Since January, 2003
            
 (a random before-and-after moment)
September 22, 2004
February 26, 2017
South Capitol at Potomac, Looking South-Southeast (see more)

A flyer just sent out by the Capitol Riverfront BID is announcing that Canal Park will have a two-day Grand Opening, on Friday, Nov. 16 and Saturday, Nov. 17, kicking off with a ribbon cutting with the mayor and other dignitaries at 11 am on the 16th.
The park's much anticipated ice rink will be the center of attention for the rest of the festivities, and it will be open from noon to 9 pm on Friday and 10 am to 10 pm on Saturday--admission is $8 for adults and $7 for kids/seniors/military, with skate rentals costing $3. There will also be "ice performances" at the top of each hour from noon to 4 pm, and coaches available to help new skaters.
Saturday will also have live music in the park from 10 am to 3 pm, various art-y options, and a "Get Active" program from Results Gym with boot camp, a kids obstacle course, and a Zumba class.
Considering that it was nine years ago this month that I first wrote about the plans to remove the school buses from the park's three-block site along 2nd Street between I and M, SE, I'd say this opening indeed qualifies as a milestone in the neighborhood. See my Canal Park project page for photos of what the footprint has gone through over the years.
(The BID also says that the management of Kruba Thai and Sushi says that their restaurant in the ground floor of the Foundry Lofts at the Yards is opening on Monday, Nov. 12. Will that come true as well? We shall see!)
UPDATE: I should add there's no word in this whether the Park Tavern restaurant will open on this same weekend--my guess is that the pressure is pretty strong to have it open in some format, but there's no announcement.
Comments (14)
   
 
 More Recent News

JDLand.com Home

Comments

MJM says: (10/25/12 7:19 PM)
They were just having a walking through of some kind with the outdoor music pumping with the flashing lights on the south end of the rink in synch with the music. The inside of the restaurant looks great!
Can't wait to skate!


David Garber says: (10/25/12 11:04 PM)
The Park Tavern twitter account (not sure who runs it...) says they'll be open same day as the rink -- but I'm meeting with the owner next week and will see if I can get confirmation.


JD says: (10/26/12 11:10 AM)
(I'll put this in the comments, so just the real loyal readers see it :-) ) A longtime reader who was at the opening of the new Nando Peri-Peri in Alexandria tells me that a Nando rep told him that Nando is coming to "the neighborhood near the ballpark," "in a building with lots of glass by the Navy Yard," shooting for May 2013. Certainly sounds like the Boilermaker Shops to me.... But of course, 'tis but a rumor at this point.



MJM says: (10/26/12 3:20 PM)
Or maybe the Lumbershed? Thats gonna be lots of glass too


JD says: (10/26/12 3:22 PM)
But not a May 2013 opening date, I doubt.


JD says: (10/26/12 3:29 PM)
There is also still the one other retail space in the Foundry Lofts, which could qualify as lots-of-glass (in comparison to other DC buildings, not in comparison to Boilermaker and the Shed :-) ).


MJM says: (10/26/12 6:36 PM)
Oh yeah I see May 2013 now - who ever reads sentences till the end these days


JD says: (10/26/12 6:37 PM)
My fault, it was longer than 140 characters.


AlmostSoutheast says: (10/26/12 7:05 PM)
Nandos...talk about a confused restaurant. They're all over London and are like a slightly fancy Boston Market with brutally mediocre sides and a price tag of a mid-range sit down restaurant. A wrap and not as good McDonald's fries is like 18 usd and takes 15 minutes to make...like they're surprised people are ordering chicken from the hours of 6 until 8. There are so many Peruvian chicken places that errrrinate on this place in the states...no clue what the market is.


ZoolanderANDtheBoYz says: (10/27/12 11:56 AM)
Hold on....Nando and five star restaurant in one building?? NO NO NO...


NatsFan19 says: (10/28/12 7:36 AM)
As a London resident, the negative comments on this thread about Nandos is shocking as it is a staple of our city. Sounds a bit pretentious if you're too good for Nandos...


