Since January, 2003
            
 (a random before-and-after moment)
January 19, 2003
June 16, 2018
3rd at M, Looking South (see more)

Does everyone want some more Half Street news? Last night's Monument Realty news about the east side of the street isn't enough for you? Are you tapping your toes, wanting to know when the shipping containers are going to disappear from the other side of the street?
The Washington Business Journal, having now heard the same rumors I heard a few weeks ago (hence my sneaky comment in my Monument post about "whether Akridge is currently making any moves"), is reporting that Akridge is working to market its Half Street project to potential investors, with the company needing to replace a capital partner "that desires to leave the project." WBJ says that Akridge "expects to have some closure on a new partner by the fourth quarter," and that "All forms of transaction are on the table."
Akridge has been planning since 2008 to build two office buildings, a residential building, and 55,000 square feet of retail on the west side of the street. Whether those plans will stay the same once capital is found, well, We Shall See.
Comments (3)
   
 
 More About West Half St.

JDLand.com Home

Comments

202_cyclist says: (9/15/14 1:03 PM)
This is off-topic but I still am amazing about what a poor job they did with the construction of the new parking lot at First and I Street SE. Aside from taking 5-6 months for something that should have taken about a week and missing most of the Nationals season. the light posts look like they've now been installed in the middle of some of the parking spaces.


202_cyclist says: (9/16/14 10:51 AM)
Of possible interest-- the DC chapter of the American Institute of Architects is holding a reception and exhibit for the 11th Street bridge proposals on Sept. 29. To attend, you have to register beforehand for this event.

link


JD says: (9/16/14 11:11 AM)
Yup, which was going to be the subject of a post on about Sept. 23. But maybe now you ruined it for the whole class. ;-)


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

Alex B. on Transportation Study Meeting: That rendering of Walters seems a bit misleading, as it would imply a two story ...
caphillguy on Transportation Study Meeting: For everyone's information: the intersection at Virginia Ave and 7th Street was ...
JD on Transportation Study Meeting: Some details on Walters Sports Bar, still planning on coming to the space below ...
202_cyclist on Transportation Study Meeting: Exciting news folks! It looks like there was soil testing today for the former ...
CJBabyDaddy on Transportation Study Meeting: @RMP & @jdc: Sign on the front door says: “We are waiting on some officia...
conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/15/18
200 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/13/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18

Recent Issued Building Permits Archive  
1300 4TH ST SE 1ST FL   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902414 / SUPPLEMENTAL
1300 4TH ST SE   
12/11/18 
PARCEL O 1-LLC / N/A
B1900015 / CONSTRUCTION
Yards Parcel O1 - Revision to Base Building Permit B1609947 to incorporate minor design changes including converting a residential unit to a fitness center. TPR
1300 4TH ST SE B1   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902413 / SUPPLEMENTAL
1331 4TH ST SE CU   
12/10/18 
FC 1331 LLC / null
P1902045 / SUPPLEMENTAL
1300 4TH ST SE PENTHOUSE   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902412 / SUPPLEMENTAL
1300 4TH ST SE   
12/10/18 
PARCEL O-1 LLC / RICHARD V CAREY 301-424-8899
FB1900032 / SUPPLEMENTAL
(2) NEW INSTALL Gross 1,840,000 BTU / HR Natural Gas HW
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
12/11/18 
UNITED STATES OF AMERICA / null
E1902394 / SUPPLEMENTAL
   
12/11/18 
UNITED STATES OF AMERICA / BRANDON WILSON; BRANDON M WILSON
B1902777 / CONSTRUCTION
Kitchen Area: -Interior only Frame about 7lf around one column as per 2 / A030 -Add 260 SQF bulkhead as per 1 / A030 None Load bearing wall on first floor and second floor.. M,E,P, will be provided on another permit. IT Lounge -Add 194 SQF bulkhead as per 3 / A030
2 I ST SE   
12/10/18 
MCDONALDS CORPORATION / KIM MITCHELL
B1814290 / CONSTRUCTION
The submitted drawings are a revision to those approved under building permit #B1703907, and include the incorporation of a new corridor connection at the roof level between phase 1 and phase 2 buildings, and corresponding revisions. Revised Mechanical / Plumbing / Electrical drawings are included to reflect the change of Engineers of Record. Interior Design Drawings are also included. Various...
   
12/14/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
AH1900295 / CONSTRUCTION
Dismantle of tower crane. Minimal noise impact and required for reduction on impact to traffic.
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
   
12/13/18 
RIVERFRONT HOLDINGS LL, LLC / PARKER HARRELL
SB1900071 / CONSTRUCTION
Abandoning 20 temporary wellpoints and 3 gravel packed wells originally installed for dewatering during construction.
79 POTOMAC AVE SE   
12/13/18 
RIVERFRONT HOLDINGS I LLC / null
E1902479 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.