Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
June 27, 2005
April 26, 2015
1st at N Place, Looking North (see more)

Within the past few days, readers have sent tweets with photos of brewing equipment being delivered to soon-to-be-Gordon Biersch at 100 M and inside the space at the Boilermaker Shops that will become Bluejacket.
No official timeframe on when either of these restaurants will open, though a Biersch employee told the Post that he "expects the new Biersch branch to be operating in time for the Craft Brewers Conference in March and the Nats' home opener in April."
As for the other beer joint on tap for the neighborhood (see what I did there?), there doesn't appear to be any action so far in the Willie's Brew and 'Que space at the Boilermaker Shops, but with owner Xavier Cervera's long-in-the-works redo of the Hawk 'n' Dove reportedly about to debut, perhaps he'll then be able to shift resources both to Willie's and to the Park Tavern at Canal Park.
UPDATE, 1/17: This Esquire interview with Bluejacket bigshot Greg Engert says that the bar will open "in May."
Comments (8)
   
 
 More About Retail

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (1/15/13 12:44 PM)
I walked by Gorden Biersch last night and they already installed their brewing equipment.


JES says: (1/15/13 1:21 PM)
Is Cervera still deciding whether or not to sell his restaurant group? Or is that saga over at this point? Wondered if that was behind part of the delay in getting the local joints open.


conngs0 says: (1/15/13 1:24 PM)
Great question, JES. It looks like the Park Tavern could be open tomorrow if there was a desire to do so. I was operating on the (completely unsubstantiated) assumption that Cervera put everything on hold because of the possible sale. With a fairly healthy turnout on the ice skating rink this winter, it sure seems like the Park Tavern has missed out on a lot of potential customers.


JD says: (1/15/13 1:29 PM)
Yeah, I should have mentioned that potential sale in the post itself, at least in terms of whether Willie's will see any action (I would think Park Tavern could open soon, as you said). But there's been no news on it one way or the other.


NatsFan says: (1/15/13 2:09 PM)
I was told by an employee at the Skate Park that Cervera did infact sell his restaurant group. I havent found any confirmation of this online though and its complete word of mouth. However it seems to make sense due to the delay in openings.



David Garber says: (1/15/13 2:27 PM)
The word I have re: Park Tavern is that Xavier is still waiting on some permit issues to be resolved, and that they weren't able to open earlier because the certificate of occupancy for the entire building had to be received before pulling restaurant permits. Although this has been the answer since November, I was told yesterday they hope to open in about three weeks. Just the messenger... :)


JD says: (1/17/13 11:18 AM)
Just as a follow up to David... The BID passed to me the certificates of occupancy dated Nov. 15 for all three blocks of the park, including the Park Tavern building. (Skaters wouldn't be able to use the restrooms in the building if it didn't have the C of O.) There may be other permitting issues for the restaurant, but they aren't related to the occupancy.

Also, apparently the sale to the restaurant group has gone through, though Cervera is still involved and part of the new ownership.



David Garber says: (1/17/13 1:17 PM)
Right. Didn't mean to infer that the C of O wasn't received in November, just that they didn't start on some of the other required permits until after that time. As yet another update, Cervera told The Hill is Home that "He estimates that the opening date should be about one month away.." link Now that Hawk N' Dove opens tonight, I'm hopeful for a priority shift down to our neighborhood!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
willinrm on Due South Opening: does anyone have a navy yard/eastern market/capitol hill happy hour website? dat...
Section314 on Due South Opening: First thing back, you can go take pictures of the construction starting at 99 M....
JD on Due South Opening: Me too! :-) I'll be back in the saddle next week, and well refreshed too, wit...
willinrm on Due South Opening: This comment section has become my new source of news!! lol



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15
400 B/O M ST SE   THEFT
 08/03/15
1100 B/O NEW JERSEY AVE SE   THEFT
 07/29/15

Recent Issued Building Permits Archive  
1277 1ST ST SE   
08/11/15 
BALLPARK RESIDENTIAL LLC / RICHARD V CAREY
P1508164 / SUPPLEMENTAL
   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
1150 5TH ST SE   
08/10/15 
DEPARTMENT OF GENERAL SERVICES DC PUBLIC SCHOOL / DEPARTMENT OF G DC PUBLIC SCHOOL
B1511234 / CONSTRUCTION
REVISION TO B1511107 TO CORRECT QUADANT ON ADDRESS FROM 1150 5TH STREET N.E. TO 1150 5TH STREET S.E. TO UPGRADE THE ELECTRICAL SERVICES OF A DISTRICT OF COLUMBIA PUBLIC SCHOOL FROM 1200AMP TO 3 000 AMP.
   
08/11/15 
PEPCO PEPCO
AH1500668 / CONSTRUCTION
INSTALLATION OF CABLE AND METERS
1220 12TH ST SE   
08/13/15 
WASHINGTON GAS LIGHT CO / JOHN GIUSEPPE-RAMCO
B1509350 / CONSTRUCTION
RENOVATIONS TO EXISTING 3RD FLOOR OFFICE SPACE EXELIS AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO CHANGE IN US. NO STRUCT. WORK.
909 HALF ST SE   
08/13/15 
BAKER DC LLC / CHRISTINE LONG
AH1500677 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 11:00PM FRIDAY THRU 11:00PM SATURDAY
   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/13/15 
HALF ST SE LLC / GREGORY E LIGON
E1508399 / SUPPLEMENTAL
   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
1220 HALF ST SE   
08/12/15 
BUFFALO WILD WINGS / NICOLE WHITE; BUFFALO WILD WINGS; GREG CONCANNON
AR49901357 / SUPPLEMENTAL
   
08/13/15 
BUFFALO WILD WINGS / BELA X-PEDITERS PLUS INC.
AH1500681 / CONSTRUCTION
WORK AFTER HOURS 7PM-7AM. 8 / 13 / 2015 TO 9 / 13 / 2015
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/11/15 
MILLER?LONG
TC1500036 / CONSTRUCTION
TOWER CRANE FOR JOB SITE USE
   
08/13/15 
MILLER?LONG MILLER?LONG
AH1500674 / CONSTRUCTION
AFTERHOURS TO PUT UP TOWERCRANE WITH 200 TON MOBILE CRANE SATURDAY 8 / 15 / 2015 AND 8 / 16 / 2015 FROM 5AM TO 9PM
   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1100 NEW JERSEY AVE SE   
08/11/15 
CHRISTOPHER CONDON
PC69159304 / POST CARD
INTERIOR DEMOLITION OF NON-BEARING ELEMENTS IN A SPACE UP TO 5 000 SQUARE FEET (464.5 SQUARE METERS)
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
301 WATER ST SE   
08/12/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.