Since January, 2003
            
 Page Through from Before to After

With this photo yesterday from the little Yards tent display at 1st and N lighting the fuse, the announcement was made today that local salad chain Sweetgreen will be coming to Twelve12, the new 218-unit apartment building now under construction at 4th and M SE that will also be home to Harris Teeter and Vida Fitness.
Sweetgreen is currently expected to open in mid-2014, and will be located right on the corner of 4th and Tingey, with "exposure" on both streets, as seen in the image at right.
Forest City's press release for today's news also gives some timeline updates for the Boilermaker Shops, saying that Bluejacket and Buzz Bakery are expected to open in June late July/early August, Nando's Peri-Peri "this summer," and Willie's Brew and Que "in late summer." Over at the Lumber Shed, Osteria Morini is expected "in mid-late summer of this year," and Agua 301 is coming "this summer." And, as reported last week, year-round pizzeria Nicoletta will be coming to the Yards Park boardwalk "in late 2013." In the non-food category, Desi Living Loft Furniture is still expected in June.
UPDATE: Forest City sent an update to the expected opening date for Bluejacket/Buzz Bakery.
Comments (13)
   
 
 More About Twelve12/Teeter/Yards

JDLand.com Home

Comments

Mark says: (5/21/13 1:29 PM)
In every case, those are extremely optimistic opening dates, given the current state of each buildout. My guesses: Bluejacket in September, Nando's in October, Willie's in January, Osteria Morini in November, Agua 301 in October, Nicoletta in April. I hope I'm just being wrongly pessimistic.


JD says: (5/21/13 1:38 PM)
I think the race to be the most pessimistic now is kind of cute. :-)

I don't think Forest City would have been so specific with "June" if they didn't think it was realistic. It might be June 30, and it could still very well slip, but there is a method to the madness when a specific month is mentioned for one location, with the others having a less-specific time frame attached.


JH says: (5/21/13 2:17 PM)
I hope Forest City does know something we all don't, but I find it almost impossible to believe they'll get Bluejacket open in June--even if it's 11:59pm on the 30th. I walk or bike by there several times a week, and while they've made some progress, it just doesn't seem like they are moving that quickly. Gordon Biersch had people in there space practically 24/7 for the two months leading up to their opening--perhaps we'll see a change of pace soon?


JD says: (5/21/13 2:23 PM)
I do think the "say the closest possible date that could happen" is a habit that remains hard to break in the development biz.


JD says: (5/21/13 2:35 PM)
And, guess what, I just got an update from Forest City changing the expected opening time for Bluejacket/Buzz to late July/early August. Pessimists FTW!


JES says: (5/21/13 2:37 PM)
I prefer to call us realists. Remember when the boilermaker renovation was originally announced, and they said things would open in 2012? There's only so much of that people can take. When you're at a restaurant waiting for a table and the host says it'll be 30 minutes, you get a little antsy when you have to wait an hour :)


JD says: (5/21/13 2:48 PM)
The irony in all of this is my unintended position as a cockeyed optimist, considering that nickname at home is The Prophet of Doom.



conngs0 says: (5/21/13 2:52 PM)
I'd say the "over/under" betting potential for these opening dates is pretty awesome, and I'd suspect most would take the "over" on all of the above dates. But I suppose there isn't much incentive for the developers to overestimate these timelines when underestimating just causes people to continue checking to see if your establishment is finished yet.

Nevertheless, all of these projects are pretty exciting, especially because of the variety they're bringing to the neighborhood. Sweetgreen is yet another good edition. And given its location in the same building as the Vida, I'm wonder if there will be some kind of weight restrictions on the residents of 1212. That's gonna be the healthiest block in the entire neighborhood, right?


JD says: (5/21/13 2:53 PM)
Also, when this news was starting to percolate last night, I told Bill that I was glad to hear it was coming--and he reminded me that, as North of the Freeway denizens, we actually already have one, closer to our house than this one will be. (Oh yeah....!) So clearly I'm just addled more than usual these days.


MJM says: (5/21/13 7:27 PM)
I'll stir the pot, who said everything would be open in June because its just that easy to open things.

Looks like that five-month addition to when they said that back in March is gonna come true. Bluejacket has been tweeting and mentioned in article for a probable August opening. Unless the work 20/7 like GB there was no way any of those places were gonna open in April or May.


SoChill says: (5/22/13 1:15 AM)
Is nobody going to mention that Sweetgreen puts street-grade crack in their salads? I mean, how else can they be so improbably delicious?


JES says: (5/22/13 10:42 AM)
That would also explain why the salads are so expensive...


SoChill says: (5/27/13 12:30 PM)
You know what they say: You pet what you're gay for.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Inching from Quarantining: The few people I know who are working downtown say that it's brutal to try to fi...
conngs0 on Inching from Quarantining: jdc, it's going to be super interesting to see how the retail landscape changes....
jdc on Inching from Quarantining: By the time I regularly resume trips to JD Land, I wonder how much of the retail...
Jscott280 on Inching from Quarantining: https://www.bisnow.com/washington-dc/news/retail/barbershop-and-cocktail-bar-con...
MarkinDC on Inching from Quarantining: The new liquor store next to BonChon appears to be open. Also, the new CVS look...
right-toe on Inching from Quarantining: Floor plans posted & new-ish images for the Garrett (adjacent to Whole Foods) & ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
1150 5TH ST SE   
07/01/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; TBD; TBD
BCIV2000113 / CONSTRUCTION
DGS PROJECT VAN NESS ELEMENTARY SCHOOL INITIAL PHASE FOR SITE DEMOLITION AND SITE CONSTRUCTION STAGING AREA FOR THE INSTALLATION OF TWO TEMPORARY SCHOOL TRAILERS TO BE SUBMITTED UNDER A SEPARATE PERMIT.
   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
150 I ST SE   
07/02/20 
SQUARE 737 LLC / JASON D DORRIS
AH2001626 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
300 M ST SE   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.