These are all items I had hoped to write about more fully, but at this point I'd better just pass them along.
* FLORIDA ROCK: MRP Realty is now in control of the land at the Florida Rock site that will become the 350-unit apartment building that is the first phase of RiverFront on the Anacostia. A $65 million loan is expected to be finalized soon, and the developers say that the project will "commence construction by late summer 2014." (WBJ)
* BEVY OF PERMITS: If you browse the teeny type in the right margin of the JDLand home page, you'll already know that building permits have been approved in the past few weeks for the apartment projects at 1111 New Jersey and 1331 4th Street (aka Parcel N at the Yards, aka Arris). A tenant layout permit has also been approved for CBS Radio's first-floor performance studio at 1015 Half Street. Also, fresh off its zoning approvals, developers of the Homewood Suites at 50 M have filed for shoring/sheeting/excavation permits.
* LATEST ON 1333 M: Late last year plans were filed with the Zoning Commission for a three-building, 673-unit residential project on M Street east of the 11th Street Bridges. After some delay, a Dec. 1 hearing date has been set, and WBJ takes a look at recent filings, including some new renderings.
* THE YARDS, ONE PIECE AT A TIME: "Rather than purchase all 42 acres up front, Forest City buys each parcel from the General Services Administration as it is ready to build. The latest: The $28.37 million acquisition of 1331 Fourth St. SE, site of the 327-unit Arris apartment project." Total land costs so far across the Yards? $46 million. (WBJ)
* TUNNEL LATEST: With a council hearing about the project coming on Aug. 26, the Federal Highway Administration has postponed its final decision on the Virginia Avenue Tunnel until at least Sept. 15. But the delay is affecting residents and businesses. (WaPo)
* SCHOOL BOUNDARIES: The planned reopening of Van Ness Elementary next year passes another milestone, as its boundaries get included in the city's revamped map, released earlier this week. The final boundaries cross into Southwest south of M Street, shifting some students over to Van Ness from Amidon-Bowen, "to better align school building capacity with population and with boundary participation rates, and to support racial/ethnic and socioeconomic diversity, where possible." (WaPo)
Comments (3)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (8/24/14 9:11 AM)
I don't know if it there is any significance for this but on Friday I saw some workers clearing debris, including metal pipes, at the vacant lot across from the car wash and the McDonalds.


JD says: (8/24/14 9:34 AM)
Certainly not anything like the sudden start of a 13-story apartment building without a lick of approved building permits, announcements of multimillion-dollar financing deals, etc. etc.



202_cyclist says: (8/26/14 10:35 AM)
It looks like demolition has started for the church at the corner of the 1111 NJ Ave parcel.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Catching Up With: Wow! Big news week. Does anyone know specifically where the two new restaurants ...
202_cyclist on Catching Up With: 1) Kurt Suzuki is coming back to the Nats. We finally have a catcher who can hi...
JD on Catching Up With: Via Meredith Fascett, the long-awaited Navy Yard transportation study is finally...
Westnorth on Catching Up With: WBJ reporting that Chemonics, a contractor for USAID etc., is going to anchor th...
dcgent on Catching Up With: Rising Stars Chef Michael Rafidi and Sommelier Brent Kroll Will Open a Restauran...
dcgent on Catching Up With: Some more restaurants coming https://www.washingtonian.com/2018/11/19/two-of-dcs...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/13/18
150 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/18
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/09/18
700 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 11/09/18
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/08/18
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/07/18
800 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/30/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/18
50 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
100 B/O O ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
1400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/26/18
100 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 10/23/18
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/23/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/22/18

Recent Issued Building Permits Archive  
1013 4TH ST SE   
11/05/18 
EVA WALTER / KYLE YOST
SOL1900066 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
11/07/18 
EVA WALTER / null
E1901297 / SUPPLEMENTAL
1346 4TH ST SE   
11/01/18 
ALAN OWINGS / ROBERT HENRY
AH1900133 / CONSTRUCTION
After Hours Permit for 11 / 12 / 2018, to perform construction work with the below activities: Interior Operations: 7AM-7PM Exterior Operations: 9AM-7PM
1000 5TH ST SE   
10/31/18 
UNITED STATES OF AMERICA / JOY WILDER
B1901427 / CONSTRUCTION
Non Construction permit to change load for current Child Development Center with 26 children 3 to 6 years old +3 Staff to Child Development Center with 30 Children + 3 Staff.
   
