Since January, 2003
            
 Sliding from Before to After

New renderings have been passed along today of the apartment building in the early stages of construction on the northwest corner of New Jersey and I Streets, currently known in the parlance as 82 I Street:
(Of course, that lush green field just across New Jersey is architectural license, since we know that space is not now, nor has it likely ever been, a grassy expanse. Instead, this building will be facing the Park Chelsea and 800 New Jersey apartment buildings, as well as the Whole Foods scheduled to go in on the ground floor of the latter.)
It's now confirmed that the building will have about 5,500 square feet of ground-floor retail (making a certain someone so very excited!), and the new drawings give a clearer view of the ground-floor spaces.
UPDATE, 5/5: With word of a ceremonial groundbreaking at the site today, within which the site is referred to as being at 801 New Jersey, I am going to make an executive decision and dispense with the 82 I stuff going forward. So say hello to 801 New Jersey!
Comments (33)
   
 
 More About Development News
 All posts: 801nj, Development News

JDLand.com Home

Comments

JD says: (5/4/15 4:16 PM)
In other news (not in the mood to put up a separate post right now), the denial of the anti-tunnel injunction is being appealed:

link



Alan says: (5/4/15 4:28 PM)
I do hope Greystar manages that building and its residents much better than when they were in charge of 70/100/909.


202_cyclist says: (5/4/15 4:56 PM)
Are there any plans for the little slip lane between 82 I St and 70 Capitol Yards? I think CSX is using it now to access their construction but a small pocket park might be nice (if the lot is too small to develop) once the two other surface lots across the street are built.


JD says: (5/4/15 5:07 PM)
That's part of CSX's huge expanse of land back there. So, if you imagine them selling it or developing it themselves....


groggy23 says: (5/4/15 5:52 PM)
I thought that little strip was one of the main accesses to CSX? Do we know the expected pricing (estimated) of 82 I St?


JD says: (5/4/15 5:54 PM)
Don't know anything about pricing, still way too early.


ZoolanderANDtheBoYz says: (5/4/15 7:42 PM)
82 I is on steroid. I just checked it today and the whole is way deep. They are building really fast. 1111 New Jersey seems going very slow.


Maelstrom says: (5/5/15 6:47 AM)
I wonder why the addresses are out of sequence. That has never sat right with me hearing about 82 I


ZoolanderANDtheBoYz says: (5/5/15 7:03 AM)
@ Malestrom...I brought this long time ago. Addresses are sequenced by add and even numbers. I think they will eventually change it. 70, 100, 82 just does not make any sense. But, this is DC - half of DC government employee barely have a high school diploma.


Alan says: (5/5/15 8:54 AM)
@ZoolanderANDtheBoYz Please go away. While everybody in the JDLand playground is getting along, you're always the petulant little brat running around kicking sand in people's eyes and pushing kids off the slide. I don't think anyone wants you around anymore. Take your--or more likely--some other kid's ball and go home.


JD says: (5/5/15 9:00 AM)
As I've tried to explain before, but no one listens, it's very likely that there was once a much larger plot of land correctly addressed as 82 I--but pieces kept getting sold off, but likely with the original owner holding onto the far western part, which in tax parcel world would have continued to keep the original address.

I assume they will announce a real name at some point, and probably an address of 801 New Jersey.


BLT says: (5/5/15 10:51 AM)
@zoo...before you start throwing out ignorant comments about the education levels of certain folks maybe you should learn the difference between 'whole' and 'hole' or better yet take a grammar class. Just sayin'.


JD says: (5/5/15 11:01 AM)
Okay, Mom is going to jump in here and head all this off at the pass. Let's keep things fun on the playground. :)




ZoolanderANDtheBoYz says: (5/5/15 11:35 AM)
@Alan why don't you go away. Stop being a bully.

@BLT you got me there. I will re-check my grammar and go to grammar school. I am sure your anger is fueled by your unhappiness with your mediocre DC government job.. Just sayin' bro


JD says: (5/5/15 11:36 AM)
Zoo. Stop. Warning #1 of 1.


Edna says: (5/5/15 11:47 AM)
DC gov't employee here. With a master's degree. Don't appreciate stereotypical and ignorant comments.


BLT says: (5/5/15 12:26 PM)
Haha. I run a very successful, private healthcare company. People who live in glass houses should not cast stones. Got it?


BLT says: (5/5/15 12:27 PM)
Sorry JD. I am finished. :)


JD says: (5/5/15 12:30 PM)
The Picard .gif is going to come out pretty soon....



ZoolanderANDtheBoYz says: (5/5/15 12:36 PM)
@JD - you are just intolerant and you hate when people express their opinion. Hold on, you work for Washington post and supposedly you are a journalist?? You dictate your blog as in blog in Iran.

