(a random before-and-after moment)
June 9, 2004
|
May 19, 2007
|
4th at M, Looking West-Southwest ( see more)
|
|

It was announced this morning (well, last night, actually) that the 11th Street Bridge Park's design competition has been won by "Anacostia Crossing," from the team of the Office of Metropolitan Architecture (OMA) and Olin Studio. OMA/Olin designed a park in "a sloping 'X' shape" over both the river and the banks on its eastern side. Features include a central plaza, a café, boat launches, an amphitheater, and "a series of nets that would allow people to dangle out over the river." One competition juror described the design thusly: " 'It is at once both a crossing and place. In its purest role it is a hyphen that connects and celebrates the physical and cultural histories of two historic and vibrant Anacostia shoreline communities, while establishing a civic expression of democracy.' "
As always, however, the looming question remains the full funding of the park's $40 million price tag. As explained by the Post, "The D.C. government has committed to providing $14.5 million of the $25 million construction price tag[.] An additional $15 million would provide operations funding." A capital campaign is underway to fund that $25 million difference. So, needless to say, construction won't be starting next week.
JDLand.com Home
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2017 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and an unnamed 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
Square 769N Apts
Mixed-income rental building with 179 units, including 36 public housing units. Underway early 2017.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
2 I St.
1st-phase 380-unit apartment building, on old McDonald's site. Construction underway early 2017.
1250 Half St.
445 residential units in two phases, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, delivery 2018. Circa and Open Road expected tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/Parcel L Residential and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
1000 1st St. Residential
275-unit residential building, by Paradigm. Construction underway early 2018.
71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail. Digging underway April 2018.
JDLand.com's Official Unofficial Guide, Updated for 2018!
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| SEX ABUSE
First Degree Sexual Abuse
| 04/17/18
|
400 B/O M ST SE
|
| THEFT
Shoplifting
| 04/17/18
|
100 B/O K ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 04/17/18
|
UNIT B/O N ST SE
|
| ROBBERY
| 04/14/18
|
100 B/O I ST SE
|
| THEFT
Theft 2nd Degree (theft From Building)
| 04/12/18
|
UNIT B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 04/12/18
|
1200 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 04/09/18
|
150 B/O L ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 04/07/18
|
1000 B/O 3RD ST SE
|
| BURGLARY
Burglary One
| 04/07/18
|
1200 B/O NEW JERSEY AVE SE
|
| ROBBERY
Assault W/i To Commit Robbery (simple Assault)
| 04/05/18
|
UNIT B/O K ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 04/01/18
|
1100 B/O NEW JERSEY AVE SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 03/31/18
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (theft From Building)
| 03/28/18
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (theft From Building)
| 03/28/18
|
300 B/O I ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 03/25/18
|
UNIT B/O L ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 03/23/18
|
100 B/O K ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 03/23/18
|
UNIT B/O I ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 03/23/18
|
|
Recent Issued Building Permits
| Archive
|
|
1331 2 ST SE
|
|
04/02/18
DISTRICT OF COLUMBIA / MARK HARLOW CLIFFORD
SB1800225 /
CONSTRUCTION
Application for Well Abandonment Workplan Approval for the abandonment of 8 monitoring wells and 21 inclinometers at the Main Pumping Station site for the DC Water Clean Rivers Project, Division I, installed under Permit Number SB1400419.
|
1100 2ND PL SE
|
|
04/19/18
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801710 /
SHOP DRAWING
Install 1 New G2S 3500LBS @350FPM, Elevator 2; 13 Floors
|
|
|
04/19/18
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801712 /
SHOP DRAWING
Install 2 New G2S Elevators - 3500LBS@35FPM Elevator 1, 12 Floors
|
1331 2ND ST SE 20003
|
|
04/05/18
DC WATER / DAVE LEVINE
AH1800744 /
CONSTRUCTION
After Hours work for structure excavation in support of DC Water, Corrman Construction 301-343-5417.
|
1300 4TH ST SE
|
|
04/17/18
null / DONNA G GRAHAM
AH1800863 /
CONSTRUCTION
WR #3476633-WARD 6-20003-VAETH / BRUNO - PEPCO CREWS WILL BE WORKING THE 1200 - 1300 BLK OF 4TH ST SE - INSTALLING NETWORK TRANSFORMER AND INSTALLING PRIMARY CABLES - STARTING THURSDAY 4 / 19 / 18 UNTIL 5 / 19 / 18 - MONDAY THRU FRIDAYS AT 10PM UNTIL 10AM AND ON SATURDAY AND SUNDAYS FROM 6AM TIL 8PM.
|
1346 4TH ST SE
|
|
04/10/18
ALAN OWINGS / ROBERT HENRY
AH1800796 /
CONSTRUCTION
After Hours Permit for 04 / 16 / 18 from 9AM to 7PM to perform facade, interior unit framing and drywall work, and interior Mechanical, Electrical, Plumbing and Sprinkler Rough-In.
