Since January, 2003
            
 (a random before-and-after moment)
October 18, 2003
August 5, 2017
3rd at M, Looking West-Southwest (see more)

While most residents and observers have been eyeing DC Water's operations site at 1st and O Streets, SE and wondering when Forest City's movie theater/residential/retail project is going to get underway, details are now emerging on the other shiny new development in the works in that same general area: DC Water's plans to build a new headquarters building on top of the existing O Street Pumping Station just east of Nats Park.
(NO, NOT ON TOP OF THE HISTORIC MAIN PUMPING STATION.)
A PUD application has now been filed with the Zoning Commission for the project, to be design/built by Skanska with architect SmithGroupJJR as a "world-class headquarters that integrates efficient building systems with the [existing O Street Pumping Station] to create a dynamic workplace environment" that would be " a bold, innovative statement on the Anacostia River shoreline that reflects DC Water's mission to provide reliable and cost-effective water and wastewater services."
It would be designed as a LEED Platinum building, with stormwater retention, "heat recover and rejection systems" that will use the residual heat from the sewage that is pumped to Blue Plains, and low-impact development landscaping features by OvS "such as bio-swales, pervious pavements, and native vegetation."
The proposed DC Water HQ, as seen from the Anacostia (left), the west looking east (center), and from the Yards Park looking west (right). Renderings from zoning filings. Click to enlarge; and compare to the current view from the river.
The O Street station would keep right on pumping during and after construction, and the HQ design, which encapsulates the pumping station on the south and east and so removes it from view from the river, will include a four-story 190-foot-long east-west truss that will support the new HQ without bearing on the existing pumping station.
As for the PUD itself, it proposes to rezone the site from W-2 to CG/CR, and to only include 21 parking spaces instead of the mandated 69 (yay, nearby transit!).
It also requests flexibility from public space requirements because the building is "deemed essential to supporting the United States government," and so it must "therefore incorporate certain security measures and access restrictions, which impact operation and design of the new building and surrounding area." Here is DC Water's memo on this security topic.
This new headquarters will consolidate and relocate all of the agency's administrative personnel, and get non-essential types away from its currently overcapacity Blue Plains site.
The zoning filing says that this new building "will demonstrate that DC Water's mission is essential to every living organism," and will also "emphasize DC Water's historic role in serving the DC metropolitan area for over a century by providing scheduled educational programming inside the building."
Forest City's planned movie theater would be one block to the north of this site, with the two planned new residential buildings to its west, and a new "1 1/2 Street" would run just to its west (as seen in the left-most rendering of the group of three above).
This will come before ANC 6D for its support before getting to the Zoning Commission on some as-yet unannounced date in the future.
Comments (8)
   
 
 More About DC Water (WASA)
 All posts: DC Water (WASA), zoning

JDLand.com Home

Comments

Daedam says: (6/8/15 5:31 PM)
Wow, I think it's incredible! Bravo to DC Water for proposing a visually interesting, unique, LEED Platinum building that would enhance the riverfront and hide the O Street Pumping Station from view.


202_cyclist says: (6/8/15 6:31 PM)
The building looks great but how many employees does DC Water have? I didn't realize they have enough employees to require such a large building.

Also, I hope DC Water leads by example and minimizes the amount of impervious pavement on the site-- reducing runoff.


BillP says: (6/8/15 7:17 PM)
Tell them to get started immediately!

Adding a corporate HQ is great for the neighborhood. 1,100 total employees so probably at least 350-400 at the new building. Total revenues were $475 million in 2014, roughly the size of a Fortune 1000 company.

Great news, great design and great to have a new building in the pipeline that isn't an apartment building or mid priced hotel chain.


conngs0 says: (6/9/15 10:23 AM)
Totally agree. Huge upgrade over the current state of affairs on the site. Plus the added bonus of clearing the way for the movie theater. I also love the contrast of the modern-looking building next to the historic pumping station. It's probably not as exciting as apartments/condos/hotels (with ground floor retail), but I think the added diversity of projects is a good thing. Hopefully the zoning commission and ANC 6D folks are pleased with the plans and they can get moving on this project soon.


JD says: (6/9/15 11:45 AM)
Meanwhile, nearby, a construction cam for Dock 79:

link

Just about to come out of the ground....


Jaybird says: (6/10/15 6:22 AM)
Looks great, a great synergy of old and new.

Trying to think of anywhere else in our area, where modern new was added on to historic old...



E. Masquinongy says: (6/10/15 3:29 PM)
Gotta say, the existing pumping station is aggressively plain. The new building will sure spice things up.


