It's still relatively early in the process, but let's take a look at the changes that have already been put in place thanks to the start of construction on the Virginia Avenue Tunnel.
The closure of Virginia between 4th and 5th Streets, SE (seen here) has probably had the greatest impact so far, preventing vehicles from taking Virginia toward 8th Street (and its outbound ramp to I-695) unless one goes south on 4th to K, then north on 5th.
According to CSX, there will be increased prep work at this location this week, and it could see the start of drilling for steel and concrete pilings as early as the week of July 20.
Immediately to the south, the stockade fences are going up in front of the nearby townhomes, and the little stub of I Street has been closed east of 4th and east of the alley that runs between the townhouses and St. Paul's (see below left, click to enlarge). The I Street "hook" into Virginia Avenue will not reopen--the pocket park in this location will be reconfigured and enlarged once construction is finished.
Some moving of dirt has actually begun, as you see above in the shot of Virginia Avenue east of 2nd, alongside the stretch of road that was closed a few weeks ago.
The initial cutting down of trees along Virginia is particularly noticeable west of 3rd, as shown in this comparison of a 2007 photo and one from today (more before-and-afters of this intersection here):
According to the latest updates from CSX, parking will be restricted this week on Virginia between 3rd and 4th to allow for more cutting down of trees. And it's expected that perhaps as early as next week Virginia Avenue will be closed between 8th and 9th. (The numbered cross streets remain open.)
One other closure worth photographing is the underpass just to the south of Garfield Park, where skateboarders can still congregate (yay?), but is now closed to any attempts to get completely south of the freeway.
CSX is holding another one of its "Coffee with Chuck" events on Thursday, July 23 from 7:30 to 9 am at the Courtyard by Marriott at 140 L St., SE, in case you'd like to hear the latest updates and ask questions of the chief project engineer. (RSVPs requested.) Slides from the June ChucKlatch have been posted as well.
There's also now the option to receive updates on the project via SMS, should you wish.
The Virginia Avenue Tunnel official web site has more, and I've started getting my own Virginia Avenue Tunnel page prepped for the expected onslaught of before-and-afters
Comments (5)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

JD says: (7/13/15 9:28 AM)
In other news:

07/09/15
BUFFALO WILD WINGS / X-PEDITERS PLUS INC.
D1500674 / CONSTRUCTION
INTERIOR DEMOLITION ONLY. PER PLANS.


S.B. says: (7/13/15 2:42 PM)
Is there any word on when they will be fencing off the block between 3rd and 4th street? I was under the impression that they were going to be fencing off that entire stretch at once rather than in phases.


jg says: (7/13/15 5:15 PM)
@ S.B. - "Coffee with Chuck" slides say "early October" for shutting down VA Ave between 3rd and 4th. Of course, who really knows. They are supposed to be cutting down the trees on this block this week, which will probably require a temporary closure of the street, given the size of the trees, but those are details the project team rarely communicates with any specificity.


JD says: (7/13/15 5:39 PM)
Quoting from my post:

"According to the latest updates from CSX, parking will be restricted this week on Virginia between 3rd and 4th to allow for more cutting down of trees. "

That came right from one of their e-mail updates, which actually said this:

"The parking spaces along Virginia Avenue S.E., between 3rd and 4th Streets will be reserved during work hours, 7 a.m. to 7 p.m., from Monday, July 13 to Friday, July 17. The parking restrictions are in place to allow for tree removal in the area and are in accordance with DDOT-approved Maintenance of Traffic plans."



jg says: (7/13/15 6:15 PM)
I was referring more to the likely (and unspoken) need to close the street temporarily to allow for the tree removal, not the fact that they sent an email regarding parking restrictions due to tree removal. Not sure how they can get those massive trees down without shutting down the street for safety purposes, but perhaps they can.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Slider-Palooza 2019: @ColoradoCane: I spoke with one of the construction workers the other night and...
walt on Slider-Palooza 2019: @CJBabyDaddy: Whaaaat? How do you always know so much? This is great. Thx! @...
ColoradoCane on Slider-Palooza 2019: Does anyone know what the work going on at the intersection of NJ & I St. al...
CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.