A community meeting is on tap for Thursday (tomorrow), Dec. 11, to discuss the future Southeast Blvd., specifically the ideas emerging from the neighborhood study currently being spearheaded by ANC 6B, the Office of Planning, and DDOT.
The meeting is from 7 to 9 pm at Friendship Chamberlain Elementary School, 1345 Potomac Ave., SE, across from the Jenkins Row Harris Teeter.
Councilmember Tommy Wells will be there, and will be part of the discussion on how to best integrate into the neighborhood this road that will run from Barney Circle to the new intersection at 11th Street, SE, along the path of the old sunken portion of the Southeast Freeway.
A "temporary" version of the road is opening in early 2015, and residents have been concerned both about this becoming the de facto new version of the road, a feeling that came on the heels of the original new designs put forth by DDOT, that were basically replacing an old freeway with a new freeway, albeit it one that has a stoplight at 11th Street rather than just a free-and-clear approach to the Southeast Freeway. After those designs were released, with a push from Wells, the Office of Planning stepped in to help shepherd a neighborhood study--initial design concepts were unveiled back in August, and this week's meeting is to continue the process of refining the possibilities.
(And I am well aware that I have completely failed at keeping up with photographs of that area of 11th and of the work underway on the temporary road. All of the construction there, and the futzing with the traffic flow configuration of 11th Street while work continues around it, have made me very cranky about going over there to take pictures. Maybe this will finally spur me.)
Comments (4)
   
 
 More About meetings

JDLand.com Home

Comments

Gamble Rogers says: (12/10/14 6:09 PM)
Come on down and grab some pictures, JD! You can at least flash a press pass when the dudes in hardhats ask why you're walking down the road with a huge camera in hand. (Our three-year-old reeeeaaaalllllly wants to get closer to the construction equipment.)

Having looked at the current re-building of the Southeast Freeway, plus the draft Office of Planning concepts, it's unclear how DDOT will combine reality with plans. Once the road opens, it's going to be really hard to make changes to the existing road.

But Wells/Allen/Ward 6 folks should push hard for some innovative concept. If not, that section of the river will continue to be forlorn. And would Cohen really build down there if the desolate status-quo remains?


JD says: (12/11/14 12:45 PM)
These were the latest SE Blvd. concept drawings, as of October:

link


E. Masquinongy says: (12/11/14 9:18 PM)
OK, DDOT got the memo; these are better


JD says: (12/11/14 9:20 PM)
(Not DDOT, really--Office of Planning is spearheading this concepts phase)

As soon as I get the slides from tonight's meeting, which are slightly different from the ones above, I will post.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Top News

dcgent on April Construction Report: Perhaps but I thoght all three were on the river. JD previously wrote about Dach...
malatesta on April Construction Report: I didn't get super close to it on my run today, but it seemed like the new retai...
dcgent on April Construction Report: Has Dacha pulled out of Dock79, or been kicked out? The corner where I thought i...
202_cyclist on April Construction Report: @malatesta— I am eagerly awaiting the robot wars!
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   SEX ABUSE
First Degree Sexual Abuse
 04/17/18
400 B/O M ST SE   THEFT
Shoplifting
 04/17/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/17/18
UNIT B/O N ST SE   ROBBERY  04/14/18
100 B/O I ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/12/18
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/12/18
1200 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/09/18
150 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/07/18
1000 B/O 3RD ST SE   BURGLARY
Burglary One
 04/07/18
1200 B/O NEW JERSEY AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 04/05/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/01/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
300 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  03/25/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 03/23/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/23/18
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/23/18

Recent Issued Building Permits Archive  
1331 2 ST SE   
04/02/18 
DISTRICT OF COLUMBIA / MARK HARLOW CLIFFORD
SB1800225 / CONSTRUCTION
Application for Well Abandonment Workplan Approval for the abandonment of 8 monitoring wells and 21 inclinometers at the Main Pumping Station site for the DC Water Clean Rivers Project, Division I, installed under Permit Number SB1400419.
1100 2ND PL SE   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801710 / SHOP DRAWING
Install 1 New G2S 3500LBS @350FPM, Elevator 2; 13 Floors
   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801712 / SHOP DRAWING
Install 2 New G2S Elevators - 3500LBS@35FPM Elevator 1, 12 Floors
1331 2ND ST SE 20003   
04/05/18 
DC WATER / DAVE LEVINE
AH1800744 / CONSTRUCTION
After Hours work for structure excavation in support of DC Water, Corrman Construction 301-343-5417.
1300 4TH ST SE   
04/17/18 
null / DONNA G GRAHAM
AH1800863 / CONSTRUCTION
WR #3476633-WARD 6-20003-VAETH / BRUNO - PEPCO CREWS WILL BE WORKING THE 1200 - 1300 BLK OF 4TH ST SE - INSTALLING NETWORK TRANSFORMER AND INSTALLING PRIMARY CABLES - STARTING THURSDAY 4 / 19 / 18 UNTIL 5 / 19 / 18 - MONDAY THRU FRIDAYS AT 10PM UNTIL 10AM AND ON SATURDAY AND SUNDAYS FROM 6AM TIL 8PM.
1346 4TH ST SE   
04/10/18 
ALAN OWINGS / ROBERT HENRY
AH1800796 / CONSTRUCTION
After Hours Permit for 04 / 16 / 18 from 9AM to 7PM to perform facade, interior unit framing and drywall work, and interior Mechanical, Electrical, Plumbing and Sprinkler Rough-In.
1346 4TH ST ST SE 20003   
03/28/18 
FOREST CITY / TYLER D BARRON
AH1800712 / CONSTRUCTION
After hours for 4 / 13 / 18 to 5 / 12 / 18. Work that is to be done is quiet work of window deliveries at 5:30AM to 7:00AM by use of tower crane
82 I ST SE   
04/02/18 
GDVC EYE STREET LLC / null
FB1800055 / SUPPLEMENTAL
150 I ST SE   
03/28/18 
null
E1805313 / SUPPLEMENTAL
   
