Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
September 22, 2004
March 28, 2015
1st at O, Looking West-Northwest (see more)

A press release sent out this morning says that "fast-growing international chicken restaurant" Nando's Peri-Peri will be coming to the Boilermaker Shops at the Yards, with an expected opening in June of this year. It will be the restaurant's 12th US location, including the one on 7th Street NW in Chinatown and eight others in the DC area.
Nando's would join planned restaurants Bluejacket brewery, Buzz Bakery, and Willie's Brew and 'Que, along with opening-any-second-now Wells Cleaners at the Boilermaker Shops.
If you haven't tried it, "Nando's is known worldwide for its succulent Peri-Peri chicken, marinated for 24 hours, flame-grilled to perfection, and basted to the customer’s preferred flavor and spice."
The press release did not come from Forest City, but they have confirmed the lease.
(And props to reader Jaybird who had this rumor a few months ago, and mentioned it in a recent JDLand comment thread.)
Comments (8)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (1/22/13 11:28 AM)
What happened to Huey's 24/7 Diner?


JD says: (1/22/13 11:38 AM)
I mentioned back in the Agua announcement post that it appeared that the Huey's lease had fallen through. And the banner disappeared soon after.


PJY03 says: (1/22/13 2:24 PM)
I like this, Nando's is a great quick and casual meal.

I walked by the other day, and it doesn't appear that Bluejacket or Buzz are on track to open any time soon.


JD says: (1/22/13 2:29 PM)
Have you been by Bluejacket since their equipment started arriving? Their building permit was approved a week or so ago, and the stuff is arriving. Their head guy told Esquire he's expecting a May opening.

Willie's, who knows. I'm guessing, now that the Hawk n Dove is open, that Xavier will turn his attentions back to Park Tavern and Willie's.



JES says: (1/22/13 3:30 PM)
Re: Willie's, I just don't understand the reasoning behind delaying work on an opening... the lease started when Forest City finished construction/rehab of the building, right? So they're already paying rent, presumably? Why wouldn't you want to open as soon as possible, rent can't possibly be that cheap in that building. Same for Park Tavern, when you think about it


JD says: (1/22/13 3:34 PM)
I'm guessing he was stretched pretty thin (which would also tie in with "selling" his restaurants, or getting a new investor, or whatever it is, since he's still involved). Just may not have had the money and/or resources to do all of them at once (but enough resources to at least be paying the rents). Maybe bit off more than he could chew.


Jaybird says: (1/22/13 5:25 PM)
A great get for you guys.

Caveat (no pun intended!) emptor, as the Peri-Peri menu notes, "even plain is mildly spicy."


conngs0 says: (1/23/13 9:25 AM)
Will definitely be psyched when these places open up. The area around the Yards Park and the Boilermaker Shops is going to be great during the summer - even during non-game days.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
JD on Latest Google Satellite: Also, for north-of-the-freeway folks, the old Providence Hospital is still there...
JD on Latest Google Satellite: I see a building on the 82 I/801 NJ site that I've never noticed before.
MJM on Latest Google Satellite: Amazing to see how the freeway cut right across the city.
JD on Out and About: You know, the first picture in this post. :-)



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15

Recent Issued Building Permits Archive  
1265 1ST ST SE   
08/26/15 
CAPITAL RIVERFRONT HOTEL LLC /
P1508561 / SUPPLEMENTAL
1277 1ST ST SE   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1331 2ND ST SE   
09/01/15 
DC WATER DC WATER / CORMAN CONSTUCTION
AH1500716 / CONSTRUCTION
TUNNEL BORING MACHINE / EQUIPMENT
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
909 HALF ST SE   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
   
08/27/15 
HALF ST SE LLC /
P1508598 / SUPPLEMENTAL
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1500 M ST SE   
08/21/15 
WASHINGTON YACHT CLUB / ZACHARY ZILL
SB1500438 / CONSTRUCTION
SOIL BORING FOR COMPENSATION GROUTING ALONG THE ALIGNMENT OF DC WATER'S CLEAN RIVERS DIV H - ANACOSTIA RIVER TUNNEL. FORTEEN BORINGS TO MAX DEPTH OF 70 FEET BGS 2 INCH DIAMETER GROUT TUBES INSIDE 5.5 INCH DIA CASINGS. DUPLEX ROTARY DRILLING METHOD. REF. PERMIT SB1400400.
125 O ST SE   
08/28/15 
DISTRICT OF COLUMBIA /
R1500073 / CONSTRUCTION
WOOD SHED
   
08/28/15 
DISTRICT OF COLUMBIA / SAMAHA ASSOC.PC
R1500072 / CONSTRUCTION
ONE STORY BRICK STORAGE SHED
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.