Since January, 2003
            
 (a random before-and-after moment)
April 23, 2004
June 16, 2018
2nd (East) at K, Looking East (see more)

Materials filed with the Zoning Commission earlier this month are giving a first glimpse at JBG's plans for 1244 South Capitol Street, on the northeast corner of South Capitol and N, just across from Nats Park's Parking Lot C.
It will be a residential building with 290ish units and about 26,000 square feet of retail, and the renderings indicate that the design by architect Eric Colbert and Hariri Pontarini isn't a "typical" Washington DC box-like building. Images show the building's west side, facing South Capitol Street, with only six floors of height at its middle, allowing the interior courtyard to be open to South Capitol from the 6th floor on up, breaking up the pure U-shape that is so often employed 'round these parts. A few more views (click to enlarge):
At left is a stylized version of the view that you'd see standing at Van Street one block west of the Center Field Gate, looking toward the big self-storage building and points to the northwest. At right is a closer view of the South Capitol Street facade and the courtyard, upper floors, and roof. (Note that in these three drawings you can see hints of Akridge's proposed Half Street residential building on the perimeter, though that's not appearing to be getting underway anytime soon.)
The 26,000 square feet of retail will of course warm the hearts of stadium-goers, and the filing indicates that the retail spaces will wrap around on three sides of the building. This rendering depicting the corner of South Capitol and N (with a certain dome in the distance) shows two stories of retail along both streets, with more ground-floor spaces designed along Van Street.
There would be 176 parking spaces on three levels below ground for vehicles and and 100 spaces for bikes. Residential units would range from studios to 2 BR/den. The courtyard and 6th-floor open space would have plantings and seating areas, while the roof would have a pool, lounge areas, and a bocce court (!). These plans also show "rooftop dining" at the far northwestern corner. (And will residents be able to sneak a peek at games while hanging out poolside? The image up top seems to show an angle for that to work, but it's hard to tell if the entire field would be visible.)
The design will get its Capitol Gateway Overlay District Review hearing on November 13, and it will be interesting to see how the Zoning Commission members react to the design.
Comments (5)
   
 
 More About 1221 Van

JDLand.com Home

Comments

conngs0 says: (8/20/14 3:39 PM)
Looks great. Thanks for the update, JD!

For a second, I thought this was the site of Akridge's Half Street parcel, but fortunately a quick reference to your handy map showed me that the Fairgrounds will continue to exist... Thank goodness.


JD says: (8/20/14 4:20 PM)
{{scurrying to update map with rendering and correct new info}}



JD says: (8/21/14 1:22 PM)
Totally off-topic, and knowing that there are a very few number of people reading this.... Anyone out there conversant in Canon DSLRs and lenses?

The official JDLand camera since 2008 is starting to show its age (the shutter button is showing ever-slower response time) and while I can ship it off to Canon to get fixed I admit I'm also starting to covet one of the highest-end cameras.

But I have the 50D, which while not a Rebel is still a notch below the 70D that I'm looking at--and apparently the 18mm lenses I use to shoot pretty much every photo in the 'Hood won't work with the 70D. So I'm trying to figure out if the different configuration of the 70D still allows some lens depth that will mimic the 18mm, or if I'm doomed to the medium-level cameras for as long as I'm shooting Near Southeast....



NavyYardGuy says: (8/21/14 1:50 PM)
JD,

I don't know anything about cameras but I read this in the WBJ this afternoon--I might be late on this but this is promising for the Eastern end of Capitol Riverfront/ Capitol Hill/ Navy Yard/ Anacostia West (is that catchy??) area.


link


JD says: (8/21/14 1:55 PM)
NavyYardGuy--

I wrote about it late last year (man, time flies)--not really anything desperately new in that (other than "Cohen Siegel" and a few refinements, plus of course better renderings that I need to dig out of the filings):

link

A whole lot of good discussion in the comments, with lots of talk about whether that location is (or isn't) likely to draw residents.





Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RDC on Condos Confirmed: Got it, thanks JD
CJBabyDaddy on Condos Confirmed: @RMP: The Twelve12 at 1212 4th Street just tapped me on the shoulder and said, “...
JD on Condos Confirmed: They didn't sell them, at least not outright. Greystar Management is taking over...
RDC on Condos Confirmed: Maybe I missed this earlier, but apparently Bozzuto sold the Capitol Yards build...
RMP on Condos Confirmed: eNvy is certainly bad but I still think F1RST takes the cake for the worst. Why ...
jdc on Condos Confirmed: Our cyber navy will beat Russian's cyber navy.
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/22/18
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/20/18
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 12/19/18

Recent Issued Building Permits Archive  
926 4TH ST SE   
01/16/19 
null / NA NA NA
EHOP19950290 / HOME OCCUPATION
1346 4TH ST SE   
01/11/19 
ALAN OWINGS / SEV HENRY
AH1900404 / CONSTRUCTION
After Hours Work on Saturday (1 / 12 / 2019) and Sunday (1 / 13 / 2019) for the Following Operations Saturday, 1 / 12 / 2019 ---Interior Operations after 7PM Sunday, 1 / 13 / 2019 ---Interior Operations: 7AM-7PM ---Exterior Operations: 7AM-7PM ---Sitework Operations: 7AM-7PM
900 5TH ST SE   
01/02/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MATT HUPPMAN
D1900229 / CONSTRUCTION
the Berg Corporation has a project located at 900 5th Street SE that has suffered a major fire and is considered an emergency job. Twenty percent of original structure was immediately demolished following the fire for safety reasons. The Berg Corporation is now pursuing a demolition permit to remove the balance of the stick built portion of the structure. The following improvements are to ...
1000 5TH ST SE 1ST FL   
01/09/19 
UNITED STATES OF AMERICA / WALTER T JONES
E1903161 / SUPPLEMENTAL
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
   
01/02/19 
UNITED STATES OF AMERICA / null
P1902543 / SUPPLEMENTAL
   
01/11/19 
UNITED STATES OF AMERICA / KASMIN HOLT
AH1900407 / CONSTRUCTION
Work under permit E1903161 on starting at 7pm - 7am.
1005 5TH ST SE   
01/04/19 
ALEXANDRA H HARRIS / HOLLIE MASON
F1800763 / CONSTRUCTION
Requesting permit to add an ornamental black iron fence with gate, not to exceed three feet, enclosing / surrounding front yard area. Installation of the fence may require concrete footings. The fence will be the same as others in the neighborhood and one of the approved transparent designs approved by the HOA; "hairpin" front section and "picket" return sections with ball finials on posts. Sol...
150 I ST SE   
12/24/18 
MILLSTONE CORPORATION / CHRISTINE LONG
B1903052 / CONSTRUCTION
To temp attached material hoist to side of building
328 I ST SE   
01/11/19 
BRIAN HUSEMAN / MELVIN CRENSHAW
B1904212 / CONSTRUCTION
Remove and replace kitchen on 2nd floor and update electrical. Remove and replace bathroom on 3rd floor and update electrical. Total SQFT 248
401 L ST SE   
01/15/19 
MICHAEL R BRICKMAN / SHELBY FIGAROORE
P1902908 / SUPPLEMENTAL
250 M ST SE   
01/07/19 
SQUARE 769 LLC / BRIAN STROTT
SH1900002 / CONSTRUCTION
Support of excavation system for a nine story 188,000 GSF office building with three levels below grade located at 250 M St. SE.
   
01/08/19 
SQUARE 769 LLC / ROBERT HART
AH1900389 / CONSTRUCTION
After hours work permit for installation of DDOT approved TCP jersey barriers.
1200 NEW JERSEY AVE SE 20590   
01/03/19 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1900891 / CONSTRUCTION
INTERIOR RENOVATION TO 7TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND NEW STRUCTURAL HANGING PARTITION. 7581 SQUARE FEET. US DOT **LEVEL 2 ALTERATION
71 POTOMAC AVE SE   
01/08/19 
RIVERFRONT HOLDINGS II, LLC / MITCH A. PERMUY
E1902865 / SUPPLEMENTAL
   
01/10/19 
FORIDA ROCK PROPERTIES INC / DANIEL M. NARH
P1902751 / SUPPLEMENTAL
227 TINGEY ST SE   
12/26/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900354 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday 1 / 18 – 7pm-10pm, Saturday 1 / 19 – 7pm-10pm, and Sunday 1 / 20 – 10am-7pm.
355 WATER ST SE   
12/24/18 
UNITED STATES OF AMERICA / KAYLIE ROLIN
TN1900028 / CONSTRUCTION
(1) 30 x 70 ft tent (1) 7k watt gas generator
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.