At Monday night's ANC 6D meeting, Monument Realty presented to the commission an early look at revised plans for the company's One M Street site on the southeast corner of South Capitol and M streets (i.e., the old Domino's site).
And instead of a third variation of the previously presented 328,000-square-foot office building, Monument is now proposing a 120,000-square-foot office building on the northern portion of the lot, fronting M Street, with a new 175ish-unit residential building immediately to the south (and just to the north of the self-storage building).
While there is no signed tenant for the office building, Monument's representative told me that they have a "user" that they "feel pretty good about," and that they hope to have an announcement within the next few months. (Note that "user" was a very specific choice of words.) In the presentation to 6D, the notion of some of the space being used for "conferences and events" was mentioned, and that they would be shooting toward starting construction in the latter part of 2016.
The residential building is not quite as far along in the design process, but the architects are apparently toying with the notion of a "townhouse"-like feel for the ground-floor units that would face South Capitol Street. There was also talk of some three-bedroom units being included in the plans.
Monument expects to file a new case with the Zoning Commission within the next few weeks, at which point there will be purty drawings and much more detailed information.
(As for the rest of the goings-on at the ANC meeting, that can wait until morning!)
Comments (7)
   
 
 More About Development News
 All posts: Development News, One M, zoning

JDLand.com Home

Comments

202_cyclist says: (3/10/15 2:25 PM)
Regarding three-bedroom units, GGW has a post about amendments to the zoning plan for the neighborhood to allow for more density if the developers agree to provide some three-bedroom apartments as part of their buildings.

DC proposes an incentive for three-bedroom apartments
link


JD says: (3/10/15 2:28 PM)
Looks like I don't need to be posting Tidbits anymore, with @202 clearly itching to take over the franchise.



202_cyclist says: (3/10/15 2:39 PM)
Whatever it takes to win a free JD Land t-shirt...


202_cyclist says: (3/10/15 2:39 PM)
Or Bluejacket gift certificate!


JD says: (3/10/15 2:42 PM)
Oh, any free JDLand t-shirts are going to require FAR more effort than that.

But supplies are already starting to dwindle, so don't be left out!


JD says: (3/10/15 2:49 PM)
By the way, note that the Homewood Suites is only going to have one level of underground parking, so the digging and shoring should be a relatively short part of the process.

I also never really internalized that it's a U-shaped building, with the U pointed northward. (hard to see in the renderings)


JD says: (3/10/15 5:19 PM)
Okay, here we go. A free JDLand t-shirt to the first reader who eats all 100 Montaditos on the menu within the first 100 days of the restaurant's operations.

*DING*! We have a winner!

:-)


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

202_cyclist on Peet's Grand Opening: Folks-- it looks like there may have been an assault recently on along South Cap...
NavyYardNittany on Peet's Grand Opening: I suppose if the comparison you’re using for this Harris Teeter is other DC groc...
snakegriffin on Peet's Grand Opening: @Ampersand: You are 100% correct, it is still the best grocery store with proxim...
Ampersand on Peet's Grand Opening: Besides the sometimes insanely long lines, I’ve never really understood the Navy...
202_cyclist on Peet's Grand Opening: @Dude— I suppose being disappointed in August will save us from the annual Octob...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18
200 B/O I ST SE   ROBBERY  07/17/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.