Since January, 2003
            
 (a random before-and-after moment)
August 6, 2005
June 16, 2018
1st at N, Looking West (see more)

A Friday afternoon post over at City Paper's Young and Hungry site broke the news of a liquor license application for a "multipurpose facility" by the name of District Winery, saying that it would have "450 seats (with a total capacity for 750) plus dancing, a 100-seat summer garden, and a wine pub."
And that it would be at 385 Water St., SE.
Which is pretty cool news, except that right now there is no building with an address of 385 Water St., SE.
There were theories that it would be the first hint of retail leasing in the under-construction Arris, which is indeed in the 300 block of Water, but is on the north side of the street and so would have to be an even-numbered address.
The Lumber Shed is 301 Water--if all of the retail spaces in that building weren't spoken for, the notion of just a fat-fingering of the address could have been assumed.
But, 385 Water... Hmmm....
Many of you may not have been around back in 2009 when Forest City received approvals for its plans for Phase 2 of the Yards Park. This included approving the remaking of the Lumber Shed as a glass-enclosed retail pavilion--and also included the plans for two additional retail pavilions on what is now open lawn space between the Shed and 4th Street SE.
The drawings you see here are from 2009 and have actually been on my Yards Park and Lumber Shed pages since then--they show various views of all three pavilions, including a view from a deck on the easternmost pavilion looking toward the west with the Shed and other pavilion visible. (Click to embiggen.)
The larger, eastern pavilion, dubbed P2B (because this is Parcel P) would have a footprint of about 10,300 square feet, while the smaller middle one's footprint would be about 6,300 square feet. Each of them would be less than 40 feet high and would have "open roof terraces on the second story for outdoor dining." And, as the drawings show, they would have much the same glass-and-concrete look as the Lumber Shed does.
And it could certainly be possible that the larger eastern one could have an address of 385 Water Street. And it looks sizeable enough for a venture looking for 450 seats with capacity for 750, plus dancing.
Forest City, as always, makes no comment on tenant-related information when there is no signed lease. And so it's also interesting that District Winery (which City Paper says appears to be from the same folks behind the Brooklyn Winery in New York) has made the move to apply for a liquor license before any lease has been signed.
We Shall See on all of this, including what any potential timeline might be for the construction of one or both of these new pavilions, but at least it means there would appear to be some definite leasing interest for these spaces. Either that or I am terribly off base with all this pondering.
UPDATE: All that pondering, and I could have just read that yes, it is indeed a new building being planned."Plans are still in the early stages, putting an opening at least two years away[.]" (h/t @JES)
Comments (15)
   
 
 More About Yards Park

JDLand.com Home

Comments

JES says: (5/2/15 3:58 PM)
Looks like we're 2 years out at best :-(

link


ZoolanderANDtheBoYz says: (5/2/15 4:31 PM)
I guess instead of building two buildings. They will end up building one big building that can accommodate 15K square foot.


JD says: (5/2/15 4:32 PM)
Not necessarily. Note that I said "footprint" square footage, which didn't account for two floors or should be considered equal to total available retail square footage per building.


JES says: (5/3/15 4:30 PM)
I'm wondering if they'll go with the same kind of modern glass exterior of the lumber shed, or if they'll go with something more rustic, given the use. Time will tell I guess.


Westnorth says: (5/4/15 2:24 PM)
And cue the complaints about "them" paving over "our" precious parks... If I were Forest City, I would have left the site as a gravel lot or maybe seeded it with tallgrass prairie (nice to look at, uninviting to walk upon, mowable for occasional special events).

Interesting question about the facade. Retailers don't get many chances to do a build-to-suit in the city, so I'd expect a well-capitalized operation to seize the chance. Anyhow, this operation's a great match for the space!


JD says: (5/4/15 2:27 PM)
I am not sure how much they can change the design of the new pavilions without sparking a new zoning review. (not saying that would prevent it, just pondering that the Lumber Shed-like designs already have approvals)


JD says: (5/4/15 2:54 PM)
Any of you out there work for USDA? Was there a link to my site in some sort of internal communication today? I'm showing a massive bump of hits from USDA this morning.


MJM says: (5/4/15 4:21 PM)
Perhaps the USDA loves the wine industry? link


JD says: (5/4/15 4:27 PM)
LOL. Actually, after further research it appears to be a rogue machine somewhere in USDA, one that hit my home page close to 700 times this morning.

The fact that it didn't crash the site at least makes me think well of the new server!



JD says: (5/4/15 4:28 PM)
And to the person that wrote me in reference to this, I tried to reply, but you must have typo'ed your e-mail address. But the gist of my reply was don't worry, it won't be counting against you. :)


JD says: (5/5/15 9:07 AM)
Copying from another thread, the overhead Yards Park rendering also gives another view of the pavilions and gives a sense of their footprints:

link



JD says: (5/5/15 10:00 AM)
Sorry, fixing the link:

link



MJM says: (5/5/15 5:35 PM)
Did those 700 hits generate enough clicks/ads to make you a millionaire?


JacquesOfAllTrades says: (5/6/15 11:40 AM)
So it looks like not much of the current Yards Park footprint (if any) is taken up by the new buildings. Just some of the Yards Park-ing Lot.


JD says: (5/6/15 11:51 AM)
(Jacques, I moved your comment to this post.)

The two buildings would be between the Lumber Shed and the 4th Street parking lot. There's currently a big grassy area there (actually, two of them). The two buildings won't take up the entire lawn, but look at this shot to see where I'm talking about.

link

Also look at the last photo above in the post, where you can see two different areas of grass.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

snakegriffin on Peet's Grand Opening: @Ampersand: You are 100% correct, it is still the best grocery store with proxim...
Ampersand on Peet's Grand Opening: Besides the sometimes insanely long lines, I’ve never really understood the Navy...
202_cyclist on Peet's Grand Opening: @Dude— I suppose being disappointed in August will save us from the annual Octob...
RMP on Peet's Grand Opening: At least we now have Jayson Werth Day to look forward to. https://twitter.com/Na...
dude on Peet's Grand Opening: Two nights in a row! 7 back and I’m finally starting to give up on them, but ma...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18
200 B/O I ST SE   ROBBERY  07/17/18

Recent Issued Building Permits Archive  
1100 1ST ST SE   
07/19/18 
ONYX ACQUISITION LLC / BAKER DC LLC
TC1800039 / CONSTRUCTION
Permit to erect tower crane on private property
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
200 K ST SE   
07/19/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / XIOMARA A VARGAS APONTE
TN1800154 / CONSTRUCTION
The International Colombian Festival at Canal Park. We are placing 8x8 fences (560 feet total). 2 tents 20 x20, 1 tent 10x30 20x16x3 plus a catwalk 8x8 65 KW
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.