Page Through from Before to After
* SOUTH CAPITOL SPEED CAMERAS: MPD has announced the latest batch of speed camera deployments, and it includes South Capitol Street between O Street and Potomac Avenue--alongside Nationals Park and just north of the Douglass Bridge--in both directions. "The 30 day educational phase, or 'warning period', will commence on or about March 23, 2015. During this period, violators will receive warning citations. After the 30 day warning period, MPD will begin issuing live moving citations to violators."  * NATS PARK MAGNETOMETERS: There was a media event on Monday to unveil the new magnetometers at all entrances to Nats Park. (I'll note that this sign about the procedures will probably not be met with glee.) I wasn't at the event, but I did get my own shot on Sunday of the new installations at the Center Field Gate, as you see at right. The new security screening procedures will be in place starting with the April 4 exhibition game against the Yankees. Arrive early! ( WaPo) * US-NY CIRCULATOR CHANGE: "From 3/29, catch the Union Station bus to Navy Yard only at Mass Ave and Columbus Cir 1st & 2nd St stops discontinued." ( @DCCirculator; more here) * YARDS PARK WORK: "We're almost ready for Splash Season! Please 'pardon our dust' as we prepare the water features and basin. We'll update here when finished!" ( @YardsPark)  * PEEKING AT CSX: At right is a shot of the now-cleared area just south of the freeway and behind the 70 and 100 Capitol Yards apartment buildings. This work has had hearts aflutter that there could be some new development coming there, but it is actually just CSX clearing its considerable tract of land as prep work continues for the Virginia Avenue Tunnel. * PEEKING AT EVERYTHING ELSE: I'm going to have to recalibrate my normal mission to over-document projects in blog posts, given the breadth of work underway in the neighborhood. That said, I can't pass up a quick sharing of the cellphone photos I took Sunday afternoon while peeking through fences at the Homewood Suites, 82 I, Hampton Inn/Ballpark Square, and 909 Half sites. (Click all to enlarge.)
It would have been even better if I had included the other holes in the ground, at 1111 New Jersey, 800 New Jersey, and Florida Rock, but I failed.
JDLand.com Home
JD says: (3/24/15 1:56 PM)
Also, if you are seeing "Service Unavailable" messages when arriving at JDLand, generally it should be back in 30 seconds or so, if you refresh. I'm talking to the hosting company to see why they might be happening, since they never did on the old rickety server.
323 says: (3/24/15 5:07 PM)
Another potential issue that totally falls on the user side, but FYI. What is saved in my browser history is: linkand your new index page is: linkSo when my browser autofills the jdland address to include /m-index.cfm it shows an "oops" page, because it no longer exists. Not sure if you can create it and autoforward to the newer page, that might help idiots like me who took a few visits to figure that out.
JD says: (3/24/15 5:14 PM)
Nah, it's just a boo-boo on my part, something in the mobile index page code. Working on it now.
JD says: (3/24/15 5:17 PM)
It should be fixed. m-index is the mobile page, but I sniff to see whether you are really on a mobile browser and, if not, redirect you to the desktop page. (Sorry, folks, no mobile version on desktop!) It was in the redirect that the code was erroring, because of the move.
Thanks so much for passing along.
323 says: (3/24/15 5:45 PM)
Ah, glad it is fixed. I should have ended all of my sentences with questions marks, as that is how much i know about this kind of stuff.
JD says: (3/24/15 8:11 PM)
It's okay, readers aren't expected to know web application development. :)
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| BURGLARY
Burglary Two
| 11/26/20
|
UNIT B/O M ST SE
|
| ROBBERY
| 11/25/20
|
1000 B/O NEW JERSEY AVE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/24/20
|
UNIT B/O I ST SE
|
| ROBBERY
Carjacking
| 11/23/20
|
200 B/O M ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 11/22/20
|
UNIT B/O I ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
700 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
1000 B/O 3RD ST SE
|
| ROBBERY
| 11/21/20
|
1200 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/19/20
|
UNIT B/O M ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 11/18/20
|
1000 B/O HALF ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/12/20
|
1100 B/O 2ND PLACE SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 11/12/20
|
1000 B/O 8TH ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 11/12/20
|
1000 B/O HALF ST SE
|
| THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
| 11/10/20
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/05/20
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/05/20
|
900 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/01/20
|
UNIT B/O I ST SE
|
| THEFT
Theft First Degree (shoplifting)
| 10/31/20
|
900 B/O HALF ST SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 10/29/20
|
300 B/O TINGEY ST SE
|
| ROBBERY
Carjacking
| 10/29/20
|
1300 B/O 4TH ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 10/28/20
|
|
Recent Issued Building Permits
| Archive
|
|
1200 1ST ST SE
|
|
11/04/20
PEPCO / DONNA G GRAHAM
AH2100169 /
CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
|
1018 3RD ST SE
|
|
11/10/20
DAVID A LEINER / null
E2101357 /
SUPPLEMENTAL
|
1300 4TH ST SE 1001
|
|
11/03/20
YAAN REAL ESTATE LP / null
P2100950 /
SUPPLEMENTAL
|
1300 4TH ST SE RU-1
|
|
11/19/20
AP BOWER RETAIL LLC / null
E2101650 /
SUPPLEMENTAL
|
1057 5TH ST SE
|
|
11/05/20
PAM HARDER / null
E2101183 /
SUPPLEMENTAL
|
82 I ST SE
|
|
11/12/20
STARRY / null
E2101432 /
SUPPLEMENTAL
|
330 K ST SE
|
|
11/09/20
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 /
CONSTRUCTION
Adding a bathroom on the first floor
|
|
|
11/10/20
JINGSONG XIA / null
P2101107 /
SUPPLEMENTAL
|
100 M ST SE
|
|
11/12/20
LHREV WASHINGTON M ST LLC / null
P2101170 /
SUPPLEMENTAL
|
|
|
11/12/20
SQUARE 743 INC / ;
P2101121 /
SUPPLEMENTAL
|
139 N ST SE
|
|
11/10/20
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 /
CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF.
SH2000028 issued
|
1275 NEW JERSEY AVE SE
|
|
11/04/20
USA / null
E2101168 /
SUPPLEMENTAL
|
|
|
11/09/20
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 /
POST CARD
|
71 POTOMAC AVE SE APT 1208
|
|
11/02/20
null / NA NA NA
EHOP20957167 /
HOME OCCUPATION
|
71 POTOMAC AVE SE
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
M2100380 /
SUPPLEMENTAL
|
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
P2100978 /
SUPPLEMENTAL
|
|
|
11/09/20
MRP REALTY / null
E2101319 /
SUPPLEMENTAL
|
227 TINGEY ST SE
|
|
11/18/20
FC 227 LLC / null
E2101630 /
SUPPLEMENTAL
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|