Since January, 2003
            
 Page Through from Before to After

With a May 28 Capitol Gateway Overlay design review on the calendar, the Jair Lynch/Half Street Hole project has within the past few days submitted additional materials to the Zoning Commission. And since I know how much everyone loves renderings....
The one I know will be of most interest is above left, showing what the new skyline would look like just to the northeast of Nats Park as seen from home plate, where Lynch's planned residential project will be situated. (They seemed to have tried to go for some sort of tilt-shift look, so it's not your eyes or my image file that's blurry, it's the original.) At right is a sharper/snazzier view of the building as seen from ground-level at Half and N, with the glass-walled corner portion of the planned 60,000-plus square feet of retail space a definite focal point. The darker façade facing N Street delineates the planned condo portion of the project from the rental units (and possibly a hotel, or possibly not) around the corner on Half.
I wrote in detail about the plans for the site a few weeks ago, or you can check my Lynch Half project page for additional details.
Meanwhile, in other Ballpark District 2.0 news, I see an indication of forward progress on JBG's planned 290-unit residential project just north of the ballpark at 1244 South Capitol: an application was filed last week for a shoring/sheeting/excavation permit (got to dig down before you can build up!). The company has said they are looking to begin construction in late 2015 or early 2016.
Comments (8)
   
 
 More About Development News

JDLand.com Home

Comments

Section314 says: (5/18/15 6:10 PM)
How long does it usually take for a permit from application to approval if it is a big one like this one for shoring and excavation?


JD says: (5/18/15 6:12 PM)
It can take a few months, or it can take more than a few months.

Then there's the foundation-to-grade permit, and then the actual building permit.

If a late 2015 start is being eyed, this is not "too early," that's for sure.


conngs0 says: (5/18/15 9:36 PM)
Another round of bbq rumors! If Hill Country has committed to leaving the National Building Museum though, perhaps this rumor has legs...?

link


202_cyclist says: (5/18/15 10:28 PM)
Conngs0-- King Ribs in Siuthwest, across from Arena Stage, is without question the best BBQ in the immediate area.


202_cyclist says: (5/18/15 10:31 PM)
Hopefully one day the Public Storage building next to 1244 So. Cspitol St will be redeveloped.


conngs0 says: (5/19/15 9:18 AM)
I've heard King Ribs is awesome and can't wait to get over there to give it a try! In the meantime, I'm excited about the possibility of strolling over to will hopefully be a decent outdoor bbq venue in the immediate vicinity (if it happens) to complement what I consider to be a fairly underrated contribution from Willie's.


Jaybird says: (5/19/15 10:13 AM)
Interesting that the image on the upper left is a batting practice scene.

At first, I thought, why show all the empty seats???


ttassa says: (5/22/15 12:38 PM)
Hoping there is more of an iconic look to this building once it is built. In some ways, because of its view from homeplate and the activity it's going to inspire, it may be one of the most important buildings in this area. Right now, it doesn't look much different than other new developments in DC. Only so much you can do without height, I guess.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Hallo, Douglass Bridge: Yes, he's working pretty hard these days.
202_cyclist on Hallo, Douglass Bridge: JD— fantastic reporting by your brother! The continuation of our democracy depe...
JD on Wednesday Tidbits: I knew this was coming. We'll do something at Anchovy Social when the weather is...
202_cyclist on Wednesday Tidbits: JD-- with all of these new neighbors wanting to meet, I remember it has been a l...
EnvySquared on Wednesday Tidbits: Stopped in at the Thompson bar tonight and was told that Anchovy Social's offici...
JES on Wednesday Tidbits: Ventured up to Shaw tonight for the grand opening of Emmy Squared to check it ou...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/14/20
1100 B/O 1ST ST SE   BURGLARY
Burglary One
 01/12/20
100 B/O L ST SE   ROBBERY  01/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/08/20
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/06/20
40 N ST SE   ROBBERY  01/05/20
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/03/20
139 N ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/02/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/02/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/31/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/30/19
UNIT B/O M ST SE   BURGLARY
Burglary Two
 12/30/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/29/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
700 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/28/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/27/19
300 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/27/19
1220 HALF ST SE   BURGLARY
Burglary Two
 12/27/19
300 B/O WATER ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/19
900 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 12/25/19
2 I ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/24/19
2 I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/23/19
UNIT B/O POTOMAC AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/22/19
400 B/O M ST SE   THEFT
Shoplifting
 12/21/19
1100 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 12/21/19
250 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/18/19

Recent Issued Building Permits Archive  
909 4TH ST SE   
12/30/19 
MEREDITH FASCETT / KYLE YOST
SOL2000550 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
1300 4TH ST SE 912   
01/07/20 
DEBORAH J ISRAEL / DORIS A MINOR; DORIS A MINOR
B2003615 / CONSTRUCTION
REPLACE KITCHEN CABINETS
900 5TH ST SE   
01/10/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM ANDERSON; WILLIAM ANDERSON
P2002846 / SUPPLEMENTAL
415 I ST SE   
01/10/20 
MEGHAN E RILEY / DAEHO PARK; DAEHO PARK
P2002836 / SUPPLEMENTAL
300 M ST SE   
01/03/20 
FEDERAL CENTER LP / null
E2003217 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
12/31/19 
CONSOLIDATED RAIL CORPQ / null
E2003162 / SUPPLEMENTAL
   
12/31/19 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000399 / CONSTRUCTION
Pepco will be splicing cable at 861 New Jersey Avenue, SE, from 9PM to 7AM, Monday thru Friday.
   
01/03/20 
CSX TRANSPORTATION INC / SUSANA VAZQUEZ; JOHN MORIARTY & ASSOCIATES OF VIRGINIA LLC
TC2000014 / CONSTRUCTION
Tower Crane
1100 NEW JERSEY AVE SE 1ST FL   
01/06/20 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2003296 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
12/30/19 
SQUARE 742 LLC / RYAN FITZGERALD; NEXIUS SOLUTIONS, INC.
AN2000023 / CONSTRUCTION
AT&T proposes to replace (3) existing antennas with (3) new antennas and install (3) new antennas.
   
01/02/20 
SQUARE 742 LLC C/O WCSMITH / PATRICIA J STAUB; CDH CONSTRUCTION INC
B2001972 / CONSTRUCTION
Provide Landlord Work (warm white shell) for Tenant buildout of 1827 SF.
   
01/07/20 
SQUARE 742 LLC / ;
P2002715 / SUPPLEMENTAL
   
01/08/20 
SQUARE 742 LLC / null
P2002765 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
01/03/20 
MILLER AND LONG / WILLIAM MOORE; MILLER LONG
TC2000016 / CONSTRUCTION
towercrane for jobsite use 1 / 25 / 2020 to 1 / 25 / 2021
355 WATER ST SE   
12/30/19 
UNITED STATES OF AMERICA / KELSI EVANS
TN2000035 / CONSTRUCTION
1 40' x 80 tent
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.