Since January, 2003
            
 (a random before-and-after moment)
February 8, 2006
March 17, 2019 
Half at N, Looking West (see more)

The fate of Forest City's planned movie theater, residential, and retail project on the east side of 1st Street near Nats Park has remained stalled while DC Water works to find a suitable spot to relocate some (but not all) of its activities.
There has been no public news of a new site, but the DC government has announced that there will be a public meeting on Nov. 20 at 6:30 pm "to receive public comments on the proposed surplus" of a portion of the DC Water site, which presumably includes all or some of the footprint of the Forest City planned development.
The meeting announcement also contains this string of caveats:
"Because DC Water will continue to occupy the Property while pre-development is ongoing, declaration of the Property as surplus will be conditioned on (i) DC Water receiving rights to occupy suitable relocation/replacement property(ies), (ii) available funding for activities necessary to allow DC Water to relocate to and operate on such relocation/replacement property(ies) and (iii) approval by an independent engineer procured by DC Water of an operational plan during and after relocation."
The meeting is at the Boilermaker Shops at 3rd and Tingey, in Unit 140 (the empty space next to Nando's). In addition, written public comments will be accepted until Nov. 25.
If you're just joining us, it was a smidge over two years ago that news first started bubbling up that Forest City was looking to bring a "high-quality theater operator" to a six-acre portion of the DC Water site. In November 2012 the potential operator was revealed to be Showplace Icon, and in 2013 the plans for the entire site went through the Zoning PUD fun factory, and were approved late in the year.
The first phase of the project, which received Stage 2 PUD approvals from the Zoning Comission, will be the movie theater, a two-story 16-screen offering, built above a four-story parking structure, located at a new intersection of N Place SE and the to-be-built 1 1/2 Place.
The rest of the project envisions two residential buildings totaling 600 units, built along 1st Street directly across from the ballpark. with the facade of the existing red brick building at the corner of 1st and N Place preserved and incorporated into one of the buildings. Potomac Avenue would be extended eastward to the new 1 1/2 Place, and Diamond Teague Park would be expanded northward. There would also be a minimum 40,000 square feet of retail.
But all of this has to wait until DC Water can find a suitable new home for some of the operations that currently live at 125 O Street SE.
It's also worth noting with each post on this project that DC Water will not be departing the site completely--the beautiful historic Main Pumping Station building will keep right on pumping, as will the less-beautiful and less-historic O Street Pumping station. In addition, earlier this year DC Water solicited bids for the design of a new headquarters building, which would bring the agency's HQ from Blue Plains to a space on top of the O Street station.
Comments (1)
   
 
 More About DC Water (WASA)

JDLand.com Home

Comments

JD says: (11/5/14 12:05 PM)
By the way, on another development subject, we had some discussion recently about progress on the Homewood Suites at 50 M. I had mentioned that I was sure that they had filed for a shoring/sheeting/excavation permit, but that I wasn't seeing it. There was indeed a glitch in the permit application database, and that application is now visible again (though not yet approved). And in the last week or two a Foundation permit has been applied for. So....

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

JD on Signage, and Not-Yet-Signage: In other news, residents of F1rst have been alerted that there is a deal for JBG...
JD on Signage, and Not-Yet-Signage: @dcgent Yup, I mentioned the trapeze school move when I wrote about the Chemonic...
dcgent on Signage, and Not-Yet-Signage: Latest move for trapeze school https://www.bizjournals.com/washington/news/2019/...
JD on Signage, and Not-Yet-Signage: @smitty Are you in the Yards? So this is referring to the part of New Jersey sou...
smitty2k1 on Signage, and Not-Yet-Signage: Just got some construction/traffic info from my building: " notified by th...
202_cyclist on Signage, and Not-Yet-Signage: I'm going to have to work on my beach bod! https://thedcline.org/2019/03/19/gro...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
4 I ST SE   
03/19/19 
null
E1905494 / SUPPLEMENTAL
150 I ST SE   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.