AlmostSoutheast says: (10/28/12 11:02 AM)
@NatsFan19: I'm guessing you were referring to my post. I was definitely exaggerating a bit and I do like the taste and concept of Nando's (even buy the sauces at the grocery store), but it is too expensive and the quality of the sides are inconsistent with the chicken. I'd be interested to hear the prices of the Nandos because I can't imagine a direct port of prices over to the States would fly. I'm a London resident as well and sadly things being unusually expensive is another staple of London...even compared to other major cities.


Deltaflot says: (11/14/12 1:39 PM)
They've been spraying water manually to form the ice sheet for the last few days. I would imagine the ice resurfacer will be used in a day or so from it's shed on teh northern end of the ice sheet. Some workers already managed to break on pane of the glass surrounding the ice sheet. Hopefully they have extras.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Top News
  

dcgent on April Construction Report: Since I started the rumor Dacha was out, i should kill it--Dacha reportedly says...
Packinblackandred on April Construction Report: @Ampersand The bikeshare dock is still there, just moved a little! I had the s...
Ampersand on April Construction Report: I had an unpleasant surprise this morning when I attempted to dock a bikeshare a...
NavyYardGuy on April Construction Report: I'm down. 5/17 w/ JD and the crew.
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/24/18
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/23/18
1100 B/O 2ND PLACE SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1100 B/O NEW JERSEY AVE SE   SEX ABUSE
First Degree Sexual Abuse
 04/17/18
400 B/O M ST SE   THEFT
Shoplifting
 04/17/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/17/18
UNIT B/O N ST SE   ROBBERY  04/14/18
100 B/O I ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/12/18
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/12/18
1200 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/09/18
150 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/07/18
1000 B/O 3RD ST SE   BURGLARY
Burglary One
 04/07/18
1200 B/O NEW JERSEY AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 04/05/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/01/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18

Recent Issued Building Permits Archive  
1331 2 ST SE   
04/02/18 
DISTRICT OF COLUMBIA / MARK HARLOW CLIFFORD
SB1800225 / CONSTRUCTION
Application for Well Abandonment Workplan Approval for the abandonment of 8 monitoring wells and 21 inclinometers at the Main Pumping Station site for the DC Water Clean Rivers Project, Division I, installed under Permit Number SB1400419.
1100 2ND PL SE   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801710 / SHOP DRAWING
Install 1 New G2S 3500LBS @350FPM, Elevator 2; 13 Floors
   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801712 / SHOP DRAWING
Install 2 New G2S Elevators - 3500LBS@35FPM Elevator 1, 12 Floors
1331 2ND ST SE 20003   
04/05/18 
DC WATER / DAVE LEVINE
AH1800744 / CONSTRUCTION
After Hours work for structure excavation in support of DC Water, Corrman Construction 301-343-5417.
1300 4TH ST SE   
04/17/18 
null / DONNA G GRAHAM
AH1800863 / CONSTRUCTION
WR #3476633-WARD 6-20003-VAETH / BRUNO - PEPCO CREWS WILL BE WORKING THE 1200 - 1300 BLK OF 4TH ST SE - INSTALLING NETWORK TRANSFORMER AND INSTALLING PRIMARY CABLES - STARTING THURSDAY 4 / 19 / 18 UNTIL 5 / 19 / 18 - MONDAY THRU FRIDAYS AT 10PM UNTIL 10AM AND ON SATURDAY AND SUNDAYS FROM 6AM TIL 8PM.
1346 4TH ST SE   
04/10/18 
ALAN OWINGS / ROBERT HENRY
AH1800796 / CONSTRUCTION
After Hours Permit for 04 / 16 / 18 from 9AM to 7PM to perform facade, interior unit framing and drywall work, and interior Mechanical, Electrical, Plumbing and Sprinkler Rough-In.
82 I ST SE   
04/02/18 
GDVC EYE STREET LLC / null
FB1800055 / SUPPLEMENTAL
150 I ST SE   
03/29/18 
null / JOHN THOMSON 3018645080
E1805337 / SUPPLEMENTAL
300 M ST SE 400   
04/09/18 
FEDERAL CENTER LP / null
M1801970 / SUPPLEMENTAL
300 M ST SE STE# 400 20024   
04/05/18 
CHARLES SMITH / EUGENE AHNS 3012811497
E1805597 / SUPPLEMENTAL
300 M ST SE STE# 400   
04/12/18 
FEDERAL CENTER LP / null
P1805161 / SUPPLEMENTAL
401 M ST SE   
04/03/18 
TETRA TECH C/O DOEE / JESSICA REICHARD
AH1800767 / CONSTRUCTION
After hours permit for manhole access to complete inspections for DOEE Anacosta River Sediment clean up project, work hours between 7pm and 7am Monday thru Friday. Rolling work zones for all manhole access under permit # PA10374319-R1
800 NEW JERSEY AVE SE   
04/05/18 
SQUARE 737 LLC / null
P1804974 / SUPPLEMENTAL
   
