Since January, 2003
            
 (a random before-and-after moment)
July 12, 2015
October 16, 2016
4th at Virginia, Looking North (see more)

While most residents and observers have been eyeing DC Water's operations site at 1st and O Streets, SE and wondering when Forest City's movie theater/residential/retail project is going to get underway, details are now emerging on the other shiny new development in the works in that same general area: DC Water's plans to build a new headquarters building on top of the existing O Street Pumping Station just east of Nats Park.
(NO, NOT ON TOP OF THE HISTORIC MAIN PUMPING STATION.)
A PUD application has now been filed with the Zoning Commission for the project, to be design/built by Skanska with architect SmithGroupJJR as a "world-class headquarters that integrates efficient building systems with the [existing O Street Pumping Station] to create a dynamic workplace environment" that would be " a bold, innovative statement on the Anacostia River shoreline that reflects DC Water's mission to provide reliable and cost-effective water and wastewater services."
It would be designed as a LEED Platinum building, with stormwater retention, "heat recover and rejection systems" that will use the residual heat from the sewage that is pumped to Blue Plains, and low-impact development landscaping features by OvS "such as bio-swales, pervious pavements, and native vegetation."
The proposed DC Water HQ, as seen from the Anacostia (left), the west looking east (center), and from the Yards Park looking west (right). Renderings from zoning filings. Click to enlarge; and compare to the current view from the river.
The O Street station would keep right on pumping during and after construction, and the HQ design, which encapsulates the pumping station on the south and east and so removes it from view from the river, will include a four-story 190-foot-long east-west truss that will support the new HQ without bearing on the existing pumping station.
As for the PUD itself, it proposes to rezone the site from W-2 to CG/CR, and to only include 21 parking spaces instead of the mandated 69 (yay, nearby transit!).
It also requests flexibility from public space requirements because the building is "deemed essential to supporting the United States government," and so it must "therefore incorporate certain security measures and access restrictions, which impact operation and design of the new building and surrounding area." Here is DC Water's memo on this security topic.
This new headquarters will consolidate and relocate all of the agency's administrative personnel, and get non-essential types away from its currently overcapacity Blue Plains site.
The zoning filing says that this new building "will demonstrate that DC Water's mission is essential to every living organism," and will also "emphasize DC Water's historic role in serving the DC metropolitan area for over a century by providing scheduled educational programming inside the building."
Forest City's planned movie theater would be one block to the north of this site, with the two planned new residential buildings to its west, and a new "1 1/2 Street" would run just to its west (as seen in the left-most rendering of the group of three above).
This will come before ANC 6D for its support before getting to the Zoning Commission on some as-yet unannounced date in the future.
Comments (8)
   
 
 More About DC Water (WASA)
 All posts: DC Water (WASA), zoning

JDLand.com Home

Comments

Daedam says: (6/8/15 5:31 PM)
Wow, I think it's incredible! Bravo to DC Water for proposing a visually interesting, unique, LEED Platinum building that would enhance the riverfront and hide the O Street Pumping Station from view.


202_cyclist says: (6/8/15 6:31 PM)
The building looks great but how many employees does DC Water have? I didn't realize they have enough employees to require such a large building.

Also, I hope DC Water leads by example and minimizes the amount of impervious pavement on the site-- reducing runoff.


BillP says: (6/8/15 7:17 PM)
Tell them to get started immediately!

Adding a corporate HQ is great for the neighborhood. 1,100 total employees so probably at least 350-400 at the new building. Total revenues were $475 million in 2014, roughly the size of a Fortune 1000 company.

Great news, great design and great to have a new building in the pipeline that isn't an apartment building or mid priced hotel chain.


conngs0 says: (6/9/15 10:23 AM)
Totally agree. Huge upgrade over the current state of affairs on the site. Plus the added bonus of clearing the way for the movie theater. I also love the contrast of the modern-looking building next to the historic pumping station. It's probably not as exciting as apartments/condos/hotels (with ground floor retail), but I think the added diversity of projects is a good thing. Hopefully the zoning commission and ANC 6D folks are pleased with the plans and they can get moving on this project soon.


JD says: (6/9/15 11:45 AM)
Meanwhile, nearby, a construction cam for Dock 79:

link

Just about to come out of the ground....


Jaybird says: (6/10/15 6:22 AM)
Looks great, a great synergy of old and new.

