Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
January 26, 2006
June 2, 2014
1st at I, Looking South-Southeast (see more)

If you're wondering how come I haven't posted that much lately, it's because a few months ago I decided I was only going to post about "big news", and there's been a bit of a lull in that department. But I still do pass stuff along on Twitter, which you can see in the Twitter box here on the JDLand home page and which also mostly gets cc'ed to the JDLand Facebook page. That's where you can keep up all sorts of little things about the neighborhood that aren't really blog-post-worthy.
I think there will be some posts coming before too long--a few things seem to percolating around that may draw me out soon, plus there's that ramp from the outbound 11th Street freeway bridges to northbound DC-295 should be coming before too long (UPDATE, five hours later: yes, indeedy). There's not always a lot of news in December, anyway. And not a lot of stuff to take updated photos of right now.
Just didn't want people to think I'd completely closed up shop.
But, if there's anything that I'm being too lazy to post about that folks want to discuss, have at it in the comments. (Suggested topics for discussion: the Navy Yard keeping their portion of the RIverwalk closed because they haven't yet fixed the security issues with the turnstiles into their campus, and Xavier Cervera perhaps selling off his restaurant empire, including the not-yet-opened Park Tavern at Canal Park and Willie's Brew and 'Que at the Boilermaker Shops.)
Comments (5)
 
 More About JDLand stuff
 All posts: JDLand stuff

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (12/17/12 1:01 PM)
According to the Velocity management, toll brothers will start construction this spring on the north side of velocity lot. It is probably going to take them a year and half to complete. I am pretty sure it will be completed before Twelve12 and Park Chelsea.


B in DC says: (12/17/12 2:16 PM)
Zoolander, this is going to be condos, I assume? Or did you hear?

Also, DCHA will start breaking ground this March on the apartments across from the Marine Barracks on L St between 6th and 7th.


ZoolanderANDtheBoYz says: (12/17/12 2:26 PM)
Nope, I don't think so. No one is going to build 200+ condo building these days. It is just really hard to sell that size condo building (unless all of them are one bedroom and studio units). All the condos that are being built in the city are under 50 units. Right now, it is an apartment market and we probably won't see large size condo for the next several years. The Velocity condo has 200 units and they started selling three years ago and they still have between 20 to 25 unsold units left (mostly two bedrooms).


The Hoff says: (12/17/12 5:32 PM)
The sales office at Velocity spoke of that lot becoming a hotel at some point. This was 3 years ago so who know's at this point.


JD says: (12/17/12 5:44 PM)
Hoff, the remaining two lots on the Velocity block have been purchased this year by Toll Brothers, which only does residential, so the question at this point is only whether the new building will be apartments or condos. When I broke the news of the first lot being purchased link there was no information one way or the other.

And if they do start in 2013, they can finish faster than other projects because they don't have to dig the garage and substructure, which Cohen completed back when Velocity was built.

@B, the Square 882 possible start was what I was alluding to as "percolating" in my above post, but until there's an official announcement, and/or a building permit, I wouldn't write any dates on my calendar. Ditto for Toll. :)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
MJM on Community Center Groundbreaking: Too bad the new name wasn't a reflection of the area rather a housing development but guess it is a ...
JD on Community Center Groundbreaking: (And by the way, I've seen all those stories, and many more--it's the writing about them that I just...
ZoolanderANDtheBoYz on Community Center Groundbreaking: @JD, surgical bills-- no. Narcotics - a brother can hook you up with that.
conngs0 on Community Center Groundbreaking: Nice rendering. It even captures my future Audi R8 driving up the street! Seriously though, I thin...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O L ST SE   THEFT F/AUTO /  07/30/14
L ST SE AND 2ND ST SE   THEFT F/AUTO /  07/30/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  07/29/14
70 B/O I ST SE   THEFT /  07/29/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/28/14
400 B/O K ST SE   THEFT /  07/24/14
1000 B/O 1ST ST SE   THEFT /  07/23/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
08/06/14 
TOLL DC LP / MITCH A. PERMUY
E1407892 / SUPPLEMENTAL
   
