Since January, 2003
            
 (a random before-and-after moment)
January 23, 2007
August 20, 2016
3rd at Virginia, Looking Southwest (see more)

I fear I am going to be run ragged by the scope of construction 'round these parts over the next few years. Fitbit tells me I took about 15,000 steps across two outings to snag this slew of photos, and I still didn't quite get everything I wanted. But let's see what's going on. (As always, click on any image to enlarge it, and then page through the slideshow of all of them).
At 1015 Half Street, the new CBS Radio space along L Street is moving along, with a ticker now hung on the building (below left) and the ground-floor studio space being built out (below right).
There's four holes in the ground in various stages of construction, though alas I missed getting pictures of the Arris apartment building at the Yards, which has reached ground level and so should be starting the showy part of its progress within the next few weeks. The Lofts at Capitol Quarter are about at ground level on the east end of their not-at-all-level footprint at 7th and L (left), while digging down down down continues at 800 New Jersey/Whole Foods (right). (The third one, the new 1111 New Jersey apartment project, isn't all that much of a hole just yet.)
(Speaking of 800 New Jersey, I noticed that the rebuilt-but-not-open H Street has had its asphalt laid and is now a good nine inches or more higher than where it meets 2nd Street. Preparation for that intersection and Virginia Avenue to be bumped up with the construction of the Virginia Avenue Tunnel?)
Getting close to topping out is the Hampton Inn at 1st and N (left). And, apropos of nothing (but needed here for layout purposes), a photo of the signage for the Subway Café at 20 M Street, which sounds to not be too long from opening.
And wrapping up the tour, here are the two buildings nearest to completion, the Parc Riverside at 1st and K (left) and the Park Chelsea on New Jersey Avenue (right), seen from one block to the south because it's So Freaking Big.
Now, everyone chime in and tell me what I missed.
If you want more photos of these projects (and who wouldn't?), just follow the links to the project pages.
Comments (16)
   
 
 More Recent News

JDLand.com Home

Comments

MurphsMyDog says: (10/19/14 8:23 PM)
Hmmm...what you missed...Willie's actually opened, and the Petco Unleashed store will be opening right around the time that Harris Teeter does.


JD says: (10/19/14 8:26 PM)
Not sure I get to get dinged for that:

link



JD says: (10/19/14 9:32 PM)
(though upon reflection I will grant the ding on Unleashed, since there is visible construction progress inside)


202_cyclist says: (10/20/14 7:08 AM)
Thanks for the photos. Although it isn't construction-related, we saw the red fox yesterday afternoon sunning himself/herself next to th CSX trailer. I tried to get a photo of Mr. fox but he ran away.


202_cyclist says: (10/20/14 7:09 AM)
No photos of the neighborhood's dumbest parking lot across the street from Parc Riverside?


Alan says: (10/20/14 9:56 AM)
They've unearthed 8 tanks on the old Wendy's/Towing/Gas lot and it reeks.


JD says: (10/20/14 11:17 AM)
@202, do you mean the expanded parking lot between I and K? I had pictures of that a few weeks ago, so didn't feel the need to repeat.


202_cyclist says: (10/20/14 11:34 AM)
Indeed. I still can't understand how the owner of that lot finds that parking lot acceptable. There are light posts in the middle of the parking spaces, uneven paint strips, etc...


dbt says: (10/20/14 1:57 PM)
The art installation (several dozen casts of controversial Olympian Tommie Smith's arm) hanging in Building 170 next to USDOT?


JD says: (10/20/14 1:59 PM)
Posted it a few weeks ago. Keep up, people. :-)


SWag says: (10/20/14 4:41 PM)
JD - 3

MurphsMyDog - .5

the field - 0

you guys should know better...


JD says: (10/20/14 4:53 PM)
To be fair, the SWag scoreboard would certainly have been much worse for me if not for the rediscovery of my mojo a few months ago.


SWag says: (10/20/14 4:56 PM)
if you actually attended that Zoning Hearing, then you REALLY have it back. LOL


JD says: (10/20/14 4:59 PM)
I will NEVER have that level of mojo back again! But, really, I had retreated to watching the DCOZ webcasts long before my mojo went on walkabout.


MJM says: (10/21/14 11:38 PM)
100 Montaditos interior is nearly built out - that place should be opening soon. 8 Nov for Canal Park to go ice rink. Vet next to Vida is building out - almost looks complete.


JD says: (10/21/14 11:55 PM)
And a reader alerted me tonight that most if not all of the red brick and wrought iron fence around Yards Parcel A is down, replaced with chain link (temporarily!).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

kalicki on A Photo Tour: I generally like the style of this building, but man, the white lights on the fa...
conngs0 on A Photo Tour: Whoops! I don't know how I jumped to full replacement! Sorry! Regardless, kee...
JD on A Photo Tour: Not a hip replacement! Had to have the torn labrum repaired and the head of the ...
conngs0 on A Photo Tour: Thanks for the update, JD! I know you've been waiting for a cell phone store fo...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/18
400 B/O M ST SE   THEFT
Shoplifting
 02/21/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/18
1000 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/07/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
02/21/18 
BAKER DC / CHRISTINE LONG
AH1800618 / CONSTRUCTION
An after hours permit is respectfully requested from 5AM to 9PM daily
1331 2ND ST SE 20003   
01/29/18 
DC WATER / DAVE LEVINE
AH1800505 / CONSTRUCTION
After hours work for structure exaction and support for B1311474 DC Water. Corman Construction 202-863-0052.
1016 3RD ST SE   
02/01/18 
ANAMARIA R MOTTOLA / DAVID L. HAHN
P1803348 / SUPPLEMENTAL
1346 4TH ST SE   
02/06/18 
ALAN OWINGS / ROBERT SEV HENRY
AH1800541 / CONSTRUCTION
After Hours Permit for 2 / 19 / 18 from 7AM to 7PM to perform concrete, framing, and utility operations.
   