11/16/18 
UNITED STATES OF AMERICA / BRANDON M WILSON
BP1900670 / POST CARD
2 I ST SE   
11/05/18 
CRESCENT CAPITAL VIEW / CASSANDRA MOSLEY
AH1900160 / CONSTRUCTION
Installation of wet utility services to the new building at 4 I Street SE including fire service, domestic service, and storm sewer.
   
11/14/18 
MCDONALDS CORPORATION / JUSTIN BISHOP
SP1800022 / CONSTRUCTION
Construct a 614 sqft in-ground, concrete swimming pool. All MEP, decking, and fencing work to be done under separate permit.
10 I ST SE   
10/24/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900026 / CONSTRUCTION
Relocating existing freestanding sign
   
11/14/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900075 / CONSTRUCTION
revision to existing approved sign permit SG1900026 Change to the footer only
110 I ST SE   
11/06/18 
null
E1901238 / SUPPLEMENTAL
200 I ST SE 20009   
10/25/18 
DISTRICT OF COLUMBIA / null
M1900267 / SUPPLEMENTAL
200 I ST SE   
11/05/18 
GOVERNMENT OF THE DISTRICT OF COLUMBIA / null
E1901223 / SUPPLEMENTAL
   
10/25/18 
DISTRICT OF COLUMBIA / CLIFFORD DIXON
B1809410 / CONSTRUCTION
DGS OCTO BUILDING...NEW GENERATOR ON THE ROOF WITH ASSOCIATED MECHANICAL
   
11/07/18 
DISTRICT OF COLUMBIA / DANIEL MCGUIRE
P1901098 / SUPPLEMENTAL
300 M ST SE 8TH FL   
10/24/18 
FEDERAL CENTER LP / ALFRED JORDAN 2024375067
E1900838 / SUPPLEMENTAL
130 M ST SE   
11/09/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / RICHARD PLUMLEY
P1901176 / SUPPLEMENTAL
250 M ST SE   
11/07/18 
WCSMITH - BRIAN STROTT / GEORGE ARTHUR KING
SB1900025 / CONSTRUCTION
Drill and construct two 2 inch diameter observation wells 42 feet below existing grade utilizing mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulation.
400 M ST SE   
11/02/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1901156 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
10/31/18 
CONSOLIDATED RAIL CORPORATION / BRANDON KNAPP
AH1900131 / CONSTRUCTION
Work in the public ROW with the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, concrete structure, paving, and site restoration construction activities.
   
11/07/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1900023 / CONSTRUCTION
Per Work Plan, Geotechnical Investigation, dated October 18, 2018 (see attached), the work involves drilling 12 soil borings using a HSA rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 80 to 150 ft. Borings will be properly backfilled after completion.
1100 NEW JERSEY AVE SE   
11/16/18 
SQUARE 742 LLC / IAN AND LEON COMMUN-ET LLC
B1901037 / CONSTRUCTION
EXISTING CONDITIONS TO BE DEMOLISHED AND NEW OFFICE SPACE BUILT TO TENANTS STANDARDS. OFFICE CONSISTS OF OPEN OFFICE AND PRIVATE OFFICES WITH SUPPORT AREAS. SUPPORT AREAS INCLUDE BREAK ROOM / PRODUCTION ROOM COMBINATION, SERVER ROOM WITH DEDICATED A / C, MOTHERS / WELLNESS ROOM AND CONFERENCING.
1111 NEW JERSEY AVE SE   
10/25/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900860 / SUPPLEMENTAL
   
11/05/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL B. BELL
E1901199 / SUPPLEMENTAL
125 O ST SE   
11/14/18 
DISTRICT OF COLUMBIA / CARL LAVENDT 2408821268
E1901525 / SUPPLEMENTAL
300 TINGEY ST SE STE# 140   
11/13/18 
FC BOILERMAKER LLC / ANTHONY DIRENZO
E1901464 / SUPPLEMENTAL
227 TINGEY ST SE   
11/01/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900141 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete fa├žade panels. Work to take place 7PM to 7AM, 11 / 5 through 12 / 5.
300 TINGEY ST SE   
11/05/18 
FC BOILERMAKER LLC / DREW PEISHEL; JOHN RANOUS
B1813340 / CONSTRUCTION
Minor interior tenant improvment including building one non-load bearing partitiion wall adding millwork fixtures including cash desk, fitting rooms. No Structural work. Some electrical updates. **LEVEL 2 ALTERATION
   
11/08/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1901337 / SUPPLEMENTAL
   
11/16/18 
FC BOILERMAKER LLC / ANTHONY L HARRISON
E1901597 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.