Since January, 2003
            
 Sliding from Before to After

History is in the air this week!
* SHIP DOCKING: The Pride of Baltimore II, a reproduction of an 1812-era topsail schooner privateer that bills itself "America's Star-Spangled Ambassador," will be docking at the Navy Yard from Wednesday, Aug. 20 through Monday, Aug. 25. Free public tours will be available from 1 pm to 4 pm each day.
In conjunction with the Pride's arrival, the U.S. Navy Museum is holding several events on Sunday, Aug. 24, including riverwalk cannon salutes at 1:15 and 3:15 pm. There will also programs in and around the Museum that day, including performances by the Chanteymen and more. (I'd link to a web page with details on the museum's offerings on Sunday, but can't find one anywhere.) Going to the Navy Museum requires entry at the O Street Gate on 11th Street, SE.
(And, on a side note, because I know people will ask, the Douglass Bridge will be closed to vehicle traffic from 2 am to 5 am late tonight/tomorrow morning to "allow water traffic to pass." Not a stretch to guess that these are related items.)
* SHINER LECTURE: Did you know that a slave named Michael Shiner, born in 1813, kept a diary of life in and around the Washington Navy Yard, where he started working as a child? It apparently recorded all manner of day-to-day observations of both citywide events and neighborhood details, and on Saturday, Aug. 23 at 10 am, there will be a lecture about the diary and its significance, given by Leslie Anderson. It's at 200 I Street, SE, so be sure to bring a government-issued ID to get in the building. The lecture is being presented by the Near Southeast Community Partners.
(A walking tour about the Navy Yard neighborhood of 1814 is happening at 11:30 am on Saturday, but it's all booked. Oops.)
UPDATE: One more bit of more recent history I can pass along. Not too different from my early shots, except to see that the site of the self-storage building wasn't quite so monolithic. And more gas stations, naturally.
Comments (8)
   
 
 More Recent News

JDLand.com Home

Comments

MJM says: (8/19/14 10:40 PM)
Wow - that picture of from the mid/late 60s (?) is classic. Only one building remains - amazing.


Ed says: (8/20/14 1:07 PM)
Pride of Baltimore II is a beautiful ship and she is well worth the trip to Navy Yard piers. In a terrible tragedy, the Pride I and four crew members where lost at sea during a storm.

With storm risks in mind, the Pride II was built to modern design standards with an engine. Sad to say, that folks living on the Anacostia will not see boats like the Pride after the construction of the South Capitol Street Bridge which is a fixed structure that will not open for tall ships.


JoeNdc says: (8/20/14 2:29 PM)
I agree Ed, a shame indeed. The bridge design should incorporate an opening mechanism to allow for larger vessels. Without it makes the historic Navy Yard somewhat of an afterthought to some extent. A sad thought really.

I suppose the SW waterfront will get that type of traffic and the tourism traffic & dollars it will draw.

Sigh!


conngs0 says: (8/20/14 3:47 PM)
Is that a done deal? I haven't followed this project nearly as much as I should, but I thought the Navy had to agree to sacrifice the drawbridge concept.

I agree it'd be sad to forgo the possibility of receiving the occasional visit from a tall ship like the Pride of Baltimore II, but that wouldn't justify the cost of a drawbridge. What are the chances of the Navy Yard attracting the types of shipbuilding that would make a drawbridge necessary and cost effective?


JD says: (8/20/14 4:19 PM)
My sense was that the city is saying "we're moving forward with no swing span, but if the feds feel it's necessary, they're welcome to pay for it and we'll do it."



Ed says: (8/21/14 7:54 AM)
Recently at a social gathering in Baltimore, I had a conversation with one the bridge architects responsible for the new South Capitol Street Bridge designs. He explained that the DDOT bridge construction contract is awarded on price and design.

Off the record, he lamented that without very strong citizen input for a strong design statement the lowest cost design would win the day. The "vanilla" bridge design with no drawbridge that traps the Barry on the north side of the bridge and keeps the tall ships on the Potomac side of the bridge is in our future. The city will do more if ciizens pay attention


conngs0 says: (8/21/14 10:04 AM)
In a vacuum, I think it's a no-brainer to build the biggest and nicest drawbridge possible. But I'm more focused on where the savings from going with the "vanilla" design would be allocated. If the money saved on the "vanilla" South Capitol Street bridge goes to enhancing the 11th Street SE bridge park project and/or getting the M Street SE and soccer stadium street car lines going, I'm totally fine with letting the tall ships occasionally visit SW/Waterfront or even National Harbor.


JD says: (8/21/14 10:42 AM)
It's funny--my sense always was that the swing span necessity would hold back a grander design, that without one they would have more options.

The Commission on Fine Arts (I think, or NCPC) was definitely not pleased with the current design. Some linkage on it all in this post: link

I was always in favor of what appears to be the simplest design (the arched bascule) because it would have wide bike/ped paths on the outside edge of both sides of the bridge, while the others (like the stayed cable or whatever it's called) would only have one path, right in the middle of the bridge. I also have always loved Memorial Bridge as a very simple but very wide and majestic approach to the city, and imagine that this could be similar, if the streetscape of it and South Capitol to the north is done right.

But even without an upwell of citizen advocacy, the kabillion federal agencies with oversight over DC's development projects are certainly wanting something that makes a bit more of a statement for this very important approach.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Albi Opening This: Fences up around parcel H. They are going to change the ingress points to N plac...
jdc on Albi Opening This: At 37 L, windows are going in and tower crane is gone. At Chiller site next door...
dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.