For those in the neighborhood who have some concerns about the lovely Capitol Power Plant, which sits just north of the Southeast Freeway but which reaches down to I Street SE just west of 70/100 I, there is a public meeting Thursday, Jan. 24, hosted by Tommy Wells.
Withthe recent application by the Architect of the Capitol for changes to the plant's permits bringing renewed push-back from the community about the plant's continuing burning of coal, Wells has organized the meeting to "hear your concerns and discuss next steps." The District Department of the Environment will be there to present background information about the plant, and Wells is also intending to include a discussion of "strategies for addressing broader concerns about the power plant, particularly the ongoing use of coal as a fuel source."
The Architect of the Capitol has posted these responses to the questions raised about the permits. (Unfortunately, I can't suppress a snicker at the photo used to show the plant, taken on tulip-filled spring day from one of the parks along D Street SE, showing the plant in a fabulously bucolic setting. My photo might be a bit more realistic.)
The meeting is at 6:30 pm at United Methodist Church, 421 Seward Square SE (just south of Pennsylvania Avenue between 4th and 5th streets).
Comments (4)
 
 More About meetings
 All posts: meetings, powerplant

JDLand.com Home

Comments

JD says: (1/23/13 7:08 PM)
(Also, I should probably mention that power plant doings will most likely come under my semi-retirement banner, meaning I'm not following it real closely--unless they decide to demolish it. :-) )



straightoutof03 says: (1/24/13 9:35 AM)
You're right about that photo from the Architect of the Capitol. It's essentially a photo of something totally different with just a small portion of the plant being shown. Ridiculous.


jg says: (2/7/13 9:39 AM)
The photo selection is exactly what CSX does, only they choose photos highlight the gritty ends of the tunnel for their photos rather than the actual bucolic neighborhood.
ps - not meant to open a discussion on the csx project, just the photo selection/propaganda.


John Marson says: (2/10/13 11:59 PM)
Nice photo, you can see the coal pile. A lot of people would miss that from the street.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
MJM on Capper 'Flexibility' Gets: What people fail to think about when talking about the residents who were displa...
JHUGrad on Capper 'Flexibility' Gets: @JoeNdc.... In all of the paragraphs you've written, you still haven't been able...
ZoolanderANDtheBoYz on Vote for the: I can't stand the hunger game series. But, a good list though.
JoeNdc on Capper 'Flexibility' Gets: So I waited all weekend before responding so as to be thoughtful and to see what...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 03/02/15
70 B/O I ST SE   THEFT
2nd Degree
 03/01/15
100 B/O K ST SE   THEFT F/AUTO
 03/01/15
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15
UNIT B/O K ST SE   THEFT F/AUTO
 02/01/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1011 1ST ST SE   
02/12/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
1015 HALF ST SE   
02/12/15 
THOMAS AN / THOMAS AN; HYH ELECTRIC CO. INC.
SG1500156 / CONSTRUCTION
INSTALL ONE SINGLE FACE BUILDING SIGN AND ONE DOUBLE FACE BLADE SIGN
   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/11/15 
SQUARE 743 INC. / JOHN GIUSEPPE-RAMCO
TL1500062 / CONSTRUCTION
FIRST TIME TENANT TO BUILDOUT AND OCCUPY TENANT SPACE ON PART OF THE 7TH FLOOR THE TRUST FOR PUBLIC LAND AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. .PLUMB. ELECT. FIRE PROTECTION AND ARCHITECTURAL PLANS BY KTA. INTERIOR WORK ONLY. NO CHANGE IN USE. NO STRUCTURAL WORK INVOLVED.
   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
300 M ST SE   
02/11/15 
FEDERAL CENTER LP / SAM HOLLEN RAMCO OF DC INC.
B1504255 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR CONFERENCE ROOM. PARTITIONS FINISHES MECHANICAL ELECTRICAL AND LIFE SAFETY. ICI SERVICES
1201 M ST SE   
02/11/15 
CSC / DAMON ELLIS
B1503731 / CONSTRUCTION
SCOPE OF WORK AREA IS 800SQFT TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND FIRE. NO CHANGE OF USE OR STRUCTURAL WORK BEING DONE
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
909 NEW JERSEY AVE SE   
02/26/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DAVID L. HAHN
P1503815 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.