JHUGrad says: (6/24/15 2:55 PM)
Looks like Showplace Icon is coming to Tyson's Corner. DC needs to get on the ball and get the Showplace Icon project started here in the Capitol Riverfront.

link

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

Snacks on A Photo Tour: Have been to one soccer game for DC United. It was a fun time, had great weather...
202_cyclist on A Photo Tour: JD- I hope your recovery continues apace and you'll be off the 60-day disabled ...
dude on A Photo Tour: @202, yes you could say that about 70I. Also, I'm not a huge soccer fan (I thin...
spiritequality on Tuesday Tidbits: @cjbabydaddy Thanks for the tip in where to look for movie theater info. Hope th...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/18
1000 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/07/18
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/21/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
01/29/18 
DC WATER / DAVE LEVINE
AH1800505 / CONSTRUCTION
After hours work for structure exaction and support for B1311474 DC Water. Corman Construction 202-863-0052.
1016 3RD ST SE   
02/01/18 
ANAMARIA R MOTTOLA / DAVID L. HAHN
P1803348 / SUPPLEMENTAL
1346 4TH ST SE   
02/06/18 
ALAN OWINGS / ROBERT SEV HENRY
AH1800541 / CONSTRUCTION
After Hours Permit for 2 / 19 / 18 from 7AM to 7PM to perform concrete, framing, and utility operations.
   
02/06/18 
FC 1346 LLC / RICHARD V CAREY
P1803428 / SUPPLEMENTAL
150 I ST SE   
02/05/18 
WC SMITH / null
P1803402 / SUPPLEMENTAL
140 M ST SE   
02/07/18 
SPAULDING & SLYE/STE100 / null
E1803798 / SUPPLEMENTAL
110 M ST SE   
01/29/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JAMES WEAVER
E1803534 / SUPPLEMENTAL
   
02/02/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1803361 / SUPPLEMENTAL
140 M ST SE 20032   
02/14/18 
SYLVIA LINDSEY / null
P1803641 / SUPPLEMENTAL
202 M ST SE   
01/29/18 
UNITED STATES OF AMERICA / NURI EROL
D1800281 / CONSTRUCTION
Remove Existing flooring. Remove some of the furnitures, equipment.
300 M ST SE 53533   
02/08/18 
FEDERAL CENTER LP / SPENCER TEEL
BP1801893 / POST CARD
401 M ST SE   
01/30/18 
DOEE C/O DEV MURALI / JESSICA REICHARD
AH1800507 / CONSTRUCTION
After hours permit to preform manhole inspections during off peak hours 7pm - 7am for all Manhole Locations covered under permit # PA10374319-R1 for DOEE Anacostia river sediment project.
861 NEW JERSEY AVE SE   
01/21/18 
CONSOLIDATED RAIL CORPORATION / null
P1802976 / SUPPLEMENTAL
   
01/31/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800467 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.***TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
02/09/18 
SQUARE 742 LLC / null
P1803534 / SUPPLEMENTAL
   
02/14/18 
SQUARE 742 LLC / null
P1803681 / SUPPLEMENTAL
79 POTOMAC AVE SE   
01/22/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
TL1800010 / CONSTRUCTION
1st time tenant layout for restaurant with 212 indoor seats and 350- indoors occupant load. 338 outdoor seats 550 outdoors occupant load.
640 SOUTH CAPITOL ST SE   
02/05/18 
JIM LATISIS ZAYO GROUP
B1707197 / CONSTRUCTION
Addition to existing concrete telecom building.
401 TINGEY ST SE   
01/30/18 
PEPCO / BARBARA ANN STEDMAN
AH1800520 / CONSTRUCTION
UG TRANSFORMER WORK TO BE PERFORMED ON THE 400 BLK OF TINGEY ST SE. MANHOLE ACCESS. WORK TO BE PERFORMED BETWEEN THE HOURS OF 7:30AM AND MIGHTNIGHT ON 1 / 30 / 18 AND 1 / 31 / 18.
227 TINGEY ST SE   
01/29/18 
UNITED STATES OF AMERICA / ERICKA CLARK
TC1800021 / CONSTRUCTION
2 tower cranes
   
01/30/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1802750 / CONSTRUCTION
Revision to Permit SH1700028. Sheeting and shoring for Yards Parcel L-2 project. Revision includes 10-foot precut excavation and layback on Water Street, 3rd Street and northern L-1 elevations, and removal of upper tier of rakers at L-1 elevation and upper tier of tiebacks at the Water Street and 3rd Street elevations.
325 VIRGINIA AVE SE 20003   
02/14/18 
JASON W GOLDSMITH / null
E1804039 / SUPPLEMENTAL
325 VIRGINIA AVE SE   
02/06/18 
JASON W GOLDSMITH / CRAIG HARTSOCK
B1804721 / CONSTRUCTION
Remove two non-structural walls on ground level of townhouse and re-frame in new configuration to create a full bathroom on ground floor.
   
02/07/18 
JASON W GOLDSMITH / MORIS O. OCHOA PINEDA
P1803462 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1001 NEW JERSEY AV SE   12/28/17
$ 687,365
WHATS ON SECOND PROPERTIES LLC
 


Project Directory
Completed
Agora ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.