Since January, 2003
            
 (a random before-and-after moment)
September 19, 2004
June 10, 2012
3rd Place at K, Looking North-Northeast (see more)

Word is hitting the streets this morning that Akridge has now sold its remaining holdings on the west side of Half Street just north of Nats Park, ending an ownership that began in 2008 but that saw the Fairgrounds as its only development.
Back in February, Akridge sold the southern two-thirds of the block-long lot to JBG, and at the time it was said that the company was also "under contract to recapitalize the northern third of Half Street." It turns out that that "recapitalization" was a sale to an affiliate of Brandywine Realty Trust for $20 million, according to WBJ.
Akridge's arrival on this lot began back in 2007 when the company won a WMATA bidding process for what was then the Southeastern Bus Garage site. But Monument Realty, expecting to have the rights to develop the site, was quite unhappy, and sued, which resulted in the settlement that awarded the bus garage site to Akridge for $46.5 million and the adjacent Metro parking lot across Van to Monument for $22.6 million. Monument then sold its holdings on the south end of the bus garage block to Akridge for $9.66 million.
The company got zoning approvals in early 2009 for its Half Street plans, as a 700,000-square-foot mix of two office buildings, one residential building, and 56,000 square feet of retail. But, of course, none of that ever happened, and in the meantime Akridge provided the space for first The Bullpen, then Das Bullpen, then the block-long Fairgrounds site.
Now we wait to see what the plans for the north end will be, now that JBG has said it will be building two residential offerings on its portion near the ballpark.
(And I know the web site response is atrocious this morning. Guess I'm going to have to stop just wishing it will get better, though the support people tell me that a lot of this is supposedly now the fault of another site on the same server, which has two more days to clean up its act or else it'll be shut down. We Shall See.)
Comments (14)
   
 
 More About West Half St.

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (4/13/15 11:10 AM)
"Monument first acquired the lots in Square 700 between Half and Van streets in 2005, three years before Nationals Park opened to fans, for a combined $6.96 million. In August 2008, Monument sold those lots to Akridge for $9.66 million. And now, seven years after acquiring them, Akridge has dispatched those parcels to JBG and Brandywine, in separate deals, for a total of $65 million.
It amounts to an 834 percent increase in value over the course of a decade, reflecting the meteoric growth of the Capitol Riverfront community, between South Capitol Street and the Navy Yard. The blocks immediately surrounding Nats Park are simply exploding with development, and much more is to come in short order."

I know you corrected the permit guy from Washington Business Journal on twitter. But, he still has not corrected it.


ZoolanderANDtheBoYz says: (4/13/15 11:11 AM)
21 million in profit is a healthy and lucrative return for Akridge.


JD says: (4/13/15 11:30 AM)
WBJ's story is corrected now.


ZoolanderANDtheBoYz says: (4/13/15 12:25 PM)
*Correction - Akridge profit is roughly around 9 million not 21 million. Still that is a good return.


Andrew in DC says: (4/13/15 7:36 PM)
@ZoolanderANDtheBoYz 9 million on $56 million invested in 2009 is not a good return. It's not even 20%.

By comparison, you could have put all $56 million in the S&P 500 on the day they closed the deal on Sept 3rd, 2008 and made 63.13% - a return of a cool 32M ... and that was before the market crashed from Oct-March.

Akridge is just happy to get away from this deal with its head intact. This is a huge loss for them. Their investors should be pissed.


ZoolanderANDtheBoYz says: (4/13/15 9:12 PM)
@Andrew, I didn't know Akridge is publicly traded company.


Andrew in DC says: (4/13/15 9:46 PM)
@Zoo they aren't - but that doesn't mean they don't have investors:

link


Scott says: (4/14/15 4:33 PM)
How much do you normalize finance with debt in a commercial deal? I doubt any of these properties are purchased with all cash, so the return of $9 million is not on $56 million, but on whatever you had invested. That's the power of leverage.

So if it was financed 20% with cash in 2008 - or $11.2 million - and you returned $9 million in 2015, that's higher than what you would have made investing the same $9 million in the S&P 500 at the same point in time.

Of course, we probably have no idea what their actual numbers are, either how much they financed in cash, nor their expenses over time that would lead to a real ROI.


Scott says: (4/14/15 4:34 PM)
*normally*


202_cyclist says: (4/15/15 11:10 AM)
Was part of Akridge's motivation in selling the Half St property to get more funding to finance its massive and ambitious Burnham Pl development ( link


ZoolanderANDtheBoYz says: (4/15/15 11:15 AM)
Damn @202, I was about to ask the same question with the same link. 8.5 billion for the next 20 years is a big bet.


JD says: (4/15/15 12:23 PM)
Not really on this subject, but I saw a Michael Stevens quote somewhere recently that talked about the neighborhood now being at the halfway point of its build-out. It kind of startled me that that's about right. And once you get all this Half Street/South Capitol/1st Street stuff underway, it's really just the later phases of The Yards, Florida Rock, and a smattering of potential projects north of M/west of 3rd left to go.

(I know that doesn't make it sound like there's that little left to go, but in comparison to what's been done....)


