The week begins with the news that WC Smith is officially beginning construction this week on 800 New Jersey, the 336-unit apartment building just south of the Southeast Freeway and just north of the topped-out Park Chelsea.
And, in case you don't believe me, I have proof! Witness dirt being dug! A press release from WC Smith officially announcing the start of the $87 million construction project says that pile driving operations will be getting underway this week.
But of course the excitement in the neighborhood surrounding this project isn't for the arrival of still more residential units--it's for the building's 35,000 square feet of ground-floor retail space, which will be home to a long-sought Whole Foods after the building is completed in late 2016.
And, just like with its sibling to the south, 800 NJ's construction will include the construction and opening of a "new" street between 2nd and New Jersey--this time it will be H Street, running from just north of 200 I over to New Jersey just south of the freeway.
This is the second of three residential buildings on the block, with a third, 393-unit building fronting 2nd Street to follow. Residents in all three buildings will be able to use the facilities in every building, giving them "unparalleled access" to club rooms, game rooms, rooftop pools, an indoor lap pool, exercise facilities, dog walk areas, a demonstration kitchen and the 15,000 square foot courtyard.
As for the Park Chelsea, having been topped out a few weeks ago, work continues, with the bricking of the exterior being the next obvious milestone now underway.
My camera got a tour of the Park Chelsea this afternoon, and everyone better appreciate the 12 flights of stairs I walked up to get some of these pictures. (I do and I do and I do for you people.) It is expected to open in Spring 2015.
Comments (12)
   
 
 More About Agora/Whole Foods

JDLand.com Home

Comments

202_cyclist says: (6/9/14 5:15 PM)
Thanks for posting. It looks like Park Chelsea will have some pretty decent views. I also like the art deco curves on the building.


JD says: (6/9/14 6:53 PM)
One other item I learned about 800--the parking for Whole Foods will be on the 2nd and 3rd floor, with the residential units not starting until the 4th floor.


JD says: (6/9/14 8:31 PM)
(which also means that the lowest residential units are at least even with the freeway, not below its height)


BillP says: (6/10/14 9:43 AM)
does it seem the 800 NJ building will be stunningly close to the freeway? like "chicago brownstones to the L tracks, open your window and just about touch it" close?


JD says: (6/10/14 9:47 AM)
No, there's still H Street and then about 20-30 feet of grass/open space between 800 NJ and the freeway.


JES says: (6/10/14 11:35 AM)
WF's gonna have two whole levels of parking? Or will some of that above-ground parking be resident parking? I usually don't like above-ground parking, but with the freeway right next to it, I suppose it's a good use of floors in this case, as it'd be a tough sell to rent units directly adjacent to it.


JD says: (6/10/14 11:41 AM)
Residents will have underground parking, so the above-ground is just for Whole Foods. And yes, it's a dual purpose of also doing something with the two floors below freeway height that would be less than ideal to try to rent out.


Weaver says: (6/11/14 5:33 PM)
I heard from a source that 1000 NJ will not include commercial office space but a hotel. It will also include residential.


JD says: (6/11/14 5:36 PM)
? 1000 NJ? That's Capitol Hill Tower. Do you mean across the street? If so, someone's got to buy all the land there first (Akridge only owns the part of the block facing 1st Street.)


Weaver says: (6/11/14 5:39 PM)
Sorry the dirt pile lot.


JD says: (6/11/14 5:42 PM)
That's controlled by the Housing Authority as part of the Capper PUD. Would be a massive change if it's not going to be all mixed-income residential. Has never been slated to be office space.


202_cyclist says: (6/12/14 7:18 AM)
Am I the only person who is going to miss Dirt Mountain? I had grand plans of sledding down that last winter.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

JD on Whole Foods: I imagine they have a provisional license in advance of the hearing. They were s...
DCCyclist365 on Whole Foods: The Whole Foods on H St has $5 beer and wine on tap all day, every day. Do you k...
Hastings on Whole Foods: I noticed two bright orange signs on the WF front doors regarding a hearing on D...
Westnorth on Whole Foods: Yawwwwwn. Wake me when it's time for happy hour. (Oh wait, I missed that!)
JD on Whole Foods: That's why you guys pay me the big bucks, right? :)
Ampersand on Whole Foods: JD I'm duly impressed by your ability to predict the location of the eventual WF...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/10/18
50 M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/08/18
1100 B/O 10TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/07/18
100 B/O M ST SE   ROBBERY  10/05/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/04/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 09/28/18
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/27/18
100 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 09/26/18
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/26/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/26/18
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/24/18
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/12/18 
null / DONNA G GRAHAM
AH1900071 / CONSTRUCTION
WR #3585809 - M.ALLEN / A.PRICE - 1100 2ND PLACE SE - PEPCO CREWS WILL BE SPLICING CABLES AT NIGHT STARTING 10 / 15 / 18 UNTIL 11 / 2 / 18 FROM 10:00 PM TIL 7:00AM MONDAY THROUGH SUNDAYS
1346 4TH ST SE   
09/28/18 
ALAN OWINGS / ROBERT HENRY
AH1801345 / CONSTRUCTION
After Hours Permit for 10 / 08 / 2018 to perform construction work with the below activities: Interior Operations: 7AM - 7PM - ADVANCED NOTICE TO RESIDENTS, OPERATION CONTACT PERSON ON SITE TO ADDRESS ANY UNEXPECTED NOISE ISSUES BEFORE 9:00AM WITH CONTACT NAME AND TELEPHONE. Exterior Operations: 9AM-7PM - NO EXTERIOR ACTIVITY, TRAFFIC, NOISE GENERATION BEFORE 9am WITH ON SITE OBSERVANCE. ...
   
