Since January, 2003
            
 (a random before-and-after moment)
November 11, 2007
June 4, 2017
Hull at M, Looking Northwest (see more)

FLASH
EXCLUSIVE
MUST CREDIT JDLAND
I would not want anyone to think I am not providing the news that is of utmost interest and importance, so please study the photo at right (click to enlarge) to confirm with your own lying eyes that work is now underway on the concrete slab at the bottom of the 800 New Jersey/Whole Foods hole. In other words, there's nowhere to go but up now.
You'll still have to wait until at least 2017 to get your quinoa, but this summer the view into the neighborhood from the freeway should be changing yet again.
This has been a JDLand Special Report. We now return you to regularly scheduled programming.
Comments (15)
   
 
 More About Agora/Whole Foods

JDLand.com Home

Comments

JD says: (2/4/15 3:11 PM)
OT: I'm working on a real post on this (you know, doing some *reporting*, which can take a bit of time), but so that @202_cyclist doesn't have an attack I will note that 909 Half Street got its shoring permit today.


JES says: (2/4/15 4:23 PM)
909? Are they still building this? link


JD says: (2/4/15 4:26 PM)
I assume so.


JD says: (2/4/15 4:28 PM)
The shoring permit is "EXCAVATION SHEETING AND SHORING AS PER PLAT AND PLANS FOR A NEW MIXED-USE BUILDING CONSISTING OF 13 STORIES AND 3 BELOW GRADE LEVELS OF PARKING." They remain decidedly tight-lipped, though.


JES says: (2/4/15 4:30 PM)
Grrr. I like pretty renderings.


JD says: (2/4/15 4:32 PM)
I'm pretty sure this is the first time in my 12 years of this that a project has gotten to an approved excavation permit without my seeing a single drawing.


JD says: (2/4/15 4:44 PM)
... And, for those not following the mini-discussion on Twitter, apparently the Ballpark Square site (1st Street just south of M) has been locked up, with parking booths removed. The south end of this lot has its excavation permit--the north end is the 99 M office building site, with no approved permits. But perhaps that footprint is going to be staging for the Ballpark Square (residential/hotel) work.

Also keep an eye for any sudden movement at 50 M.

I am going to drop from exhaustion trying to keep track of all of these once they get going--that's four probably starting Any Minute Now, if you count BP Square, 50 M, 909 Half (all with excavation permits approved), and then the likely 82 I start.


JES says: (2/4/15 4:59 PM)
But have Homewood Suites and BP Square been removed from the Nats parking inventory yet? THAT is the question!


JD says: (2/4/15 5:01 PM)
Neither of them were Nats lots last year. 99 M was, though.


JES says: (2/4/15 5:18 PM)
Ahh. Did not know that.


JD says: (2/4/15 5:23 PM)
They were still cash lots, but weren't Official Nats lots. I think the 50 M site went out of the Nats inventory at least two seasons ago, if not three. I wrote last year about the southern half of Lot F not being part of the inventory, and how they were planning that the lot would be unavailable not long after the start of the season because of the start of construction. (Tee hee.)

But this now makes two official Nats lots out of the official inventory from last year--the stub Lot F and the 1015 Half garage Lot P, along with two cash lots (50 M and BP Square). Forest City will bring 220ish spaces back when the lot gets built on the southwest corner of the Spooky lot, but otherwise, we may be starting to see a bit of lot scarcity. And it's generally only office buildings that offer public parking in their underground lots, so it may be a while before there's new offerings underground.



JD says: (2/4/15 5:25 PM)
(.... though maybe BP Square will have some public parking available in its garage thanks to the hotel and all of that retail.)



JES says: (2/4/15 8:07 PM)
We all knew the surface lots had a limited shelf life anyway. The fewer suburbanites blowing stop signs and almost running into me in crosswalks, the better.


Alan says: (2/5/15 10:26 AM)
The 50 M lot reverted to a Nats lot overnight midway through the season last year--no idea why. I want to say it was marked for Lot H permit holders, but can't remember. Never really filled up though during any games except playoffs.


JD says: (2/5/15 10:29 AM)
It was Lot J, I think. Lot H is the garage at 20 M, so maybe it was overflow.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

jdc on Catching Up on: ABC Pony? Yikes.
walt on West Half Now: I love the West Half logo. But there should probably be a $$ in there somewher...
CJBabyDaddy on Entertainment Venue Addition: @conngs0: And let the church say “Amen.” You and I need to storm Lerner HQ and...
conngs0 on Entertainment Venue Addition: CJ, I am willing to go to Nats Park in October even after an inevitable playoff ...
CJBabyDaddy on Entertainment Venue Addition: @conngs0: I thought the Nats’ recurring playoff collapses were the worst things...
GarfieldPark on Entertainment Venue Addition: ORE residents received a notice that the sidewalk will be closing on NJ avenue (...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
08/20/19 
YAAN REAL ESTATE LP / MITCH A. PERMUY; MITCH A. PERMUY
E1910356 / SUPPLEMENTAL
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
150 I ST SE   
08/20/19 
null
E1910665 / SUPPLEMENTAL
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
419 K ST SE   
08/19/19 
FAROOQ MITHA / KYLE YOST; KYLE YOST
SOL1901385 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
08/21/19 
FAROOQ A MITHA / null
E1910733 / SUPPLEMENTAL
100 M ST SE 20003   
08/21/19 
PARSONS / null
E1910735 / SUPPLEMENTAL
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1275 NEW JERSEY AVE SE   
08/20/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW; JUSTIN BELLOW; TBD
BCIV1900130 / CONSTRUCTION
Civil permit for grading, site demo, and installation of sediment erosion control measures Site utilities, provide property. Stormwater management will be under subsequent permits.
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
08/19/19 
DC WATER / null
E1910631 / SUPPLEMENTAL
79 POTOMAC AVE SE   
08/19/19 
RIVERFRONT HOLDINGS I LLC / null
E1910633 / SUPPLEMENTAL
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.