Since January, 2003
            
 Sliding from Before to After

Worn out from all these photo updates? Imagine how I feel. But I start getting the shakes if I don't at least touch on the status of each project currently underway, and having given the latest from Florida Rock and Arris and the Lofts at CQ, I need to run through the rest of them. It's a sickness.
Let's start with the holes in the ground. First are the two newest ones, with the initial hints of the foundation at the Capper Community Center Building House (left), and the more substantial digging underway at the 1111 New Jersey/Gallery at Capitol Riverfront apartment building.
Meanwhile, up at 800 New Jersey, the hole, it is deep. (And, as an aside, this poor project desperately needs a name, other than "that building that's going to have the Whole Foods." Even the signage looks a little forlorn.)
On the other end of the spectrum, we have the three topped-out buildings in various stages: at left is the Hampton Inn, which just reached this milestone within the past few weeks, then there's the Park Chelsea residential building, which may someday see the completion of its exterior masonry work, and finally the Parc Riverside apartment building, which is probably about to graduate out of my project updates given that the first units are expected to open in December.
Comments (5)
   
 
 More About Development News

JDLand.com Home

Comments

conngs0 says: (11/18/14 9:50 AM)
Thanks for the updates, JD! I don't think anyone could get sick of the additional information. The projects are all looking good, and I'm excited for them to be completed. The slowness of progress on the brick fa├žade for the Park Chelsea building partially helps explain to me why it'll take so darn long for the 800 New Jersey building to be finished. 2016/2017?!


Nanjemoy1 says: (11/18/14 10:40 AM)
JD, your "sickness" is much appreciated! Thank you.


JD says: (11/18/14 5:50 PM)
And thank you!

(and now I'm resting for the rest of the week, unless there's big news. Will miss the meetings this week too, alas)


ZoolanderANDtheBoYz says: (11/18/14 8:42 PM)
Are you hiring non paid interns? If so, I am glad to volunteer...JK


JD says: (11/23/14 9:22 PM)
I've been out of town for a few days, but I don't think I missed too much. However, a long-awaited building permit came through on Friday, which is the shoring/sheeting/excavation permit for Ballpark Square. I'm assuming it's for both the hotel and apartment building, but I don't know with 1000% certainty. Watch for fencing changes & other obvious movements along 1st between M and N (north of the Hampton Inn)....

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Andres4Mayor on Meet the New: Khin's Sushi opening April 16. https://www.instagram.com/p/CNsUxvkJ6Yd/
dcgent on Meet the New: Gatsby across from Nats Park just opened https://dc.eater.com/2021/4/8/22371682/...
Shogungts on Meet the New: Washington Post article today on DC bridges touching on two near and dear to jdl...
JES on Meet the New: This probably doesn't come as much of a shock, but Declaration is officially not...
JD on Meet the New: The BID says that Gatsby is opening April 6.
jdc on Meet the New: Ahh. I'm back. Great to see all these developments, but sad to see ones go that ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
02/22/21 
AP BOWER RETAIL LLC / null
E2104231 / SUPPLEMENTAL
1346 4TH ST SE APT 1M   
02/06/21 
null / NA NA NA
EHOP21945129 / HOME OCCUPATION
1331 4TH ST SE R-2   
02/08/21 
FC 1331 LLC / FC 1331 LLC
BP2101814 / POST CARD
10 I ST SE   
02/16/21 
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
555 L ST SE   
01/29/21 
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 / CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
861 NEW JERSEY AVE SE 20003   
02/23/21 
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 / CONSTRUCTION
Dismantling of tower crane.
809 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 / SUPPLEMENTAL
853 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC / null
E2103924 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
02/05/21 
GS CSX HOTEL OWNER LLC / null
E2103762 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
02/02/21 
FC 1275 NJ LLC / null
E2103662 / SUPPLEMENTAL
   
02/11/21 
FC 1275 NJ LLC / null
P2103445 / SUPPLEMENTAL
848 SOUTH CAPITOL ST SE   
02/16/21 
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2021 JD.