Since January, 2003
 (a random before-and-after moment)
December 3, 2006
January 31, 2015
Half at K, Looking East-Northeast (see more)

The latest presentation slides from last week's 11th Street Bridges project's Community Communications Committee Meeting have been posted, and a few of them caught my eye (or bought my eye, for you fans of obscure Monty Python references). TheWashCycle recently posted a photo of the work underway on the overlooks that are now under construction just down-river of the new local bridge, using the old piers as their bases, and this is what they are expected to look like when completed (click to enlarge):
There is also a rendering (seen at right) of how the Anacostia Riverwalk Trail will run both under the bridges and down from O Street when finished; it also shows the small overlook that will be built out into the river just to the east of the entrance gate to the Navy Yard Promenade. WashCycle also got a recent photo of the path under construction, where you can see the outlines of what the rendering shows is coming.
The presentation slides also have some photos of the demolition underway on the old outbound freeway flyover, and aerial photos of the work that's completed and still underway on the east side of the river. There's also, on page 21, an image which looks like they've already almost completed the filling-in of the portion of the Southeast Freeway between 8th and 11th, since it shows dirt almost up to the underside of the existing bridge that takes 11th Street across the sunken freeway between I and L.
What all of this really means is that I need to get back to 11th Street with my camera pretty soon, since my last batch of photos is now a bit dated (waaah!).
Comments (11)
 
 More About 11th Street Bridges

JDLand.com Home

Comments

jacques says: (3/19/13 5:18 PM)
So does that mean the 11th Street Recreation Bridge has gone from "a long shot" to "completely off the table?"



JD says: (3/19/13 5:23 PM)
No, it was always planned that these overlooks would be built. If the recreation bridge somehow comes to pass, the overlooks would be demolished.



Maelstrom says: (3/19/13 8:20 PM)
new news - They've demolished the roadway lanes from half of 11th street by the flyovers - just the underlying steel is left.


monkeyrotica says: (3/20/13 8:35 AM)
What the? I was promised ziplines! Where the HELL are my ziplines?!?!?

link


dcgent says: (3/20/13 11:51 AM)
Completion date?


JD says: (3/20/13 12:02 PM)
By summer, I believe.


MarkB says: (3/20/13 1:57 PM)
Hope this isn't too off topic, but have we seen what the plan is for the current 8th SE St off ramp? It looks as if it's ramp is the next to go...


JD says: (3/20/13 3:44 PM)
@MarkB, if you look at this link:

link

It *appears* that they are planning for a new on-ramp at 8th, a smidge to the west of the current one. (New one marked as E-2) It seems like they had to move it a bit so that ramp D-4 can come from the freeway down to 11th Street at the new Southeast Blvd. intersection.


MarkB says: (3/20/13 5:12 PM)
Ahhh!!! Looking forward to Phase 2! Thanks!


ksalvador says: (3/25/13 8:54 AM)
On the presentations 5th slide you can see a good shot or ramps C-1 and C-2. In the pictures it doesn't look like there is traffic on them but I didn't know if missed an announcement. I know they were scheduled to be done in late fall. Do you know if they are open?

Thank you! Loooove your site. I just registered an account but I have been reading your posts for well over a year.


JD says: (3/25/13 9:26 AM)
I think the C1 and C2 ramps are opening soon--Dr. Gridlock mentioned them here: link It was the ramps to the 11th Street Local bridge from NB 295 and from the local bridge to SB 295 that opened last fall. I think C1 and C2 are the mirror images (to the local bridge from SB 295 and from the local bridge to NB 295).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on Capper 'Flexibility' Gets: Nov. 2007 post of mine on 400 M: "The 139-unit building was originally design...
JHUGrad on Capper 'Flexibility' Gets: I think I've proven my point (@JoeNDC and @tspauin). I assumed you guys knew th...
tspaquin on Capper 'Flexibility' Gets: @EM3 -- I've been trying to learn more about 400 M and I do see your point. Ther...
JoeNdc on Capper 'Flexibility' Gets: @JHUGrad... Oh my! Please, I implore you to refer to my last quasi-reply to you ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 03/02/15
70 B/O I ST SE   THEFT
2nd Degree
 03/01/15
100 B/O K ST SE   THEFT F/AUTO
 03/01/15
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15
UNIT B/O K ST SE   THEFT F/AUTO
 02/01/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1011 1ST ST SE   
02/12/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
1015 HALF ST SE   
02/12/15 
THOMAS AN / THOMAS AN; HYH ELECTRIC CO. INC.
SG1500156 / CONSTRUCTION
INSTALL ONE SINGLE FACE BUILDING SIGN AND ONE DOUBLE FACE BLADE SIGN
   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/11/15 
SQUARE 743 INC. / JOHN GIUSEPPE-RAMCO
TL1500062 / CONSTRUCTION
FIRST TIME TENANT TO BUILDOUT AND OCCUPY TENANT SPACE ON PART OF THE 7TH FLOOR THE TRUST FOR PUBLIC LAND AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. .PLUMB. ELECT. FIRE PROTECTION AND ARCHITECTURAL PLANS BY KTA. INTERIOR WORK ONLY. NO CHANGE IN USE. NO STRUCTURAL WORK INVOLVED.
   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
300 M ST SE   
02/11/15 
FEDERAL CENTER LP / SAM HOLLEN RAMCO OF DC INC.
B1504255 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR CONFERENCE ROOM. PARTITIONS FINISHES MECHANICAL ELECTRICAL AND LIFE SAFETY. ICI SERVICES
1201 M ST SE   
02/11/15 
CSC / DAMON ELLIS
B1503731 / CONSTRUCTION
SCOPE OF WORK AREA IS 800SQFT TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND FIRE. NO CHANGE OF USE OR STRUCTURAL WORK BEING DONE
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
909 NEW JERSEY AVE SE   
02/26/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DAVID L. HAHN
P1503815 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.