02/06/18 
FC 1346 LLC / RICHARD V CAREY
P1803428 / SUPPLEMENTAL
150 I ST SE   
02/05/18 
WC SMITH / null
P1803402 / SUPPLEMENTAL
140 M ST SE   
02/07/18 
SPAULDING & SLYE/STE100 / null
E1803798 / SUPPLEMENTAL
110 M ST SE   
01/29/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JAMES WEAVER
E1803534 / SUPPLEMENTAL
   
02/02/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1803361 / SUPPLEMENTAL
140 M ST SE 20032   
02/14/18 
SYLVIA LINDSEY / null
P1803641 / SUPPLEMENTAL
202 M ST SE   
01/29/18 
UNITED STATES OF AMERICA / NURI EROL
D1800281 / CONSTRUCTION
Remove Existing flooring. Remove some of the furnitures, equipment.
300 M ST SE 53533   
02/08/18 
FEDERAL CENTER LP / SPENCER TEEL
BP1801893 / POST CARD
300 M ST SE   
02/16/18 
FEDERAL CENTER LP / STEVEN MERCHANT
B1803279 / CONSTRUCTION
New Sprint store sustainable design tenant build-out in an existing building, partical first floor. Work will consist of building a new sales floor and back of the house. New work sill consist of display fixtures, ceiling, plumbing fixtures, mechanical ductwork to diffusers, interior partitions, floor finishes, outlets and new locations of electrical panels. **CHANGE IN USE, LEVEL 2 ALTERATION
401 M ST SE   
01/30/18 
DOEE C/O DEV MURALI / JESSICA REICHARD
AH1800507 / CONSTRUCTION
After hours permit to preform manhole inspections during off peak hours 7pm - 7am for all Manhole Locations covered under permit # PA10374319-R1 for DOEE Anacostia river sediment project.
861 NEW JERSEY AVE SE   
01/31/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800467 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.***TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
02/09/18 
SQUARE 742 LLC / null
P1803534 / SUPPLEMENTAL
   
02/14/18 
SQUARE 742 LLC / null
P1803681 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
02/15/18 
SQUARE 742 LLC / null
E1804057 / SUPPLEMENTAL
79 POTOMAC AVE SE   
02/21/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1805358 / CONSTRUCTION
Address revision only for B1702971 from 25 Potomac Ave SE to 79 Potomac Ave SE.
640 SOUTH CAPITOL ST SE   
02/05/18 
JIM LATISIS ZAYO GROUP
B1707197 / CONSTRUCTION
Addition to existing concrete telecom building.
401 TINGEY ST SE   
01/30/18 
PEPCO / BARBARA ANN STEDMAN
AH1800520 / CONSTRUCTION
UG TRANSFORMER WORK TO BE PERFORMED ON THE 400 BLK OF TINGEY ST SE. MANHOLE ACCESS. WORK TO BE PERFORMED BETWEEN THE HOURS OF 7:30AM AND MIGHTNIGHT ON 1 / 30 / 18 AND 1 / 31 / 18.
227 TINGEY ST SE   
01/29/18 
UNITED STATES OF AMERICA / ERICKA CLARK
TC1800021 / CONSTRUCTION
2 tower cranes
   
01/30/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1802750 / CONSTRUCTION
Revision to Permit SH1700028. Sheeting and shoring for Yards Parcel L-2 project. Revision includes 10-foot precut excavation and layback on Water Street, 3rd Street and northern L-1 elevations, and removal of upper tier of rakers at L-1 elevation and upper tier of tiebacks at the Water Street and 3rd Street elevations.
   
02/20/18 
FOREST CITY WASHINGTON / FOREST CITY WASHINGTON; DFM DEVELOPMENT SERVICES
FD1700057 / CONSTRUCTION
Yards parcel L-2. Construction of foundation and underground parking garage for new 11 story multi-family mixed used residential building at 227 Tingey Street SE as part of development of Parcel L at the Yards
325 VIRGINIA AVE SE 20003   
02/14/18 
JASON W GOLDSMITH / null
E1804039 / SUPPLEMENTAL
325 VIRGINIA AVE SE   
02/06/18 
JASON W GOLDSMITH / CRAIG HARTSOCK
B1804721 / CONSTRUCTION
Remove two non-structural walls on ground level of townhouse and re-frame in new configuration to create a full bathroom on ground floor.
   
02/07/18 
JASON W GOLDSMITH / MORIS O. OCHOA PINEDA
P1803462 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1001 NEW JERSEY AV SE   12/28/17
$ 687,365
WHATS ON SECOND PROPERTIES LLC
 


Project Directory
Completed
Agora ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row