04/09/18 
SQUARE 737 LLC / null
E1805700 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/02/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800715 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
04/11/18 
CONSOLIDATED RAIL CORPORATION / DEVIN MURDOCK
SB1800265 / CONSTRUCTION
Drill 8 borings to 40ft. Convert 4 borings into 1" temporary wells, collect groundwater from each well and abandon borings.
1100 NEW JERSEY AVE SE 2ND FLOOR   
04/20/18 
SQUARE 742 LLC / null
E1806043 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/18/18 
null
E1805988 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / GARY BRENT; BRENT
SG1800260 / CONSTRUCTION
Install 1 illuminated wall sign, 1 illuminated window sign and 1 window vinyl decal sign - Peets Coffee
1100 NEW JERSEY AVE SE 5TH FL   
04/19/18 
SQUARE 742 LLC / DOMINIC E TOTARO 301-725-1998
M1802089 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/13/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1804348 / CONSTRUCTION
INTERIOR RENOVATIONS TO OFFICE SPACE ON THE 5TH FLOOR. **DEMOLITION, LEVEL 2 ALTERATION
   
04/19/18 
SQUARE 742 LLC / PEDRO C. CASTILLO 3019219056
E1806025 / SUPPLEMENTAL
   
04/19/18 
SQUARE 742 LLC / null
E1806015 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/06/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ACCUPERMIT LLC AS AGENT
B1803009 / CONSTRUCTION
Interior alterations for new tenant in existing commercial space to include partitions, mill work, electrical and plumbing fixtures, flooring and wall coverings, dining area furniture and kitchen equipment for a A-2 restaurant with 49 proposed occupancy.
125 O ST SE   
03/29/18 
DISTRICT OF COLUMBIA / JAMES M. HALLER
P1804624 / SUPPLEMENTAL
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801762 / SHOP DRAWING
I New G2S Elevator - 3500LBS @ 200FPM (7 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801763 / SHOP DRAWING
Install 1 New G2S Elevator - 3500LBS @ 200FPM (6 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801761 / SHOP DRAWING
Install 1 New G2S Elevators 4000LBS @ 200FPM (7 Floors)
71 POTOMAC AVE SE 20002   
04/19/18 
null / STEVE GRIFFIN
BP1802939 / POST CARD
71 POTOMAC AVE SE   
04/17/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
FD1800020 / CONSTRUCTION
Foundation only for new residential building
227 TINGEY ST SE   
04/12/18 
UNITED STATES OF AMERICA / STEPHEN J. EXELBERT
P1805022 / SUPPLEMENTAL
300 TINGEY ST SE   
04/12/18 
MERCURY LLC / WILL TEASS
B1803433 / CONSTRUCTION
INTERIOR FIT-OUT / EXTENSION OF EXISTING TENANT SUITE (APPROVED UNDER B1605215) INCLUDING NEW MECHANICAL AND ELECTRICAL WORK. **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.