08/11/14 
TOLL DC LP / ALBERT J. PEARCE
FB1400108 / SUPPLEMENTAL
1259 1ST ST SE   
08/11/14 
CAPITAL RIVERFRONT HOTEL LLC / CAPITAL RIVERFR HOTEL LLC
AH1400636 / CONSTRUCTION
AFTER HOURS FOR PERMIT NUMBER B1401471 FOR 8 / 12 THROUGH 9 / 11 FROM 5AM TO 7PM MONDAY THROUGH SATURDAY.
1212 4TH ST SE   
08/07/14 
TAKOREAN / FVI 2020
B1410615 / CONSTRUCTION
REVISION TO TL1400052 TO INCLUDE OUTDOOR SUMMER GARDEN WITH 14 SEATS AND 7 TABLES.
1201 4TH ST SE   
08/12/14 
JBG/FEDERAL CENTER LIC / JIM CALABRESE
AN1400129 / CONSTRUCTION
PLEASE EXTEND PERMIT AN1300174 THIS IS THE FIRST EXTENSION AND PERMIT WILL BE VALID UNTIL 1 / 31 / 2015.
1212 4TH ST SE   
08/05/14 
FC 1212 LLC / THE YARDS
TL1400165 / CONSTRUCTION
FIRST TIME TENANT LAYOUT FOR NEW MANAGEMENT OFFICE 2ND FLOOR TOTAL OF 780 SQ FT RENOVATION LIMIT TO MECHANICAL ELECTRIC AND FIRE LIFE SAFETY ONLY
1331 4TH ST SE   
08/14/14 
F. C. 1331 LLC / FVI 2020
B1402843 / CONSTRUCTION
CONSTRUCTION OF A BRAND NEW 11 STORY BUILDING. THE BUILDING IN TOTAL IS 350 000 SQ FT. ADDING 327 RESIDENTIAL RENTAL UNITS 20 000 SQ FT. IN COMMERCIAL SPACE AND 3 BELOW GRADE PARKING LEVELS.
   
08/15/14 
CLARK CONCRETE
AH1400650 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE FROM 7AM TO 7PM FROM SUNDAY TO SATURDAY 8 / 15 / 2014 TO 11 / 15 / 2014
1000 5TH ST SE   
08/07/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
FD1400029 / CONSTRUCTION
FOUNDATION TO GRADE TO INCLUDE UTILITIES
   
08/13/14 
UNITED STATES OF AMERICA /
FD1400132 / CONSTRUCTION
NEW FOUNDATION TO GRADE PERMIT FOR NEW COMMUNITY CENTER INCLUDING UTILITIES. REVISION TO FD1400029 TO REVISE STRUCTURAL DETAILS OF COLUMS.
   
08/20/14 
UNITED STATES OF AMERICA / BRUCE G. PICKETT
E1408304 / SUPPLEMENTAL
1015 HALF ST SE   
08/12/14 
HALF ST SE LLC / SAM HOLLEN RAMCO OF DC INC.
TL1400162 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 1ST FLOOR PERFORMANCE STUDIO SPACE AND OFFICE SPACE. PARTITIONS FURNITURE MECHANICAL ELECTRICAL AND LIFE SAFETY. CBS
   
08/15/14 
HALF ST SE LLC / ROBERT L HUNTER
M1402951 / SUPPLEMENTAL
   
08/16/14 
SAM HOLLEN / DONALD VEALS; SAM HOLLEN; DONALD VEALS
E83010192 / SUPPLEMENTAL
200 I ST SE   
08/08/14 
DANIEL RILEY / OMAR BIAGAS; DANIEL RILEY; JOHN BIAGAS
E47247428 / SUPPLEMENTAL
41 L ST SE   
08/20/14 
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) / SAMIR ALQUTRI - GEOTECHNICAL SOLUTIONS INC.
SB1400402 / CONSTRUCTION
GSI PLANS TO DRILL 4 SOIL TEST BORINGS TO CONFIRM SOIL STRENGTH WITH A HOLLOW-STEM AUGER EQUIPPED WITH A SPLIT SPOON SAMPLER FOR THE SPT N-VALUE TESTS DOWN TO A MAXIMUM DEPTH OF 80 FEET BELOW EXISTING GRADES. ALL BORINGS WILL BE DRILLED TO THE MAXIMUM DEPTH OR AUGER REFUSAL WHICHEVER OCCURS FIRST. THE BORE HOLES DIMENSION WILL BE 3.25 INCHES AND SHALL BE GROUTED UPON COMPLETION.
601 L ST SE   
08/06/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / JOSEPH M MAGNOLIA
P1407161 / SUPPLEMENTAL
20 M ST SE   
08/06/14 
SOUTHEAST REALTY LLC /
P1407613 / SUPPLEMENTAL
100 M ST SE   
08/06/14 
SQUARE 743 INC /
P1407610 / SUPPLEMENTAL
   
08/16/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
901 M ST SE   
08/14/14 
CARLTON RAY
AH1400642 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
08/14/14 
CARLTON RAY
AH1400641 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1111 NEW JERSEY AVE SE   
08/12/14 
NJA ASSOCIATES LLC / COLIN CLARK
B1308085 / CONSTRUCTION
CONSTRUCT A NEW 13 STORY APARTMENT BUILDING WITH THREE BELOW GRADE PARKING LEVELS FIRST FLOOR RETAIL A PRIVATE SWIMMING POOL PROJECTIONS OF BAY WINDOWS 324 UNITS TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND ELEVATOR WORK.
1500 SOUTH CAPITOL ST SE   
08/04/14 
LIVE NATION / DAVID VEGA
AH1400629 / CONSTRUCTION
TO CLOSE OFF STREETS FOR LOADING AND UNLOADING OF STADIUM EVENTS 7PM - 7AM
300 TINGEY ST SE   
08/05/14 
FC BOILERMAKER LLC / PHILLIP B MOBLEY
M1402818 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.