Since January, 2003
            
 Sliding from Before to After

Some quick shots from today of the other projects underway at the Yards, in case a new dry cleaners just isn't exciting enough for you.
The new exterior glass is now almost completely on the Lumber Shed at the Yards Park, where Osteria Morini and Agua 301 are slated to be tenants when it opens later this year (along with Forest City Washington on the second floor):
A before-and-after that can't possibly be resisted:
Facing the Anacostia:
Meanwhile, over at the Twelve12 apartment building project on 4th Street (more popularly known as the Harris Teeter/Vida Fitness building), the progress isn't quite as showy, unless you're a construction nerd and you know what the arrival of a tower crane means:
Yes, it means that vertical construction is not far off. The building is expected to be completed in 2014. And in case you want one more shot of the hole in the ground:
See the project pages for the Lumber Shed and Twelve12 for renderings and additional details.
Comments (16)
   
 
 More Recent News

JDLand.com Home

Comments

JES says: (1/29/13 2:00 PM)
Is the entire top floor of the Shed going to be offices? It seems like a golden opportunity for the restaurants on the ground floor, at least the ones facing the water, to have a second floor seating area that overlooks the park and river. Way too valuable a view to be wasted on office space, IMO


JD says: (1/29/13 2:03 PM)
As of now, Forest City has temporary rights to be on the second floor, but if they can lease 2nd floor space for retail, they have the flexibility to do so. They had a hard time getting any interest in the second floor spaces, though, which was why they decided to move their offices there--it got the building's leased space to a high-enough level to get construction financing. If FCW hadn't made that move, who knows whether the building would be underway yet.



ZoolanderANDtheBoYz says: (1/29/13 2:37 PM)
I seriously don't know why it took over a year to excavate Twelve12. Did they find another unexploded ordnance or it is finance problem? Even the mega downtown CityCenter construction didn't take over a year to excavate it.


JES says: (1/29/13 2:57 PM)
So by leasing it... to themselves... they managed to finance the project.

That's an impressive level of trickery right there.


JD says: (1/29/13 2:59 PM)
Well, it's not like they're not going to move in. They now have to spend money to move their offices, etc. etc. Not exactly sleight-of-hand. But the leases just weren't moving. After all, there's still only two (other than FCW), and the building has been leasing for a long while now.



Boris says: (1/30/13 10:19 AM)
JD, on a different subject, any word on the place next to the ice rink? It seems like they put the opening date off every few weeks.


JD says: (1/30/13 10:23 AM)
We've talked about it in other threads. There's no opening date--there had been hope that maybe with Xavier having finally finished the build out of the Hawk n Dove that he'd be able to turn his attentions to the Park Tavern (and to Willie's at the Boilermaker), but at this point there's been no announcement. And this is definitely one that I won't believe any "almosts" until the doors are open.


Boris says: (1/30/13 11:10 AM)
Right there with you. Thanks! (Looks like I need to check in more often. Apologies!)


JD says: (1/30/13 2:28 PM)
What? You don't hang on my every word, and commit it to memory?!? I am SHOCKED!


MJM says: (1/30/13 3:12 PM)
Is that the first crane in Near-SE since the 1015 Half St crane came down?


JD says: (1/30/13 3:15 PM)
I was thinking about that today--yes, it's the first one.

I remember back when I used to call Near SE the "crane farm." :-)

link



JES says: (1/31/13 10:31 AM)
RE: Park Tavern, I ran by it late last week and saw someone in chef-like garb in their kitchen. So maybe they're at least in the menu creation stage?


dereknolini says: (2/1/13 12:30 PM)
I am especially interested to try Park Tavern. I can easily see this becoming my favorite place to go. Before games or during the week! Maybe Bluejacket before games too!


JD says: (2/1/13 1:00 PM)
A couple new building permits have been approved over the past week at 202 M (the Canal Park/Park Tavern address), so maybe there is movement.


tspaquin says: (2/7/13 12:30 PM)
re: Park Tavern -- walking by yesterday morning, some gentleman were delivering a large amount of firewood, presumably for the wood-fired oven. I asked them about an opening date and they said "we think within a week." Not sure how much actual knowledge or connection they had, but for what it's worth. I can't wait to see that place open.


JT says: (2/7/13 1:49 PM)
They're hiring:

link

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

202_cyclist on Capitol Riverfront BID: Yes-- a JD Land birthday party/happy hour would is a great idea.
NavyYardGuy on Capitol Riverfront BID: That's a lot of good information--congrats on the award and the upcoming anniver...
jdc on Barre3 Studio Coming: Good news @202 - that lot is such an eyesore and I cannot wait for construction ...
202_cyclist on Barre3 Studio Coming: There is another construction trailer at the lot on K Street, SW, across the str...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.