Since January, 2003
            
 (a random before-and-after moment)
November 17, 2004
June 3, 2019
2nd (West) at K, Looking East-Northeast (see more)

Monday's news that "The Brig", the long-planned beer garden at 8th and L, is moving forward caught certain observers flat-footed, especially certain observers who had lost the thread of the project's long road through the city's historic preservation review process, especially as it reappeared during 2013. (Though, to be fair, certain observers were in 2013 distracted by other circumstances.)
But in reading various documents more closely, the equally big news is that the project has gone from a restaurant with a roof deck and patio to a design that's more in keeping with the idea of a real "beer garden" -- the design that will now be built is of a big outdoor space with tables and room to stand around, plus a small "service" building that has no seating.
In 2011, site owners Mark Brody and Alan Gaunoux had planned what I described at the time as a "one-story building with a roof deck, in addition to the proposed ground-level summer garden. The look of the building (which is closer to 1 1/2 stories high) is very industrial, with large multi-paned windows and lots of "wood rainscreening" on the exterior and the roof deck."
The Historic Preservation Review Board's staff report in Feb. 2011 referred to the design's "somewhat chaotic and unfinished appearance," but the commissioners felt that it was on the right track and "was very close" to achieving acceptance. The next month, the owners returned with a "substantially simplified" design, moving to a brick veneer and other changes. This version appeared on the board's consent calendar, with final approval delegated to the board's staff.
And then we fast-forward to April of 2013, when Brody and Gaunoux returned to the HPRB with a scaled-back plan after apparently having "reevaluated their finances." The HPRB staff report described the new version as "largely an open-air 'use' of the existing lot, with a smaller service building rather than the indoor restaurant space previously proposed."
The new design included a one-story stucco building along the northern edge of the property, just for restrooms, storage, a small kitchen, and the bar opening up to the garden. There would be a roof-type structure projecting 10 feet southward to cover the bar area, and a paved area along the east edge of the site that could provide space for a food truck and trash collection. The bulk of the site would be "paved" with flagstone, and there would be a 6'6" "ornamental" metal fence surrounding the site, plus a central pole anchoring string lights that would provide illumination. All of which, according to the board's staff, would improve on the "visually disadvantageous" parking lot now on the site, as seen in the above photograph from March of 2014.
The service building became a focus, with the Historic Preservation Office having "discouraged the applicants from proposing trailers, shipping containers, or portable toilets." In June, a revision of the revised design updated the service building including signage and new fixed shutters on the building's blank wall along 8th Street, plus a "decorative parapet" and cornice along the roof line, similar to what is seen on several of the one-story buildings along Barracks Row.
On July 11, 2013, the board approved these concept plans, and by mid-August a building permit had been applied for, with a scope of work described as "a prepared food shop with an accessory fast food establishment (food truck) for 210 seats and 399 occupants." That permit took nearly 15 months and numerous corrections to get its approvals, with the permit finally being issued last week and the owner saying that he expects to break ground soon.
(And this huge summary doesn't even get into the Class CT Tavern liquor license fight back in 2011!)
So, all in all, it does sound like if you're one who likes your beer garden to be heavy on the "garden," this will be right up your alley. It also sounds like it's perhaps starting small, without too much of an investment, to see whether it catches on.
Comments (7)
   
 
 More About The Brig Beer Garden

JDLand.com Home

Comments

adamdonovan says: (11/7/14 2:02 PM)
Sounds like a local(er) version of the Dacha beer garden up in Shaw, which is a great spot. Would also explain the mention of porta-loos and trailers, as Dacha uses a refrigerated trailer to store the kegs behind the bar, and has a row of (very well maintained) porta-loos for the bathrooms.


JES says: (11/7/14 2:05 PM)
Correct me if i'm wrong, but it also sounds like a bigger version of Dacha. I've only been to Dacha once, but I don't remember it having space for almost 400 people.

I'm super stoked for this project, actually. It sounds kind of like the Fairgrounds, only much better in that they hopefully won't only sell terrible beer.


the Brig says: (11/12/14 11:20 AM)
We will only have good beer. Draft American Craft Beer and Draft German Beer as well as others. We will have live music on select nights.


Gamble Rogers says: (11/12/14 3:10 PM)
@the Brig

(and presuming you speak for The Brig)

As one of the few residents in the immediate area, your business will be welcomed by neighbors and Nats fans. Our section of Lower 8th Street gets plenty of foot traffic in the summertime during baseball season. Surprisingly, many fans still walk straight down Barracks Row all the way to M Street and then to Nats Park. If your beer list is good, you'll capture folks. If your beer list is good and reasonable -- and the average pint doesn't cost $8.50, like much of Barracks Row -- you'll capture lots of folks.

Since your place is largely outdoors, are you hoping to stay open through the fall next year? Beer, firepits and s'mores go together.


JD says: (11/12/14 3:12 PM)
(I can confirm that @the Brig speaks for The Brig)


the Brig says: (11/12/14 6:23 PM)
We hope to stay open as long as weather permits.
Yes to s'mores and fire pits.
We believe that we will be busy every day and not just Nats game days.


MJM says: (11/13/14 10:30 AM)
From the Brig to CBS Radio- L St corridor is seeing a lot of new places and construction. Wood delivered and new fencing at The Brig, Lofts well above ground, Cmty Cntr is above ground now, and 1111 NJ - can we count that as L St since their construction curb cut is on L St?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

CJBabyDaddy on Catching Up on: The initial Maxwell/Albi PR launch described their future joint location as bein...
Alex B. on CSX East Three-Building: I don't see how the canal's lack of presence reflects a lack of history. The big...
CJBabyDaddy on CSX East Three-Building: Many unexecuted plans have the advantage of being perfect in someone‘s eyes, and...
rdotis on CSX East Three-Building: Carroll Creek Park, Frederick, MD: https://www.flickr.com/photos/22711505@N05/28...
rdotis on CSX East Three-Building: The failure to take advantage of the location of the historic Washington Canal (...
Westnorth on CSX East Three-Building: All I can see on that site plan is the word "HII"
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/15/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/15/19
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19

Recent Issued Building Permits Archive  
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
419 K ST SE   
08/21/19 
FAROOQ A MITHA / null
E1910733 / SUPPLEMENTAL
100 M ST SE 20003   
08/21/19 
PARSONS / null
E1910735 / SUPPLEMENTAL
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
410 M ST SE   
09/16/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MICHAEL B. BELL; MICHAEL B. BELL
E1911625 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.