Since January, 2003
            
 (a random before-and-after moment)
September 20, 2009
June 9, 2016
3rd at Water St., Looking South-Southeast (see more)

It's getting hard to keep track of all of the projects in the ground around the neighborhood, and now another one is about to be added to the list: the 195-unit mixed-income apartment building christened the Lofts at Capitol Quarter is having a ceremonial groundbreaking on March 5 at 10 am, with the mayor, Tommy Wells, and other luminaries expected to be in attendance.
This project, on the south side of L Street SE between 5th and 7th, is on the site of the old Capper Seniors building, and will displace the northern half of Nats Economy Lot W. It faces the Marine Bachelor Enlisted Quarters building that opened at 7th and L in 2004.
Of course, since this is a ceremonial event, we'll have to see when actual moving of dirt--other than by shovel-wielding VIPs--begins. But financing is in place, permits are approved, and the DC Housing Authority appears raring to go to get this project underway.
When completed, the building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
This is the third apartment building to rise up as part of the Hope VI redevelopment of the Capper/Carrollsburg housing project, and the first to be mixed income, with at least 38 affordable units to be included.
The "Capitol Quarter" moniker comes from the rows of new townhouses built a few blocks away as part of the Capper redevelopment. In the original plans for Capper's re-do, this site (known as Square 882) was going to be townhouses as well, but was switched to an apartment building in 2009. The south half of the block, facing M Street and the Navy Yard, may someday be the 600 M Street office development, but that does not appear to be happening anytime soon.
Comments (10)
   
 
 More Recent News

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (2/27/14 4:40 PM)
How convenient! Oh, the primary election is on April 1st.


Tom says: (2/27/14 10:08 PM)
Zoo, sure, but that's how it works.


202_cyclist says: (2/28/14 9:24 AM)
Does anyone know what is happening on the lot directly north of the Toll Brothers development? It looks like there was some activity there yesterday, with cuts in the ground and soil moved.


JD says: (2/28/14 9:27 AM)
Expanding the parking lot, apparently. Which is a wise move if they aren't planning on building anytime soon.


JES says: (2/28/14 11:41 AM)
Yeah the Nats have lost the entirety of what was Lot F last year ( link hopefully that signifies that Ballpark Sq will finally start soon. Looks like they'll be losing half of Lot W also once this development starts. And isn't Lot T right where that controversial DCHA condo building might go?

Surface lots are dropping like flies... and in no way is that depressing.


JES says: (2/28/14 11:41 AM)
Crap, that link didn't work: link


JD says: (2/28/14 11:56 AM)
The Nats have taken Lot F out of their lineup, but I'm not convinced that Ballpark Square (or at least the hotel/residential part) will start before the end of the season. It may still operate as a cash lot until then.

Also, the lot at the NGA building is out of the cash lot inventory.

I've done a preliminary 2014 update of my Nats Parking Lots map, but will need to remove the NGA lot (duh) and also put the Lot F area back on, but as a cash lot, until events warrant.

(The NGA lot will come back--a touch smaller, and relocated to the southeast corner of the block--once the demo is done and the block has been reconfigured, but I'm not sure that'll happen before the end of the season.)

And yes, as I wrote a few weeks ago, Lot W will go down to 186 spaces.

link



JD says: (2/28/14 11:57 AM)
But I wouldn't expect the Lot T to go away this year. Or maybe even next year.


JD says: (2/28/14 11:58 AM)
Whoops, the link to my map:

link



Gamble Rogers says: (2/28/14 3:56 PM)
Having walked down the lonesome broken sidewalks of 7th Street SE on non-game days, this groundbreaking is great news. The huge barren expanse of Lot W might be a boon for Nats fans from Virginia and Maryland (District residents appreciate your help in quickly repaying the stadium bonds), but the lot forms a barrier between the development around Canal Park and Lower Eighth Street. When DCHA shot down the Marines proposal to build their second Bachelors Enlisted Quarters on Lot W, I thought, "Sweet! We get to look at an empty lot for the next decade!" I never thought DCHA would move this fast on the financing.

And filling Lot W with hundreds of residents could also make Blue Castle development more attractive. If retailers ever consider that site (REI, grocery, anyone please!), it will help to have potential customers next door.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

kalicki on A Photo Tour: I generally like the style of this building, but man, the white lights on the fa...
conngs0 on A Photo Tour: Whoops! I don't know how I jumped to full replacement! Sorry! Regardless, kee...
JD on A Photo Tour: Not a hip replacement! Had to have the torn labrum repaired and the head of the ...
conngs0 on A Photo Tour: Thanks for the update, JD! I know you've been waiting for a cell phone store fo...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/18
400 B/O M ST SE   THEFT
Shoplifting
 02/21/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/18
1000 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/07/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
02/21/18 
BAKER DC / CHRISTINE LONG
AH1800618 / CONSTRUCTION
An after hours permit is respectfully requested from 5AM to 9PM daily
1331 2ND ST SE 20003   
01/29/18 
DC WATER / DAVE LEVINE
AH1800505 / CONSTRUCTION
After hours work for structure exaction and support for B1311474 DC Water. Corman Construction 202-863-0052.
1016 3RD ST SE   
02/01/18 
ANAMARIA R MOTTOLA / DAVID L. HAHN
P1803348 / SUPPLEMENTAL
1346 4TH ST SE   
02/06/18 
ALAN OWINGS / ROBERT SEV HENRY
AH1800541 / CONSTRUCTION
After Hours Permit for 2 / 19 / 18 from 7AM to 7PM to perform concrete, framing, and utility operations.
   
