually really good! I had kale chips for an appetizer and my husband had a meatball appetizer. It was small portions, but it was priced at $5, so it seemed appropriate. I had tuna tartare for my dinner and my husband had the spicy sausage pizza. The pizza was delicious! We asked for it well done and the bottom of the crust was crispy, like if you did it over a camp fire. For dessert, we had the creme brûlée and the sherbet. Both were pretty good. I would consider the creme dessert a cold one, while sometimes they are prepared warm. The sherbet was advertised by our waiter as having a chocolate scoop, which it did not. He was frustrated as that is why he got it. After pointing this out to the waiter, he made it right by bringing us a whole bowl of chocolate sherbet which was delicious! Also, I had a mixed cocktail that they advertised. It was vodka, fresh strawberry, and some simple syrup. It was very good, but I felt a little pricey at $10 based on the size of it. The manager came by and asked how our experience was. I did let him know that the appetizers came out too close to our meals and we had to wait too long to get the appetizer. He listened and apologized and assured us within the next two weeks, they would have all the timing issues worked out. He introduced himself as Peter and was extremely approachable. We will definitely be back there!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

JD on June Construction Update: It's on the same lot--it will "close the square" with the current building. Thei...
Joni on June Construction Update: Where is 4 I Street? Right next to 2 I Street is the car wash, and next to that ...
JD on June Construction Update: DC Water needs a "back of the house," I assume. Plus eventually that side will b... [image]
jdc on June Construction Update: Any reason the DC water building does not have windows on the 'back'? Also, I re...
jdc on June Construction Update: You can't tell it from the photos but the Parc Riverside Phase 2 is sort of awkw...
RMP on June Construction Update: Great pics, JD! Does anyone know what is under construction in the space between...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18

Recent Issued Building Permits Archive  
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
800 NEW JERSEY AVE SE   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.