03/29/18 
null / JOHN THOMSON 3018645080
E1805337 / SUPPLEMENTAL
300 M ST SE 400   
04/09/18 
FEDERAL CENTER LP / null
M1801970 / SUPPLEMENTAL
300 M ST SE STE# 400 20024   
04/05/18 
CHARLES SMITH / EUGENE AHNS 3012811497
E1805597 / SUPPLEMENTAL
300 M ST SE STE# 400   
04/12/18 
FEDERAL CENTER LP / null
P1805161 / SUPPLEMENTAL
140 M ST SE   
03/26/18 
SQUARE 742 LLC / null
P1804630 / SUPPLEMENTAL
300 M ST SE   
03/26/18 
FEDERAL CENTER LP / JERRY BETHEA
M1801846 / SUPPLEMENTAL
401 M ST SE   
04/03/18 
TETRA TECH C/O DOEE / JESSICA REICHARD
AH1800767 / CONSTRUCTION
After hours permit for manhole access to complete inspections for DOEE Anacosta River Sediment clean up project, work hours between 7pm and 7am Monday thru Friday. Rolling work zones for all manhole access under permit # PA10374319-R1
800 NEW JERSEY AVE SE   
04/05/18 
SQUARE 737 LLC / null
P1804974 / SUPPLEMENTAL
   
04/09/18 
SQUARE 737 LLC / null
E1805700 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/02/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800715 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
04/11/18 
CONSOLIDATED RAIL CORPORATION / DEVIN MURDOCK
SB1800265 / CONSTRUCTION
Drill 8 borings to 40ft. Convert 4 borings into 1" temporary wells, collect groundwater from each well and abandon borings.
1100 NEW JERSEY AVE SE   
04/18/18 
null
E1805988 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / GARY BRENT; BRENT
SG1800260 / CONSTRUCTION
Install 1 illuminated wall sign, 1 illuminated window sign and 1 window vinyl decal sign - Peets Coffee
1100 NEW JERSEY AVE SE 5TH FL   
04/19/18 
SQUARE 742 LLC / DOMINIC E TOTARO 301-725-1998
M1802089 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/13/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1804348 / CONSTRUCTION
INTERIOR RENOVATIONS TO OFFICE SPACE ON THE 5TH FLOOR. **DEMOLITION, LEVEL 2 ALTERATION
   
04/19/18 
SQUARE 742 LLC / PEDRO C. CASTILLO 3019219056
E1806025 / SUPPLEMENTAL
   
04/19/18 
SQUARE 742 LLC / null
E1806015 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/06/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ACCUPERMIT LLC AS AGENT
B1803009 / CONSTRUCTION
Interior alterations for new tenant in existing commercial space to include partitions, mill work, electrical and plumbing fixtures, flooring and wall coverings, dining area furniture and kitchen equipment for a A-2 restaurant with 49 proposed occupancy.
125 O ST SE   
03/29/18 
DISTRICT OF COLUMBIA / JAMES M. HALLER
P1804624 / SUPPLEMENTAL
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801762 / SHOP DRAWING
I New G2S Elevator - 3500LBS @ 200FPM (7 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801763 / SHOP DRAWING
Install 1 New G2S Elevator - 3500LBS @ 200FPM (6 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801761 / SHOP DRAWING
Install 1 New G2S Elevators 4000LBS @ 200FPM (7 Floors)
71 POTOMAC AVE SE 20002   
04/19/18 
null / STEVE GRIFFIN
BP1802939 / POST CARD
71 POTOMAC AVE SE   
03/26/18 
FORIDA ROCK PROPERTIES INC / null
BCIV1800074 / CONSTRUCTION
This permit is for rough grading and erosion and sediment control civil work associated with the temporary parking lot, relocation of the dog park and construction staging area on the undeveloped portion of the lot.
   
04/17/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
FD1800020 / CONSTRUCTION
Foundation only for new residential building
227 TINGEY ST SE   
03/28/18 
UNITED STATES OF AMERICA / ERICKA CLARK
AH1800760 / CONSTRUCTION
significant concrete pours and tower crane erection 5AM - 7AM and 7PM - 10:00PM
   
04/12/18 
UNITED STATES OF AMERICA / STEPHEN J. EXELBERT
P1805022 / SUPPLEMENTAL
300 TINGEY ST SE   
04/12/18 
MERCURY LLC / WILL TEASS
B1803433 / CONSTRUCTION
INTERIOR FIT-OUT / EXTENSION OF EXISTING TENANT SUITE (APPROVED UNDER B1605215) INCLUDING NEW MECHANICAL AND ELECTRICAL WORK. **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.