Since January, 2003
            
 (a random before-and-after moment)
October 18, 2003
June 5, 2007
New Jersey at M, Looking South-Southeast (see more)

FLASH
EXCLUSIVE
MUST CREDIT JDLAND
I would not want anyone to think I am not providing the news that is of utmost interest and importance, so please study the photo at right (click to enlarge) to confirm with your own lying eyes that work is now underway on the concrete slab at the bottom of the 800 New Jersey/Whole Foods hole. In other words, there's nowhere to go but up now.
You'll still have to wait until at least 2017 to get your quinoa, but this summer the view into the neighborhood from the freeway should be changing yet again.
This has been a JDLand Special Report. We now return you to regularly scheduled programming.
Comments (15)
   
 
 More About 800 NJ/Whole Foods

JDLand.com Home

Comments

JD says: (2/4/15 3:11 PM)
OT: I'm working on a real post on this (you know, doing some *reporting*, which can take a bit of time), but so that @202_cyclist doesn't have an attack I will note that 909 Half Street got its shoring permit today.


JES says: (2/4/15 4:23 PM)
909? Are they still building this? link


JD says: (2/4/15 4:26 PM)
I assume so.


JD says: (2/4/15 4:28 PM)
The shoring permit is "EXCAVATION SHEETING AND SHORING AS PER PLAT AND PLANS FOR A NEW MIXED-USE BUILDING CONSISTING OF 13 STORIES AND 3 BELOW GRADE LEVELS OF PARKING." They remain decidedly tight-lipped, though.


JES says: (2/4/15 4:30 PM)
Grrr. I like pretty renderings.


JD says: (2/4/15 4:32 PM)
I'm pretty sure this is the first time in my 12 years of this that a project has gotten to an approved excavation permit without my seeing a single drawing.


JD says: (2/4/15 4:44 PM)
... And, for those not following the mini-discussion on Twitter, apparently the Ballpark Square site (1st Street just south of M) has been locked up, with parking booths removed. The south end of this lot has its excavation permit--the north end is the 99 M office building site, with no approved permits. But perhaps that footprint is going to be staging for the Ballpark Square (residential/hotel) work.

Also keep an eye for any sudden movement at 50 M.

I am going to drop from exhaustion trying to keep track of all of these once they get going--that's four probably starting Any Minute Now, if you count BP Square, 50 M, 909 Half (all with excavation permits approved), and then the likely 82 I start.


JES says: (2/4/15 4:59 PM)
But have Homewood Suites and BP Square been removed from the Nats parking inventory yet? THAT is the question!


JD says: (2/4/15 5:01 PM)
Neither of them were Nats lots last year. 99 M was, though.


JES says: (2/4/15 5:18 PM)
Ahh. Did not know that.


JD says: (2/4/15 5:23 PM)
They were still cash lots, but weren't Official Nats lots. I think the 50 M site went out of the Nats inventory at least two seasons ago, if not three. I wrote last year about the southern half of Lot F not being part of the inventory, and how they were planning that the lot would be unavailable not long after the start of the season because of the start of construction. (Tee hee.)

But this now makes two official Nats lots out of the official inventory from last year--the stub Lot F and the 1015 Half garage Lot P, along with two cash lots (50 M and BP Square). Forest City will bring 220ish spaces back when the lot gets built on the southwest corner of the Spooky lot, but otherwise, we may be starting to see a bit of lot scarcity. And it's generally only office buildings that offer public parking in their underground lots, so it may be a while before there's new offerings underground.



JD says: (2/4/15 5:25 PM)
(.... though maybe BP Square will have some public parking available in its garage thanks to the hotel and all of that retail.)



JES says: (2/4/15 8:07 PM)
We all knew the surface lots had a limited shelf life anyway. The fewer suburbanites blowing stop signs and almost running into me in crosswalks, the better.


Alan says: (2/5/15 10:26 AM)
The 50 M lot reverted to a Nats lot overnight midway through the season last year--no idea why. I want to say it was marked for Lot H permit holders, but can't remember. Never really filled up though during any games except playoffs.