|
1346 4TH ST ST SE 20003
|
|
03/28/18
FOREST CITY / TYLER D BARRON
AH1800712 /
CONSTRUCTION
After hours for 4 / 13 / 18 to 5 / 12 / 18. Work that is to be done is quiet work of window deliveries at 5:30AM to 7:00AM by use of tower crane
|
82 I ST SE
|
|
04/02/18
GDVC EYE STREET LLC / null
FB1800055 /
SUPPLEMENTAL
|
150 I ST SE
|
|
03/28/18
null
E1805313 /
SUPPLEMENTAL
|
|
|
03/29/18
null / JOHN THOMSON 3018645080
E1805337 /
SUPPLEMENTAL
|
300 M ST SE 400
|
|
04/09/18
FEDERAL CENTER LP / null
M1801970 /
SUPPLEMENTAL
|
300 M ST SE STE# 400 20024
|
|
04/05/18
CHARLES SMITH / EUGENE AHNS 3012811497
E1805597 /
SUPPLEMENTAL
|
300 M ST SE STE# 400
|
|
04/12/18
FEDERAL CENTER LP / null
P1805161 /
SUPPLEMENTAL
|
140 M ST SE
|
|
03/26/18
SQUARE 742 LLC / null
P1804630 /
SUPPLEMENTAL
|
300 M ST SE
|
|
03/26/18
FEDERAL CENTER LP / JERRY BETHEA
M1801846 /
SUPPLEMENTAL
|
401 M ST SE
|
|
04/03/18
TETRA TECH C/O DOEE / JESSICA REICHARD
AH1800767 /
CONSTRUCTION
After hours permit for manhole access to complete inspections for DOEE Anacosta River Sediment clean up project, work hours between 7pm and 7am Monday thru Friday. Rolling work zones for all manhole access under permit # PA10374319-R1
|
800 NEW JERSEY AVE SE
|
|
04/05/18
SQUARE 737 LLC / null
P1804974 /
SUPPLEMENTAL
|
|
|
04/09/18
SQUARE 737 LLC / null
E1805700 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
04/02/18
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800715 /
CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
|
|
|
04/11/18
CONSOLIDATED RAIL CORPORATION / DEVIN MURDOCK
SB1800265 /
CONSTRUCTION
Drill 8 borings to 40ft. Convert 4 borings into 1" temporary wells, collect groundwater from each well and abandon borings.
|
1100 NEW JERSEY AVE SE
|
|
04/18/18
null
E1805988 /
SUPPLEMENTAL
|
1115 NEW JERSEY AVE SE
|
|
04/17/18
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / GARY BRENT; BRENT
SG1800260 /
CONSTRUCTION
Install 1 illuminated wall sign, 1 illuminated window sign and 1 window vinyl decal sign - Peets Coffee
|
1100 NEW JERSEY AVE SE 5TH FL
|
|
04/19/18
SQUARE 742 LLC / DOMINIC E TOTARO 301-725-1998
M1802089 /
SUPPLEMENTAL
|
1100 NEW JERSEY AVE SE
|
|
04/13/18
SQUARE 742 LLC / CLIFFORD DIXON
B1804348 /
CONSTRUCTION
INTERIOR RENOVATIONS TO OFFICE SPACE ON THE 5TH FLOOR.
**DEMOLITION, LEVEL 2 ALTERATION
|
|
|
04/19/18
SQUARE 742 LLC / PEDRO C. CASTILLO 3019219056
E1806025 /
SUPPLEMENTAL
|
|
|
04/19/18
SQUARE 742 LLC / null
E1806015 /
SUPPLEMENTAL
|
1115 NEW JERSEY AVE SE
|
|
04/06/18
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ACCUPERMIT LLC AS AGENT
B1803009 /
CONSTRUCTION
Interior alterations for new tenant in existing commercial space to include partitions, mill work, electrical and plumbing fixtures, flooring and wall coverings, dining area furniture and kitchen equipment for a A-2 restaurant with 49 proposed occupancy.
|
125 O ST SE
|
|
03/29/18
DISTRICT OF COLUMBIA / JAMES M. HALLER
P1804624 /
SUPPLEMENTAL
|
|
|
04/09/18
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801762 /
SHOP DRAWING
I New G2S Elevator - 3500LBS @ 200FPM (7 Floors)
|
|
|
04/09/18
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801763 /
SHOP DRAWING
Install 1 New G2S Elevator - 3500LBS @ 200FPM (6 Floors)
|
|
|
04/09/18
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801761 /
SHOP DRAWING
Install 1 New G2S Elevators 4000LBS @ 200FPM (7 Floors)
|
71 POTOMAC AVE SE 20002
|
|
04/19/18
null / STEVE GRIFFIN
BP1802939 /
POST CARD
|
71 POTOMAC AVE SE
|
|
03/26/18
FORIDA ROCK PROPERTIES INC / null
BCIV1800074 /
CONSTRUCTION
This permit is for rough grading and erosion and sediment control civil work associated with the temporary parking lot, relocation of the dog park and construction staging area on the undeveloped portion of the lot.
|
|
|
04/17/18
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
FD1800020 /
CONSTRUCTION
Foundation only for new residential building
|
227 TINGEY ST SE
|
|
03/28/18
UNITED STATES OF AMERICA / ERICKA CLARK
AH1800760 /
CONSTRUCTION
significant concrete pours and tower crane erection
5AM - 7AM and 7PM - 10:00PM
|
|
|
04/12/18
UNITED STATES OF AMERICA / STEPHEN J. EXELBERT
P1805022 /
SUPPLEMENTAL
|
300 TINGEY ST SE
|
|
04/12/18
MERCURY LLC / WILL TEASS
B1803433 /
CONSTRUCTION
INTERIOR FIT-OUT / EXTENSION OF EXISTING TENANT SUITE (APPROVED UNDER B1605215) INCLUDING NEW MECHANICAL AND ELECTRICAL WORK.
**LEVEL 2 ALTERATION
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|