202_cyclist says: (4/15/15 2:22 PM)
"Not really on this subject, but I saw a Michael Stevens quote somewhere recently that talked about the neighborhood now being at the halfway point of its build-out. It kind of startled me that that's about right. And once you get all this Half Street/South Capitol/1st Street stuff underway, it's really just the later phases of The Yards, Florida Rock, and a smattering of potential projects north of M/west of 3rd left to go."

Maybe CSX will sell some of the huge amount of land it owns next to 70 and 100 I Street after the VA Ave tunnel construction. Residential would be difficult here b/c it is right next the highway but I don't see any reason additional office buildings can't be constructed there. There is also the lot immediately north of McDonalds, as well as the McDonald's property. Additionally, as mentioned in my comment for the marine barrack's post, almost all of the lower 8th Street corridor is still undeveloped-- I don't know if that is considred Navy Yard/Capitol Riverfront, however.


JD says: (4/15/15 7:13 PM)
Lower 8th is within the BID boundaries, although at one of the 2010 barracks meetings Michael Stevens said that if the Marines take any of the private land over there, he will advise the BID board to shrink the boundaries to not include any new Marine facility. Probably spoken in the heat of the moment, but still an indicator of the feeling that any new installation along 8th would perhaps not be considered a net positive from a business standpoint.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

NavyYardGuy on Peet's Coffee Coming: @ JD..was that a hint..like Compass coffee is coming to Navy Yard too?
Ampersand on DDOT Unveils Planned: aaaaaaand now that I've posted that I see exactly such a route would also be cre...
JD on DDOT Unveils Planned: (That includes Eastern Market.)
JD on DDOT Unveils Planned: "Circulator service between Union Station, Barracks Row, and the Washington Navy...
Ampersand on DDOT Unveils Planned: As much as I like the idea of a Circulator that goes all the way to Union Statio...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/12/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/11/17
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/08/17
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/08/17
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 12/03/17
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/02/17
500 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/02/17
1100 5TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/01/17
400 B/O M ST SE   THEFT
Shoplifting
 11/29/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/27/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/17
1200 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 11/24/17
400 B/O M ST SE   THEFT
Shoplifting
 11/22/17
100 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 11/19/17
70 B/O I ST SE   BURGLARY
Burglary Two
 11/16/17
1200 HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/15/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/13/17 
BAKER DC / CHRISTINE LONG
AH1800290 / CONSTRUCTION
An after hours permit is respectfully requested from 5am thru 9pm daily
1331 2ND ST SE   
11/29/17 
DC WATER / DAVE LEVINE
AH1800282 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water. Corman Construction 301-343-5417
2 I ST SE   
11/29/17 
MCDONALDS CORPORATION / MICHAEL ERIC CAMPBELL
M1800603 / SUPPLEMENTAL
   
11/29/17 
MCDONALDS CORPORATION / DANIEL P. THOMPSON
P1801598 / SUPPLEMENTAL
   
12/01/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800280 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
70 I ST SE   
11/28/17 
DISTRICT OF COLUMBIA / OTIS ELEVATOR COMPANY; OTIS ELEVATOR COMPANY
ER1800447 / SHOP DRAWING
BODY OF WORK: Replace machine and recable elevator # 1.
337 L ST SE   
12/06/17 
JENNIFER LANCASTER / null
E1802092 / SUPPLEMENTAL
347 L ST SE   
12/07/17 
THOMAS PAQUIN / null
E1802129 / SUPPLEMENTAL
555 L ST SE   
11/27/17 
UNITED STATES OF AMERICA / CLIFFORD DIXON
B1714199 / CONSTRUCTION
DGS PROJECT This permit is for interior work only.SWING SPACE FOR WARD 6 CLINIC TO EXISTING VACANT JOY EVANS RECREATION CENTER TEMPORARILY FOR 12 TO 18 MONTHS
515 M ST SE   
12/11/17 
null / BLUE STAR DESIGN BUILD
BP1801085 / POST CARD
300 M ST SE STE# 402 20024   
12/13/17 
FEDERAL CENTER LP / null
P1802065 / SUPPLEMENTAL
100 M ST SE   
12/05/17 
CRANE SERVICE CO / CHRISTINE LONG
AH1800304 / CONSTRUCTION
An after hours permit is respectfully requested from 7AM Saturday thru 7PM Sunday
110 M ST SE   
12/13/17 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THUY LE
TL1700234 / CONSTRUCTION
Interior alteration for new tenant, restaurant with 37 seats, 49 in occupancy load.
410 M ST SE   
11/20/17 
DC HOUSING / COLLINS ELEVATOR SERVICES INC.; COLLINS ELEVATOR SERVICES INC.
ER1800511 / SHOP DRAWING
BODY OF WORK: 1. Remove old piston. Replace & install jack on car # 1.
1100 NEW JERSEY AVE SE 3RD FL   
11/22/17 
SQUARE 742 LLC / null
P1801490 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/17 
SQUARE 742 LLC / null
P1801410 / SUPPLEMENTAL
   
12/06/17 
SQUARE 742 LLC / DOMINIC E TOTARO
M1800664 / SUPPLEMENTAL
   
12/08/17 
SQUARE 742 LLC / SAM HOLLEN
B1801219 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. 25,226 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.