JD says: (2/5/15 10:29 AM)
It was Lot J, I think. Lot H is the garage at 20 M, so maybe it was overflow.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

walt on DDOT Unveils Planned: This is excellent news! Can't wait to get on that circulator.
RMP on DDOT Unveils Planned: I support this change. I like the current Ciculator route in theory, but it take...
NavyYardGuy on Peet's Coffee Coming: @ JD..was that a hint..like Compass coffee is coming to Navy Yard too?
Ampersand on DDOT Unveils Planned: aaaaaaand now that I've posted that I see exactly such a route would also be cre...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/15/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/12/17
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/11/17
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/08/17
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/08/17
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 12/03/17
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/02/17
500 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/02/17
1100 5TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/01/17
400 B/O M ST SE   THEFT
Shoplifting
 11/29/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/27/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/26/17
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/17
1200 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 11/24/17
400 B/O M ST SE   THEFT
Shoplifting
 11/22/17
100 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 11/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/13/17 
BAKER DC / CHRISTINE LONG
AH1800290 / CONSTRUCTION
An after hours permit is respectfully requested from 5am thru 9pm daily
1331 2ND ST SE   
11/29/17 
DC WATER / DAVE LEVINE
AH1800282 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water. Corman Construction 301-343-5417
2 I ST SE   
11/29/17 
MCDONALDS CORPORATION / MICHAEL ERIC CAMPBELL
M1800603 / SUPPLEMENTAL
   
11/29/17 
MCDONALDS CORPORATION / DANIEL P. THOMPSON
P1801598 / SUPPLEMENTAL
   
12/01/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800280 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
   
12/14/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800324 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
70 I ST SE   
11/28/17 
DISTRICT OF COLUMBIA / OTIS ELEVATOR COMPANY; OTIS ELEVATOR COMPANY
ER1800447 / SHOP DRAWING
BODY OF WORK: Replace machine and recable elevator # 1.
337 L ST SE   
12/06/17 
JENNIFER LANCASTER / null
E1802092 / SUPPLEMENTAL
347 L ST SE   
12/07/17 
THOMAS PAQUIN / null
E1802129 / SUPPLEMENTAL
   
12/14/17 
THOMAS PAQUIN / BJORN FALK
SOL1800006 / CONSTRUCTION
Installation of a 5.4kW solar PV system. Parapet mounted, 15 panels
555 L ST SE   
11/27/17 
UNITED STATES OF AMERICA / CLIFFORD DIXON
B1714199 / CONSTRUCTION
DGS PROJECT This permit is for interior work only.SWING SPACE FOR WARD 6 CLINIC TO EXISTING VACANT JOY EVANS RECREATION CENTER TEMPORARILY FOR 12 TO 18 MONTHS
515 M ST SE   
12/11/17 
null / BLUE STAR DESIGN BUILD
BP1801085 / POST CARD
300 M ST SE STE# 402 20024   
12/13/17 
FEDERAL CENTER LP / null
P1802065 / SUPPLEMENTAL
100 M ST SE   
12/05/17 
CRANE SERVICE CO / CHRISTINE LONG
AH1800304 / CONSTRUCTION
An after hours permit is respectfully requested from 7AM Saturday thru 7PM Sunday
110 M ST SE   
12/13/17 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THUY LE
TL1700234 / CONSTRUCTION
Interior alteration for new tenant, restaurant with 37 seats, 49 in occupancy load.
410 M ST SE   
11/20/17 
DC HOUSING / COLLINS ELEVATOR SERVICES INC.; COLLINS ELEVATOR SERVICES INC.
ER1800511 / SHOP DRAWING
BODY OF WORK: 1. Remove old piston. Replace & install jack on car # 1.
861 NEW JERSEY AVE SE   
12/14/17 
CSX TRANSPORTATION INC. / NA CSX TRANSPORTATION, INC.
AH1800330 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1100 NEW JERSEY AVE SE 3RD FL   
11/22/17 
SQUARE 742 LLC / null
P1801490 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/17 
SQUARE 742 LLC / null
P1801410 / SUPPLEMENTAL
   
12/06/17 
SQUARE 742 LLC / DOMINIC E TOTARO
M1800664 / SUPPLEMENTAL
   
12/08/17 
SQUARE 742 LLC / SAM HOLLEN
B1801219 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. 25,226 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.