Since January, 2003
            
 Page Through from Before to After

Washingtonian is reporting that Korean fried-chicken chain Bonchon is coming to the neighborhood next year, in a 200-seat space that ANC Commissioner David Garber says is going to be in the 1015 Half Street building two blocks north of Nationals Park.
Quoting: "The menu will mostly mirror Arlington’s (here’s a sample), with a focus on spicy and soy-garlic fried chicken, plus Korean specialties like pork buns and bulgogi. ... [Y]ou'll find a spacious bar for pre-and-post game gatherings. A list of 16 craft beers, both domestic and Asian, are in the works, plus a specialty cocktail menu. Takeout, delivery, and catering services are also planned, as well as reservations for large parties."
Washingtonian says that the space is being designed by GrizForm, which also worked on Bluejacket and Agua301. There are also plans are an outdoor patio. (UPDATE: The restaurant will apparently occupy ground-floor space on the L Street side of the building.)
The building housing the new venture is the one that stood empty for many moons before the announcements earlier this year that the National Labor Relations Board will be moving there, as will CBS Radio. That a restaurant is going into the building at all is a bit of a surprise, since the retail spaces were always a somewhat wishy-washy subject.
Comments (10)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

JES says: (9/3/14 2:29 PM)
I always envisoned the CBS Radio "street-facing" studio to be on that frontage. Where's that gonna go?


JD says: (9/3/14 2:31 PM)
I don't know where the CBS Radio space is going to be, but I imagine there's room for both along L. It's a big building.


202_cyclist says: (9/3/14 3:49 PM)
What is the status of the Big Stick restaurant? I think I saw a stop work order the other day.


JES says: (9/3/14 4:44 PM)
I dunno about Big Stick, but I did see people working on the interior of Willie's again yesterday. So maybe that's back on track.


ZoolanderANDtheBoYz says: (9/3/14 5:22 PM)
The other day someone tweeted that Willie's will open in 30 days.
I am super excited about Bonchon Korean #drummers # wings fly fly chicken baby.


ZoolanderANDtheBoYz says: (9/3/14 5:35 PM)
@ 202_cyclist the Big Stick restaurant is on hold to plan how they will solve their future competition with Bonchon Korean. Check out "It is always Sunny in Philadelphia: Season 3 episode 6(The Gang solves the North Korea Situation). It is hilarious.


conngs0 says: (9/4/14 11:24 AM)
If Willie's manages to open in thirty days (i.e. after the completion of yet another regular baseball season), that would be pretty consistent with the events that must have led to its umbrella company winding up in Chapter 11 proceedings. What a tremendous opportunity missed. I'll remain skeptical until the moment the doors open. Nevertheless, I'd be thrilled if it got up and running.

As for Bonchon, I'm not sure if I understand the mass appeal, but sure, who doesn't like fried chicken on occasion?


JES says: (9/4/14 12:47 PM)
I remember hoping that Willie's would be open last year by the end of football season. Now I'm hoping that it'll be open THIS year by the end of football season (love spending NFL Sundays at sports bars).


JD says: (9/4/14 3:33 PM)
A bit of clarity on 1015 Half's ground floor plans, from people in the know....:

Bonchon will take just about all of the L Street frontage. (So this is place is a'gonna be big.)

CBS Radio will have the "performance studio" we've heard about on K Street, on the end of the building closer to South Capitol. (Their actual studios and office space will be on the 2nd floor.) They've already got the building permits approved for the performance studio, and it is supposed to be completed before the company moves into the building.

That leaves about 6,000 sq ft of retail space on K still available to lease, for a restaurant or any retailer interested.

(And I took some grief from some CRE quarters via e-mail this morning over my retail/"wishy washy subject" comment at the end of the post. I was remembering back to when Opus East would hem and haw and mumble every time I asked if they were going to do retail. And I hadn't ever seen Retail For Lease signs in any of the windows at 1015 Half. But they sure showed me! :) )



Alan says: (9/8/14 11:17 AM)
Re Big Stick. Full work crew there this AM. I know that they aren't allowed to work on the site during 'normal business hours' as part of their deal with the building because of noise affecting people above the site.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on I'm Dreaming of: I posted the link partly because I'm a Detroiter. Folks in SE are championing De...
jdc on I'm Dreaming of: Love the grandma slices at Wise Guys. And being from MI too, I also love Buddy's...
VelocityChris on I'm Dreaming of: The description and picture of the Detroit-style pizza sounds/looks just like th...
JD on I'm Dreaming of: Longtime readers may remember the many trips with Mr JDLand to Michigan, where h...
dcgent on I'm Dreaming of: Detroit-style pizza coming to undisclosed navy yard location https://dc.eater.c...
Westnorth on I'm Dreaming of: XO sauce is fish-based, as with many Cantonese sauces: https://en.wikipedia.org/...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.