Since January, 2003
            
 Sliding from Before to After

FLASH
EXCLUSIVE
MUST CREDIT JDLAND
I would not want anyone to think I am not providing the news that is of utmost interest and importance, so please study the photo at right (click to enlarge) to confirm with your own lying eyes that work is now underway on the concrete slab at the bottom of the 800 New Jersey/Whole Foods hole. In other words, there's nowhere to go but up now.
You'll still have to wait until at least 2017 to get your quinoa, but this summer the view into the neighborhood from the freeway should be changing yet again.
This has been a JDLand Special Report. We now return you to regularly scheduled programming.
Comments (15)
   
 
 More About Agora/Whole Foods

JDLand.com Home

Comments

JD says: (2/4/15 3:11 PM)
OT: I'm working on a real post on this (you know, doing some *reporting*, which can take a bit of time), but so that @202_cyclist doesn't have an attack I will note that 909 Half Street got its shoring permit today.


JES says: (2/4/15 4:23 PM)
909? Are they still building this? link


JD says: (2/4/15 4:26 PM)
I assume so.


JD says: (2/4/15 4:28 PM)
The shoring permit is "EXCAVATION SHEETING AND SHORING AS PER PLAT AND PLANS FOR A NEW MIXED-USE BUILDING CONSISTING OF 13 STORIES AND 3 BELOW GRADE LEVELS OF PARKING." They remain decidedly tight-lipped, though.


JES says: (2/4/15 4:30 PM)
Grrr. I like pretty renderings.


JD says: (2/4/15 4:32 PM)
I'm pretty sure this is the first time in my 12 years of this that a project has gotten to an approved excavation permit without my seeing a single drawing.


JD says: (2/4/15 4:44 PM)
... And, for those not following the mini-discussion on Twitter, apparently the Ballpark Square site (1st Street just south of M) has been locked up, with parking booths removed. The south end of this lot has its excavation permit--the north end is the 99 M office building site, with no approved permits. But perhaps that footprint is going to be staging for the Ballpark Square (residential/hotel) work.

Also keep an eye for any sudden movement at 50 M.

I am going to drop from exhaustion trying to keep track of all of these once they get going--that's four probably starting Any Minute Now, if you count BP Square, 50 M, 909 Half (all with excavation permits approved), and then the likely 82 I start.


JES says: (2/4/15 4:59 PM)
But have Homewood Suites and BP Square been removed from the Nats parking inventory yet? THAT is the question!


JD says: (2/4/15 5:01 PM)
Neither of them were Nats lots last year. 99 M was, though.


JES says: (2/4/15 5:18 PM)
Ahh. Did not know that.


JD says: (2/4/15 5:23 PM)
They were still cash lots, but weren't Official Nats lots. I think the 50 M site went out of the Nats inventory at least two seasons ago, if not three. I wrote last year about the southern half of Lot F not being part of the inventory, and how they were planning that the lot would be unavailable not long after the start of the season because of the start of construction. (Tee hee.)

But this now makes two official Nats lots out of the official inventory from last year--the stub Lot F and the 1015 Half garage Lot P, along with two cash lots (50 M and BP Square). Forest City will bring 220ish spaces back when the lot gets built on the southwest corner of the Spooky lot, but otherwise, we may be starting to see a bit of lot scarcity. And it's generally only office buildings that offer public parking in their underground lots, so it may be a while before there's new offerings underground.



JD says: (2/4/15 5:25 PM)
(.... though maybe BP Square will have some public parking available in its garage thanks to the hotel and all of that retail.)



JES says: (2/4/15 8:07 PM)
We all knew the surface lots had a limited shelf life anyway. The fewer suburbanites blowing stop signs and almost running into me in crosswalks, the better.


Alan says: (2/5/15 10:26 AM)
The 50 M lot reverted to a Nats lot overnight midway through the season last year--no idea why. I want to say it was marked for Lot H permit holders, but can't remember. Never really filled up though during any games except playoffs.


JD says: (2/5/15 10:29 AM)
It was Lot J, I think. Lot H is the garage at 20 M, so maybe it was overflow.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Tidbits: SWneighbor— here is the company that provides the balloons for construction phot...
202_cyclist on Tidbits: https://gizmodo.com/up-in-the-air-using-tethered-balloons-to-photograph-th-15688...
SWneighbor on Tidbits: What is a construction blimp?
GarfieldPark on Tidbits: UPS store is a great addition to the hood, one that I wouldn't even have thought...
walt on Tidbits: Anybody have any hints/advice for going to watch the Apollo 50 display tonight o...
walt on Tidbits: Tried El Bebe last night and I was FLOORED by how good the cauliflower taco was....
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/18/19
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/17/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19
300 B/O K ST SE   HOMICIDE
Murder I
 06/22/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/20/19
100 B/O H ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/19/19
400 B/O M ST SE   THEFT
Shoplifting
 06/19/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/25/19 
SQUARE 769N OWNER LLC / THANOS VOREAS
EG1903573 / POST CARD
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
   
07/17/19 
BAKER DC LLC / CHRISTINE LONG
AH1901077 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
   
07/16/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909416 / SUPPLEMENTAL
   
07/17/19 
FC BOILERMAKER LLC / ;
P1907864 / SUPPLEMENTAL
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
   
07/15/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909370 / SUPPLEMENTAL
   
07/18/19 
FC BOILERMAKER LLC / ;
P1907922 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.