Take this as a second and final warning. You are not a journalist and you are bully and your shit website sucks.

**


JD says: (5/5/15 12:45 PM)
At least you went out with guns blazing, Zoo. See you later.



ValveetaChz says: (5/5/15 12:59 PM)
Thank goodness that jerk is gone. No need to bring such negativity to this awesome blog. JD, you do a great job and have a loyal followers who appreciate your work. Thanks a bunch and keep it up!!!


BoomerSooner says: (5/5/15 12:59 PM)
For someone who claims that the website “sucks” he sure did have a lot of worthless commentary to add to your posts. Thanks for everything you do JD, and for getting rid of that troll. I love the website and read everyday!


JD says: (5/5/15 2:24 PM)
And I guess none of us got invited to this today, or at least I didn't:

link

WASHINGTON, DC—Greystar and Ivanhoé Cambridge are holding a ceremonial ground breaking ceremony at 801 New Jersey Ave., SE, on Tuesday afternoon at 4:30 pm.

The new development will feature 227 apartment homes and 5,774 square feet of retail space available for lease. The project is being built with eco-friendly materials and amenities that will appeal to a wide range of residents, according to Brandon Henry, managing director of Development for Greystar. It is being designed to LEED Silver USGBC standards.

The apartments will include studios, one- and two-bedroom units ranging from 537 to 1,357 square feet.

Construction is expected to be completed in summer 2016.


MJM says: (5/5/15 5:34 PM)
Mom at least you didn't say "do that one more time and I'm taking away your _____" I like the warning #1 of 1.

I think you might get an invite to 82 I St....maybe 801 NJ Ave is for another place being built.....


Maelstrom says: (5/5/15 10:04 PM)
Wow. Zoo was around since before I moved out of D.C. a year and a half ago. I come back to post on something I honestly forgot about (I think I do remember the 801 NJ thing now) and he gets booted. I guess I just bring out the crazy in people. :P


conngs0 says: (5/5/15 10:38 PM)
Whatever the address, I'm interested to see if they complete the construction in one year. That's a pretty impressive timeline, no?


JD says: (5/5/15 10:43 PM)
"Summer" could mean all the way up to Sept. 2016, but that would still only be 18 months. It's not a big building, but I'll still be impressed if they meet that date.


JES says: (5/6/15 3:19 PM)
Speaking of building construction speed, wtf is going on with 1111 NJ? They were in the ground well before, say, Florida Rock and Florida Rock has beaten them to the "tower crane" phase.


JD says: (5/6/15 3:22 PM)
I imagine all that bracing they've had to do has had a lot to do with it.


JD says: (5/6/15 4:03 PM)
Also remember that Florida Rock only went down two levels. All others currently under construction are going down three levels.


kevin says: (5/17/15 12:49 AM)
JD: I reviewed the renderings of 82 I Street again. The specs have an even sidewalk running all the way up NJ Avenue. As you know, if you walk by this today the construction company seems to have taken a good five feet more than want is portrayed in the drawing. The sidewalk now jets out into the street. Is this temporary? I'm not sure how it could be as the steal girders are positioned out of the ground in the middle of the old sidewalk. What are your hearing? Thanks.


JD says: (5/17/15 8:32 AM)
Hi, Kevin. Yes, it's temporary. The building's garage/parking spaces are being built under what was and will again be the sidewalk (I think it's called the vault space?).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on CSX East Three-Building: Many unexecuted plans have the advantage of being perfect in someone‘s eyes, and...
rdotis on CSX East Three-Building: Carroll Creek Park, Frederick, MD: https://www.flickr.com/photos/22711505@N05/28...
rdotis on CSX East Three-Building: The failure to take advantage of the location of the historic Washington Canal (...
Westnorth on CSX East Three-Building: All I can see on that site plan is the word "HII"
conngs0 on CSX East Three-Building: Thanks for the updates, JD! It's tough to tell with an untrained eye (mine!) ho...
FedInExile on West Half Now: as regards Union Kitchen Grocery....You had me at "Cookie" ! The cook...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
08/20/19 
YAAN REAL ESTATE LP / MITCH A. PERMUY; MITCH A. PERMUY
E1910356 / SUPPLEMENTAL
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
150 I ST SE   
08/20/19 
null
E1910665 / SUPPLEMENTAL
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
419 K ST SE   
08/21/19 
FAROOQ A MITHA / null
E1910733 / SUPPLEMENTAL
100 M ST SE 20003   
08/21/19 
PARSONS / null
E1910735 / SUPPLEMENTAL
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1275 NEW JERSEY AVE SE   
08/20/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW; JUSTIN BELLOW; TBD
BCIV1900130 / CONSTRUCTION
Civil permit for grading, site demo, and installation of sediment erosion control measures Site utilities, provide property. Stormwater management will be under subsequent permits.
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.