02/06/18 
FC 1346 LLC / RICHARD V CAREY
P1803428 / SUPPLEMENTAL
150 I ST SE   
02/05/18 
WC SMITH / null
P1803402 / SUPPLEMENTAL
140 M ST SE   
02/07/18 
SPAULDING & SLYE/STE100 / null
E1803798 / SUPPLEMENTAL
110 M ST SE   
01/29/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JAMES WEAVER
E1803534 / SUPPLEMENTAL
   
02/02/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1803361 / SUPPLEMENTAL
140 M ST SE 20032   
02/14/18 
SYLVIA LINDSEY / null
P1803641 / SUPPLEMENTAL
202 M ST SE   
01/29/18 
UNITED STATES OF AMERICA / NURI EROL
D1800281 / CONSTRUCTION
Remove Existing flooring. Remove some of the furnitures, equipment.
300 M ST SE 53533   
02/08/18 
FEDERAL CENTER LP / SPENCER TEEL
BP1801893 / POST CARD
300 M ST SE   
02/16/18 
FEDERAL CENTER LP / STEVEN MERCHANT
B1803279 / CONSTRUCTION
New Sprint store sustainable design tenant build-out in an existing building, partical first floor. Work will consist of building a new sales floor and back of the house. New work sill consist of display fixtures, ceiling, plumbing fixtures, mechanical ductwork to diffusers, interior partitions, floor finishes, outlets and new locations of electrical panels. **CHANGE IN USE, LEVEL 2 ALTERATION
401 M ST SE   
01/30/18 
DOEE C/O DEV MURALI / JESSICA REICHARD
AH1800507 / CONSTRUCTION
After hours permit to preform manhole inspections during off peak hours 7pm - 7am for all Manhole Locations covered under permit # PA10374319-R1 for DOEE Anacostia river sediment project.
861 NEW JERSEY AVE SE   
01/31/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800467 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.***TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
02/09/18 
SQUARE 742 LLC / null
P1803534 / SUPPLEMENTAL
   
02/14/18 
SQUARE 742 LLC / null
P1803681 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
02/15/18 
SQUARE 742 LLC / null
E1804057 / SUPPLEMENTAL
79 POTOMAC AVE SE   
02/21/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1805358 / CONSTRUCTION
Address revision only for B1702971 from 25 Potomac Ave SE to 79 Potomac Ave SE.
640 SOUTH CAPITOL ST SE   
02/05/18 
JIM LATISIS ZAYO GROUP
B1707197 / CONSTRUCTION
Addition to existing concrete telecom building.
401 TINGEY ST SE   
01/30/18 
PEPCO / BARBARA ANN STEDMAN
AH1800520 / CONSTRUCTION
UG TRANSFORMER WORK TO BE PERFORMED ON THE 400 BLK OF TINGEY ST SE. MANHOLE ACCESS. WORK TO BE PERFORMED BETWEEN THE HOURS OF 7:30AM AND MIGHTNIGHT ON 1 / 30 / 18 AND 1 / 31 / 18.
227 TINGEY ST SE   
01/29/18 
UNITED STATES OF AMERICA / ERICKA CLARK
TC1800021 / CONSTRUCTION
2 tower cranes
   
01/30/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1802750 / CONSTRUCTION
Revision to Permit SH1700028. Sheeting and shoring for Yards Parcel L-2 project. Revision includes 10-foot precut excavation and layback on Water Street, 3rd Street and northern L-1 elevations, and removal of upper tier of rakers at L-1 elevation and upper tier of tiebacks at the Water Street and 3rd Street elevations.
   
02/20/18 
FOREST CITY WASHINGTON / FOREST CITY WASHINGTON; DFM DEVELOPMENT SERVICES
FD1700057 / CONSTRUCTION
Yards parcel L-2. Construction of foundation and underground parking garage for new 11 story multi-family mixed used residential building at 227 Tingey Street SE as part of development of Parcel L at the Yards
325 VIRGINIA AVE SE 20003   
02/14/18 
JASON W GOLDSMITH / null
E1804039 / SUPPLEMENTAL
325 VIRGINIA AVE SE   
02/06/18 
JASON W GOLDSMITH / CRAIG HARTSOCK
B1804721 / CONSTRUCTION
Remove two non-structural walls on ground level of townhouse and re-frame in new configuration to create a full bathroom on ground floor.
   
02/07/18 
JASON W GOLDSMITH / MORIS O. OCHOA PINEDA
P1803462 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1001 NEW JERSEY AV SE   12/28/17
$ 687,365
WHATS ON SECOND PROPERTIES LLC
 


Project Directory
Completed
Agora ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.