Since January, 2003
            
 (a random before-and-after moment)
February 16, 2006
May 19, 2019 
1st at K, Looking West-Southwest (see more)

Having gotten out of the way the vertical construction going on behind neighborhood fences, we can now move on to the "clearing" portion of this fence survey.
The roof of Nats Parking Garage C gives a great view of Yards Parcel A, and how far the site clearing has come along since the final days of Spooky Building 213.
Next up will be the creation of a park on the far end of the site, a parking lot in the corner closest to this intersection, and the new home for Trapeze School New York at far right. (Here's a map if that's too many words.)

Meanwhile, along New Jersey Avenue....
(Left) This isn't my best work, but you can compare the rubble in this photo to the lush grass-covered hill that used to run along New Jersey Avenue between L and M. All this dirt is being moved to build the 324-unit Gallery at Capitol Riverfront residential building, aka 1111 New Jersey Avenue.
(Right) Up in Whole Foods land at 800 New Jersey Avenue, the hole is still being dug. But the new block of H Street between New Jersey and 2nd is looking like a real street, though no doubt it will continue to taunt us by remaining closed throughout the construction of 800 NJ, like its sibling I Street a block to the south has sat unopened, waiting for the Park Chelsea construction to finish.

Next, do you like construction trailers? How about construction trailers on sites where work isn't yet underway?
(Left) Here's the Capper Community Center site at 5th and K, where a ceremonial groundbreaking a few weeks back was not quite enough to jolt the project into action.
(Right) Looking down upon the vast Florida Rock footprint from the ballpark, and noting the new construction trailer visible at the far end. As I mentioned a few days ago, there's not as yet been an announcement of construction financing for the planned first-phase 350-unit apartment building, nor are the initial necessary building permits approved.
Comments (2)
   
 
 More Recent News

JDLand.com Home

Comments

conngs0 says: (9/30/14 9:35 AM)
Any idea if the Parcel A site be ready in time to allow the Trapeze School to transition immediately from its current site when their permission to use that space expires at the end of the year? Perhaps I've just gotten jaded by the slow progress of almost every other project in the development, but 90 days seems a little quick to pull this together despite the fact that a parking lot, park and makeshift tent are all quite simple to construct. Regardless, I'm excited to see how this all turns out.


JD says: (9/30/14 9:38 AM)
I don't know for sure--but yeah, it shouldn't take that long to create at least the parking lot and the base for the trapeze site. (Park might take a little longer.)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

JD on Nom News: It will be the return of Congressional Cleaners (the place that used to be at Ca...
GarfieldPark on Nom News: Good news for I and NJ Ave residents: signs on door of I ST space has a dry clea...
conngs0 on Nom News: I agree that it's strange that the senior center appears untouched (perhaps work...
walt on Nom News: Anybody have an update on the reconstruction for the Senior Center? It's nice ...
JD on Nom News: I confirmed with Commander Kane that the first report had the wrong time.
Lambau88 on Nom News: *11:30pm, not 10:30pm. But still...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/17/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 05/17/19
1100 SOUTH CAPITOL ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 05/16/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/15/19
300 K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/14/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/19
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/11/19
200 B/O K ST SE   ROBBERY  05/11/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/01/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/29/19
1500 B/O SOUTH CAPITOL ST   THEFT
Theft First Degree (theft From Building)
 04/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/23/19
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/23/19
1100 B/O 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  04/22/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/22/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
04/30/19 
CBRE / HELEN M MAPPLEBECK
TL1900080 / CONSTRUCTION
First generation finish out of Suite #100 at Square 769N Building, first floor for a 1,374 SF hair salon
   
05/17/19 
CAPPER 769N CONDOMINIUM / WILLIAM J. ANDERSON
P1906344 / SUPPLEMENTAL
1331 4TH ST SE CU   
05/01/19 
FC 1331 LLC / BEN BEDDO; BEN BEDDO
SG1900282 / CONSTRUCTION
INSTALL WALL MOUNTED BLADE SIGN WITH EXTERNAL ILLUMINATION. SIGN DOES NOT ENCROACH PUBLIC SPACE.
   
05/09/19 
FC 1331 LLC / BEN BEDDO
B1908465 / CONSTRUCTION
INSTALLATION OF RESTAURANT SUMMER GARDEN WITHIN PROPERTY LINE.
1331 4TH ST SE R-2   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906870 / SUPPLEMENTAL
   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906871 / SUPPLEMENTAL
1017 4TH ST SE   
05/17/19 
MIKE MORAWSKI / KYLE YOST; KYLE YOST
SOL1901148 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
1346 4TH ST SE   
04/26/19 
FC 1346 HOLDCO I LLC / JAMES CRONENBERG
TL1900035 / CONSTRUCTION
TENANT LAYOUT NEW RESTAURANT ON GROUND FLOOR TENANT SPACE, IN EXISTING MIXED-USE BUILDING (5,024 SQ. FT. TENANT) NO CHANGES TO BUILDING EGRESS SYSTEM. NO CHANGES TO BUILDING FOOTPRINT. NO CHANGES TO BUILDING STRUCTURE.
150 I ST SE   
05/21/19 
WILLIAM C SMITH CO / null
E1907650 / SUPPLEMENTAL
250 M ST SE   
05/20/19 
SWUARE 769 LLC / PATRICK B. MCATEER
P1906137 / SUPPLEMENTAL
   
05/20/19 
SQUARE 769 LLC / CHRISTOPHER J. PETRAKES
M1902543 / SUPPLEMENTAL
880 NEW JERSEY AVE SE   
04/29/19 
880 NEW JERSEY AVE LLC / null
M1902401 / SUPPLEMENTAL
   
05/02/19 
880 NEW JERSEY AVENUE LLC / null
M1902440 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH FL 20590   
05/13/19 
JBG/FEDERAL CENTER LLC / null
P1906172 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH 20590   
05/01/19 
JBG/ FEDERAL CENTER LIC / null
P1905855 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
05/02/19 
SQUARE 742, LLC / SAM HOLLEN; NA
B1909008 / CONSTRUCTION
INTERIOR RENOVATION TO 6TH FLOOR OFFICE SPACE. DEMISING PARTITIONS, FURNITURE, MECHANICAL , ELECTRICAL AND LIFE SAFETY. 980 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY
1200 NEW JERSEY AVE SE 20590   
05/09/19 
JBG/FEDERAL CENTER LLC / CARLOS E. MONTES
P1906111 / SUPPLEMENTAL
79 POTOMAC AVE SE   
05/08/19 
RIVERFRONT HOLDINGS I LLC / null
E1907222 / SUPPLEMENTAL
227 TINGEY ST SE   
05/10/19 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
B1909472 / CONSTRUCTION
First Extension to B1801871, to Expire on 11 / 25 / 2019. Original Scope: Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR. 6-month extension of permit B1801871.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.