Trying to think of anywhere else in our area, where modern new was added on to historic old...



E. Masquinongy says: (6/10/15 3:29 PM)
Gotta say, the existing pumping station is aggressively plain. The new building will sure spice things up.


JHUGrad says: (6/24/15 2:55 PM)
Looks like Showplace Icon is coming to Tyson's Corner. DC needs to get on the ball and get the Showplace Icon project started here in the Capitol Riverfront.

link

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

CJBabyDaddy on A Final Skeletons-and-Holes-and-Fences: Nothing gets me in the holiday spirit more than JD’s posting of the final SH&am...
RMP on A Final Skeletons-and-Holes-and-Fences: Thanks for the update, JD! I actually LOL'd at the rendering on the Avidian we...
202_cyclist on A Final Skeletons-and-Holes-and-Fences: Thank you for this update. I am glad to see you survived the DC blizzard, the m...
conngs0 on A First Peek/One: I agree, malatesta. No problems with businesses selling to folks who are willin...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/08/17
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/08/17
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 12/03/17
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/02/17
500 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/02/17
1100 5TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/01/17
400 B/O M ST SE   THEFT
Shoplifting
 11/29/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/27/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/17
1200 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 11/24/17
400 B/O M ST SE   THEFT
Shoplifting
 11/22/17
100 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 11/19/17
70 B/O I ST SE   BURGLARY
Burglary Two
 11/16/17
1200 HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/15/17
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/14/17
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/13/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 11/12/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/17

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/29/17 
DC WATER / DAVE LEVINE
AH1800282 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water. Corman Construction 301-343-5417
1331 4TH ST SE   
11/14/17 
FC 1331 LLC / PAUL E WARREN
E1801475 / SUPPLEMENTAL
2 I ST SE   
11/29/17 
MCDONALDS CORPORATION / MICHAEL ERIC CAMPBELL
M1800603 / SUPPLEMENTAL
   
11/29/17 
MCDONALDS CORPORATION / DANIEL P. THOMPSON
P1801598 / SUPPLEMENTAL
   
12/01/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800280 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
70 I ST SE   
11/28/17 
DISTRICT OF COLUMBIA / OTIS ELEVATOR COMPANY; OTIS ELEVATOR COMPANY
ER1800447 / SHOP DRAWING
BODY OF WORK: Replace machine and recable elevator # 1.
337 L ST SE   
12/06/17 
JENNIFER LANCASTER / null
E1802092 / SUPPLEMENTAL
347 L ST SE   
12/07/17 
THOMAS PAQUIN / null
E1802129 / SUPPLEMENTAL
555 L ST SE   
11/27/17 
UNITED STATES OF AMERICA / CLIFFORD DIXON
B1714199 / CONSTRUCTION
DGS PROJECT This permit is for interior work only.SWING SPACE FOR WARD 6 CLINIC TO EXISTING VACANT JOY EVANS RECREATION CENTER TEMPORARILY FOR 12 TO 18 MONTHS
100 M ST SE   
12/05/17 
CRANE SERVICE CO / CHRISTINE LONG
AH1800304 / CONSTRUCTION
An after hours permit is respectfully requested from 7AM Saturday thru 7PM Sunday
410 M ST SE   
11/20/17 
DC HOUSING / COLLINS ELEVATOR SERVICES INC.; COLLINS ELEVATOR SERVICES INC.
ER1800511 / SHOP DRAWING
BODY OF WORK: 1. Remove old piston. Replace & install jack on car # 1.
861 NEW JERSEY AVE SE   
11/17/17 
CSX TRANSPORTATION, INC. / NA CSX TRANSPORTATION, INC.
AH1800246 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1100 NEW JERSEY AVE SE 3RD FL   
11/22/17 
SQUARE 742 LLC / null
P1801490 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/17/17 
SQUARE 742 LLC / null
E1801616 / SUPPLEMENTAL
   
11/20/17 
SQUARE 742 LLC / null
P1801410 / SUPPLEMENTAL
   
12/06/17 
SQUARE 742 LLC / DOMINIC E TOTARO
M1800664 / SUPPLEMENTAL
   
12/08/17 
SQUARE 742 LLC / SAM HOLLEN
B1801219 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. 25,226 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY **LEVEL 2 ALTERATION
125 O ST SE   
11/17/17 
DISTRICT OF COLUMBIA / THEODORE D. LYNCH
M1800466 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.