10/09/18 
FC 1346, LLC / null
E1900300 / SUPPLEMENTAL
2 I ST SE   
09/25/18 
MCDONALDS CORPORATION / TAMIKA STATON; OTIS
EN1802612 / SHOP DRAWING
Install 1 New G2S Elevator - 4000LBS @ 350FPM
   
09/25/18 
MCDONALDS CORPORATION / TAMIKA STATON; OTIS
EN1802611 / SHOP DRAWING
Install 3 new G2S Elevators - 3500LBS @ 350FPM
   
09/26/18 
MCDONALDS CORPORATION / null
E1811060 / SUPPLEMENTAL
   
10/09/18 
CRESECENT CAPTIAL VIEW / null
P1900223 / SUPPLEMENTAL
4 I ST SE   
10/09/18 
CRESCENT COMMUNITIES / null
P1900221 / SUPPLEMENTAL
328 K ST SE   
09/27/18 
MARK BARRETT / null
E1811075 / SUPPLEMENTAL
   
10/04/18 
MARK BARRETT / BJORN FALK
SOL1800999 / CONSTRUCTION
Installation of a 5.559kW solar PV system. Roof mounted, 17 panels with integrated microinverters.
401 L ST SE   
10/11/18 
MICHAEL R BRICKMAN / FLOYD H. FURR
P1900299 / SUPPLEMENTAL
   
10/11/18 
MICHAEL R BRICKMAN / DARIUS LYVERS 703-491-1234
M1900108 / SUPPLEMENTAL
300 M ST SE 1ST 20024   
09/21/18 
ELLEN OPDYKE / null
P1809360 / SUPPLEMENTAL
300 M ST SE 3   
09/21/18 
FEDERAL CENTER LP / null
P1809359 / SUPPLEMENTAL
300 M ST SE 8 20024   
09/24/18 
BARBARA D HAMLETT / null
P1809404 / SUPPLEMENTAL
300 M ST SE   
09/25/18 
FEDERAL CENTER LP / null
E1811000 / SUPPLEMENTAL
   
09/25/18 
FEDERAL CENTER LP / null
E1811001 / SUPPLEMENTAL
   
09/25/18 
FEDERAL CENTER LP / null
E1810999 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
09/20/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1810877 / SUPPLEMENTAL
   
09/21/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1809362 / SUPPLEMENTAL
79 POTOMAC AVE SE 1ST FL   
10/03/18 
RIVERFRONT HOLDINGS I LLC / null
P1900101 / SUPPLEMENTAL
71 POTOMAC AVE SE   
09/28/18 
FORIDA ROCK PROPERTIES INC / BARR CONCRETE
AH1801325 / CONSTRUCTION
After hours to pour concrete with pump truck 9 / 28 / 2018 to 10 / 28 / 22018 from 11pm to 7am
   
10/04/18 
FORIDA ROCK PROPERTIES INC / BARR CONCRETE
AH1900029 / CONSTRUCTION
Afterhours to pour concrete with pump truck saturday 10 / 06 / 2018 from 12am to 7am
79 POTOMAC AVE SE   
10/04/18 
RIVERFRONT HOLDINGS I LLC / null
M1900054 / SUPPLEMENTAL
201 TINGEY ST SE   
10/09/18 
JBG/SEFC 170 LLC / DONNA G GRAHAM
AH1900051 / CONSTRUCTION
WR #3566756 - M.ALLEN / BRUNO - 201 TINGEY ST SE - PEPCO CREWS WILL BE INSTALLING NETWORK TRANSFORMERS AND INSTALLING CABLES - PEPCO WILL HAVE TO SHUT DOWN 3RD ST BETWEEN WATER ST & TINGEY ST SE TO SET TRANSFORMERS ONLY - WORK WILL BEGIN 10 / 12 / 18 THROUGH 11 / 30 / 18 - MONDAY THRU FRIDAYS FROM 10PM TIL 8AM AND SATURDAYS AND SUNDAYS FROM 6AM TIL 6PM
227 TINGEY ST SE   
10/09/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900056 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for follow-up test run of the precast concrete fa├žade panel installation. Work to take place 7pm on 10 / 10 to 7am on 10 / 11.
   
10/15/18 
GONE YARD HOTEL OWNER LLC / MICHAEL ERIC CAMPBELL 703-631-2711
FB1900011 / SUPPLEMENTAL
NO. TO BE INSTALLED (2) GROSS RATING: 999999 BTU / HR NATURAL GAS STEAM PRESSURE 160 PSI OUTPUT: 960,000 BTU / HR
   
10/15/18 
GONE YARD HOTEL OWNER LLC / MICHAEL ERIC CAMPBELL
UP1900012 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.